RTDF Overview of Data Analysis & Status of “Consesus Items”

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Settlement Update Austin Rosel ERCOT February 27, 2017.
Hourly Offers Schedule Update Examples
Exceptional Fuel Costs in LMP
ERCOT Market Design & Operations
Current FRRS Language & Explanation of Posted Data
General Overview Of Resource Costs
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Resource Cost Working Group
A Midsummer Night’s DREAM
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

RTDF Overview of Data Analysis & Status of “Consesus Items” John Dumas Director Wholesale Market Operations ERCOT October 10, 2011

ERCOT Methodology To Calculate Change in PNM for Different Constant Floors Consider only the NSPIN deployment intervals in which load exceeds the load at the time of the deployment For each level of price floor, assume that floor price will set the new System Lambda during the deployment Assume FIP price = $4/MMBtu. i.e. Peaker Operating Cost = 10*FIP = $40/MWh Additional PNM is calculated for the SCED intervals where the difference between the new System Lambda and original System Lambda is positive. Reduce PNM for SCED intervals where NSPIN not deployed and Original System Lambda >=$2999/MWHr. This is based on the assumption that online (non-QSGR and QSGR) NSPIN capacity always available to SCED. October 10, 2011

ERCOT Methodology: Change in PNM for Different Constant Floors (12/1/2010 – 8/29/2011) All NSPIN deployments for capacity considered. Total NSPIN deployment hours = 257.5 hours Two scenarios considered All NSPIN deployment for capacity hours where the load exceeds load at time of deployment = 194.9 hours All NSPIN deployment for capacity EXCLUDING February 2nd event and 1st week of August = 120 hours Floor level $/MWh Additional “PNM” when NSPIN deployed Scenario 3 a) - ALL Additional “PNM” when Non-Spin deployed Scenario 3 b) – Exclude Feb 2nd & 1st week of August Reduction in PNM when Non-Spin NOT deployed 72 $2,803 $2,129 $-8,656 180 $17,149 $12,480 $-8,337 250 $27,195 $19,513 $-8,130 650 $91,852 $62,310 $-6,948 1,000 $151,299 $101,645 $-5,913 2,000 $322,323 $214,511 $-2,958 October 10, 2011

ERCOT Methodology: Change in PNM for Different Constant Floors (12/1/2010 – 8/29/2011) Theoretical additional PNM contribution calculated by taking the difference between the floor and the maximum of actual system lambda or $40. This assumes that the floor sets prices for the 194.9 hours in which Non-Spin was deployed for capacity and load was high. October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology To Calculate Change in PNM for Linearly Varying Floors Consider only the deployment intervals in which load exceeds the load at the time of the deployment. However, NSPIN capacity will not set the price for all these deployment intervals. Consider the floor to be sloped for the NSPIN capacity portion of the Energy Offer Curve: Online (non-QSGR & QSGR) : $250/MWhr to $1000/MWHr Offline: $1000/MWHr to $3000/MWHr NSPIN portion of the Energy offer curve will set price when the difference between the UPWARD room available to SCED discounting LSL injection from QSGR and offline Resources is LESS than NSPIN deployed. Based on the MW amount of NSPIN required to meet load, calculate the New System Lambda using the sloped floor. Additional PNM is calculated for the SCED intervals where the difference between the new System Lambda and original System Lambda is positive. October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology To Calculate Change in PNM for Linearly Varying Floors 2 result presented based on different assumptions SCENARIO 1: Snapshot of deployed MW at the time of deployment & LSL 30-min into the deployment  Keep constant throughout the deployment period SCENARIO 2: Data posted on RTDF meeting page BOTH uses HDL_BELOW_SWCAP rather than HDL October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology To Calculate Change in PNM for Linearly Varying Floors Clarification on Data posted to RDTF meeting page used in Scenario 2 Resource categorization by Offline, Online, and Quick Start type is done based on telemetry at the initial time of deployment. Any resources not in the Online or Quick Start categories determined at the time of Non-Spin Deployment are considered as Offline resources. Effects of telemetry error, shifting of NSRS responsibility to other resources or different Combined Cycle modes has not been taken into account. October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 1 results All NSPIN deployments for capacity considered. Total NSPIN deployment hours = 257.5 hours Two scenarios considered All NSPIN deployment for capacity hours where the NSPIN capacity sets price = 84.5 hours All NSPIN deployment for capacity EXCLUDING February 2nd event and 1st week of August where the NSPIN capacity sets price = 48.3 hours Additional “PNM” when NSPIN deployed Scenario 3 a) - ALL Additional “PNM” when Non-Spin deployed Scenario 3 b) – Exclude Feb 2nd & 1st week of August $57,937 $37,521 October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 1 results 84.5 hours 27.02 hours 16.25 hours October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 1 results 48.3 hours 9.17 hours 8.87 hours October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 2 results All NSPIN deployments for capacity considered. Total NSPIN deployment hours = 257.5 hours Two scenarios considered All NSPIN deployment for capacity hours where the NSPIN capacity sets price = 67.9 hours All NSPIN deployment for capacity EXCLUDING February 2nd event and 1st week of August where the NSPIN capacity sets price = 39.1 hours Additional “PNM” when NSPIN deployed Scenario 3 a) - ALL Additional “PNM” when Non-Spin deployed Scenario 3 b) – Exclude Feb 2nd & 1st week of August $31,671 $23,104 October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 2 results 67.9 hours 19.4 hours 5.5 hours October 10, 2011

ERCOT’s Interpretation of Luminant’s Methodology ASSUMPTION SET 2 results 39.1 hours 7.3 hours 3.3 hours October 10, 2011

Estimate Effect Of Different Constant Floors On System Lambda for Non-Spin Deployments (12/1/2010 – 8/29/2011) Corresponding to the PNM additional revenue based on ERCOT methodology for the different floors, calculate the impact on System Lambda for 7 X 24 and 5 X 16 time blocks. All NSPIN deployments for capacity considered – NO EXCLUSIONS. Calculate the time-weighted ( by SCED interval duration ) average of system lambda from 12/1/2010 to 8/29/2011. This is the original price (system lambda) for the 7 X 24. Calculate the change in system lambda for each SCED interval during non-spin deployment for each floor . Note : Similar to the PNM change we are only looking at SCED intervals where the GTBD >= Initial GTBD at time of Non-Spin deployment and applicable floor would have set price. October 10, 2011

Non-Spin Deployments (12/1/2010 – 8/29/2011) Estimate Effect Of Different Constant Floors On System Lambda Original System Lambda ($/MWHr) and corresponding increase in System Lambda for different floors Increase to System Lambda for Various Floors Original System Lambda October 10, 2011

Non-Spin Deployments (12/1/2010 – 8/29/2011) Estimate Effect Of Different Constant Floors On Heat Rate (5X16) Original Heat Rate (MMBTU/MWHr) and corresponding increase in Heat Rate for different floors (5X16). Assume FIP=4 Original Heat Rate Increase to Heat Rate for Various Floors October 10, 2011

RTDF Status on “Consensus Items” Based on RTDF understanding of “consensus items”, developed draft NPRRs: Offers should be at system wide offer cap (SWCAP) for Responsive Reserve & Regulation Up service portion of the Energy Offer Curve. Draft NPRR: “EOC Requirements for Generation Resources Assigned Regulation Up and Responsive Reserve Services”. No ERCOT system change Implemented via QSE submission of Energy Offer Curve. October 10, 2011

RTDF Status on “Consensus Items” Deploy RUC units for capacity insufficiency at the offer cap; RUC for system capacity should be offered liked mothballed RMR. Draft NPRR: “Requirement That Energy From Generation Resources Committed by the DRUC or HRUC Processes be Dispatched by SCED at the SWCAP”.  Requires ERCOT system change. This NPRR conflicts with NPRR 416 “Removal of the RUC Clawback Charge for Resources Other than RMR Units” October 10, 2011

RTDF Status on “Consensus Items” Online non-spin units and quick start units should always be offered in SCED and deployed by SCED. Draft NPRR: “Standing Non-Spin AS Deployment in the Operating Hour for Generation Resources Providing Online Non-Spin AS in the Operating Hour”. No ERCOT system change Implemented via QSE telemetry. ERCOT should deploy non-spin in increments smaller than a thousand MW. No draft NPRR provided. ERCOT already complies.  Plan to review current procedure to determine improvements (if any). October 10, 2011

RTDF Status on “Consensus Items” Prices should be at system wide offer cap when ERCOT deploys load resources or EILS – re-price Energy after Load deployments. No draft NPRR provided. ERCOT provided “Dynamic Price Adder” concept. Requires ERCOT system change. Some market participants have proposed including a “Make Whole” Payment provision to this concept. Morgan Stanley has proposed extending the “Dynamic Price Adder” concept with “Make Whole” payment for ALL Reliability deployments. October 10, 2011