API SC19 HPHT Template (Proposed as SC19TR1)

Slides:



Advertisements
Similar presentations
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Advertisements

2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
API Subcommittee 6 Winter meeting 2015 – TG1 Pipeline and Valves Standards Report Rick Faircloth January 4 th, 2014.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
Task Group G Report January 17, 2003
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
March, 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WG-TG4 Opening Report Mar03] Date Submitted:
Impact on SC 6 Documents by Kenneth Young
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
API SC6 Valves and Wellhead Equipment
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
First 8 slides are what was presented in San Fransisco…
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
Development of a specification
API 17H TASK GROUP January 15, 2013.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
IEEE Motions in July Plenary DCN:
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Discussion Points API RP 17A Task Group Members
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
TGm Closing Report – May 2010
TGaj Editor Report for LB226
Task Group G Report January 17, 2003
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
API SC6 Valves and Wellhead Equipment
TGaj editor report for Sponsor Ballot
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16A January 24, 2019 Winter Conference – San Antonio
API RP 59 Well Control Operations Chair – Tom Proehl
TGaj editor report for Sponsor Ballot
Presentation transcript:

API SC19 HPHT Template (Proposed as SC19TR1) TG Chairs: Darren Bane (BHI) & Jorge Cuesta (BP) January 17, 2017 Subcommittee 19

Task Group Group: SC19 HPHT Template (SC19TR1) Chair: Darren Bane (BHI) Number of Standards and RPs: 1 Potential Technical Report Meetings in last 12 months: 4 Date Manufacturers Consultants Operator/User API Staff Total Number 7 March 2016 5 2 1 8 29 March 2016 6 4 10 12 April 2016 8 May 2016 3 Total 36 January 17, 2017 Subcommittee 19

SC19TR1 Status: SC19 HPHT Template, SC19TR1 (85%) Document Title: SC19 HPHT Technical Report Scope: HPHT template to provide guidance to task groups incorporating high pressure, high temperature requirements into revised (or new) SC19 specification / standards Focus of change: Newly created document, based heavily on HPHT annex from API 14A and API 11D1 January 17, 2017 Subcommittee 19

SC19TR1 Current Status Document fully written with input from diverse companies / SME Ballot in August 2016 - did not pass minimum response of 50 % (Actual - 47%) 240 comments wrong API format used for TR results show there is confusion with the intent of the document and voting protocol Plan to discuss in SC19 Winter Meeting on path forward Propose follow up meeting after SC19 discussion 14L TG on hold for resolution January 17, 2017 Subcommittee 19

Document Designation Functional Specification Technical Specification Design Verification Design Validation Design Validation Test Report Manufacturing Requirements January 17, 2017 Subcommittee 19

Questions or Comments? January 17, 2017 Subcommittee 19