Improving the Cardiff and Valley Railway

Slides:



Advertisements
Similar presentations
CityCo, Piccadilly Hoteliers Forum
Advertisements

Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
/02-July-141 CP5 Enhancements Delivery Plan Audrey Laidlaw Lead Strategic Planner.
Karl and Taavet.  This map portrays the steam trains and narrow guage railways in Wales.
Waterbury Branch Line Improvements opportunities to support sustainable development Tom Maziarz, Chief of Planning Connecticut Department of Transportation.
1West of England Area Rail Studies - David Crockett 08/02/2012 West of England Area Rail Studies Outline Summary This presentation summarises the work.
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
Delivers top speed of 90 mph in North Wales for first time Partnership funding £500k Welsh Assembly, circa £1m Railtrack Major investment in track, signalling,
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
Transport Investing in Regions SEATS Meeting 17 February 2012.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Item 10. Rail Update Great Western Franchise 7 March 2012.
CHESHIRE & WARRINGTON SUBREGIONAL TRANSPORT STRATEGY Delivering & Sustaining a £35bn Economy.
1 Northern Hub – the business case Duncan Law 26 June 2012.
Transport Update Chris Carter Transport Strategy Manager.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
1 Date SINTROPHER Regional Workshop David Morgan.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Aberdeen City Briefing 13 th May Project Scope – Phase 1 Transport Scotland’s specification for delivery by Mar 2019: Half hourly service between.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
Infrastructure Ontario
Linking Northern, Central and Southern
TfN Freight AND RAIL UPDATE
REMOVING LEVEL CROSSINGS IN MAIN STREET CONFERENCE 2016
Rail North Manchester Airport Transport Forum
MetroWest Phase 2 LGA PT Consortium Visit 7th September 2017
West of England Joint Transport Study
Potomac Yard Metrorail Station
Cardiff Royal Infirmary (CRI) – Health and Wellbeing Centre
A Position Statement 14th October 2016
Train Performance Challenges
Strategic Transport Forum Friday 15th September 2017
The Freight RUS - a draft for consultation
Network Rail Infrastructure Limited Interim Results 2006/07 1 April – 30 September November 2006.
Cardiff.
GTO’s support for the Romanian logistic hub project TransLogistica, Bucharest, Marek Retelski, Senior Policy Advisor.
A future benefit for the South Cheshire infrastructure
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
Fishermans Bend Draft Framework Transport Recommendations
North Wales Main Line - linespeed increase
Great Western Railway GWR’s Rail Vision and Community Rail
A Strategic Rail Freight Interchange for the North East?
A future benefit for the South Cheshire infrastructure
Delivering East West Rail
Highways UK Conference Liz Hunter West Yorkshire Combined Authority
East Coast Route Study November 2016 update.
Cardiff.
Martin Tugwell Programme Director 12 September 2018
New Public Transport Infrastructure
How can we make the longest walking /cycling tunnel in Europe
Cardiff.
Local Industrial Strategies
Central Avenue Rapid Transit
Presentation To Cherrywood Inquiry (Luas B1)
Kent Route Study – Draft for Consultation
Great Eastern Mainline
Delivering the North East Chelmsford Growth Ambition
North Wales Main Line - linespeed increase
Possessions Update Great Western Railway Andy McRae
Presentation transcript:

Improving the Cardiff and Valley Railway More Trains, More Seats and a More Reliable Rail Service CASR Presentation

Today’s challenges Aged signalling system that was installed in the 1960s Inefficient track layout built in the 1930s, causing rail bottleneck and limiting capacity growth Limited infrastructure capability to meet burgeoning passenger demands: - growth comparable to increase in Manchester and Leeds with 8% growth per annum. Infrastructure not compatible with electrification CASR Presentation

Meeting tomorrow’s needs Modernise signalling infrastructure with new technology to improve rail performance Install electrification compatible computerised signalling system to pave way for the upgrades in the area, including the railway on Rhymney Valley Remodel track layout at Cardiff East Junction to remove bottleneck and enable trains to run bi-directionally Extra track on “Treforest Curve” (between Cardiff West Junction and Ninian Park, by Canton) to accommodate more trains Increase frequency of service of City Line for extra trains on Merthyr line Upgrade freight loop at Cogan for passenger trains to improve delivery reliability CASR Presentation

Meeting tomorrow’s needs Create four through platforms at Cardiff Queen Street and Cardiff Central stations to enable more Valley services to run. Extra bay platform at Cardiff Queen Street to facilitate more Valley services by accommodating the shuttle service to Cardiff Bay Extra bay platforms and tracks at Barry, Pontypridd, Caerphilly and Tir-phil to allow more trains to run more frequent services from Cardiff New station entrances at the south side of Cardiff Central and at Cardiff Queen Street, associated with the new platforms New lifts at Cardiff Central, Queen Street and Pontypridd Ramps at Tir Phil station CASR Presentation

A major transformation CANTON DEPOT Newport Bridgend Radyr Cardiff Central Queen Street Ninian Park Grangetown Cogan Jcn. Cardiff Bay Bridgend (via Vale of Glamorgan) Rhymney Landough Loops Penarth Curve South Jcn Penarth Curve East Penarth Curve North Penarth Note. Not to scale and not all points and crossings, and sidings shown for clarity. Cadoxton Barry Jcn. Barry Island. Cardiff Central: extra platform and track to serve the Valleys services and improved station south entrance Doubling Treforest Curve Cogan freight loop: improved for passenger trains use Barry Town station: extra platform and track Rhymney Valley: new bay platforms and track at Caerphilly and Tir-Phil Increase City Line frequency Canton Depot: Extra depot access/egress Pontypridd: New bay platform and turnback facilities Cardiff Queen St: Improved station entrance, extra platforms and tracks CASR Presentation

A better performing railway 33% boost in infrastructure capacity along the Central corridor, allowing a total of extra four trains per hour to/from the Valley area to run from/to Cardiff Longer platforms to enable 6-car trains to operate and potentially increasing seat capacity by a further 50% Improved accessibility and station environment at Pontypridd, Cardiff Central, Cardiff Queen Street and Tir-Phil Improved reliability to rail service with a more robust rail infrastructure More cost-efficient to operate the railway CASR Presentation

Robust delivery strategy Aberthaw to Cowbridge Rd (2013) Bargoed Rhymney Rhymney to Queen St (2013) Barry to Ninian Park/Radyr (2014) Ystrad Mynach Cwmbargoed Marshfield to Newtown (2014) Cardiff Central (Christmas 2014) Coryton Leckwith to Llantrisant (2015) Heath To Pontypridd, R:C Radyr Cardiff :Newport Port Talbot :Cardiff R:C Cardiff Queen Street Bridgend SWCC Fords Aberthaw Barry Cardiff Bay PSB Cowbridge Road Cardiff Central Barry Island Penarth To Port Talbot / Swansea Cardiff Canton Depot CASR Presentation

“Hub and Spoke” contract management Target to award contracts for Signalling, E&P, Telecoms, Track and Civils (building and signalling) by end of 2011 CASR Presentation 8

Optimise delivery; minimum disruption Planning well ahead Optimise delivery by building on existing planned work Joint working with colleagues from Arriva Trains Wales and First Great Western and Freight Operators Avoid closing the railway during four major events: RBS Six Nations Rugby Summer period especially on Vale of Glamorgan and Barry lines Rugby Autumn Internationals Festive period leading up to Christmas and the sales afterwards! CASR Presentation

A cost-efficient investment Jointly funded by Network Rail, Department for Transport and the Welsh Assembly Government More than £200m, combining signalling, track and station improvement work Working to achieve cost efficiency targets set by ORR CASR Presentation

Immediate next steps Tendering for contractors Maintain support from Welsh Assembly Government, key local authorities and industry stakeholders Begin detailed signalling design and on-site preparatory work i.e. civil engineering works for equipment bases and track preparatory works. CASR Presentation

Our partners CASR Presentation