SPANISH HUB DEVELOPMENT

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Draft document – Work in progress
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
XBRL AND BANKING SUPERVISION José María Roldán Director General of Regulation, Banco de España Chair, XBRL España Chair, Committee of European Banking.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Energy Agency of the Republic of Serbia
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Eric Peirano, Ph.D., TECHNOFI, COO
Improvement of transparency of regional Virtual Trading Points in SSE
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
10 year investment plan ERGEG approach and contribution
Transparency Project GRI NW Region
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Harmonization of Cross Border Transmission Tariffs between
Gas Regional Investment Plans
Ben Voorhorst, President, ENTSO-E
Background and Process
37th IG Meeting South Gas Regional Initiative
GRI NW European Energy Work Plan 2011 – 2014
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
ACER’s view on the future role of the Gas Regional Initiative
Draft document – Work in progress
WG Belgian Grid Implementation Network Codes.
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Improvement of transparency of regional Virtual Trading Points in SSE
29th April 2014 Teleconference
CESEC Energy Community Project Monitoring
24rd SG meeting 8th february 2018
Gas balancing – where next
Improvement of transparency of regional Virtual Trading Points in SSE
37th IG Meeting South Gas Regional Initiative
Baltic Energy Market Interconnection Plan (BEMIP)
Implementation of the Network Code Balancing in the Netherlands
Eric Peirano, Ph.D., TECHNOFI, COO
Walter Boltz Chairman, CEER Gas Working Group
26th February 2015 Teleconference
DRAFT DG TREN Staff Working Paper on LNG
GRI NW European Energy Work Plan 2011 – 2014
12th December 2014 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Meinhard Janssen GIE Board Member
Improvement of transparency of regional Virtual Trading Points in SSE
ACER’s view on the future role of the Gas Regional Initiative
The Investment plan for Europe: Stock Taking and Next Steps
BALKAN GAS HUB EAD Supporting gas balance while enabling trading.
Presentation transcript:

SPANISH HUB DEVELOPMENT 17th IG meeting 2nd November 2011

BACKGROUND Background OTC natural gas trade in Spain has taken place since the beginning of the liberalisation process triggered by the new regulatory framework (1998 Hydrocarbons Law transposing Directive 98/30/EC). Gas exchanges take place in the transmission network, LNG plants and underground storages. In 2005 Enagás implemented the exchange platform MS-ATR, connected to Enagás’ logistic system SL-ATR. All transactions in the system are tracked by this platform. While the volume already reached in late 2010 a monthly churn rate value of 2.8, such exchanges are made without a public price. 20,000 40,000 60,000 80,000 100,000 ago-02 nov-02 feb-03 may-03 ago-03 nov-03 feb-04 may-04 ago-04 nov-04 feb-05 may-05 ago-05 nov-05 feb-06 may-06 ago-06 nov-06 feb-07 may-07 ago-07 nov-07 feb-08 may-08 ago-08 nov-08 feb-09 may-09 ago-09 nov-09 feb-10 may-10 ago-10 nov-10 feb-11 Demanda de gas Volumen intercambiado GWh/month UGS 0.5% LNG LNG Transmission Transmission 44.3% 44,3% 55.3% 55,3% Number of exchanges 2010 UGS Transmission 0.5% 6.9% LNG LNG 92.6% 92,6% Volume exchanged 2010

CONTEXT The project is being developed consistently with: The future vision of the European market operation integrated in the "Gas Target Model“, which requires as a basis for the appropriate functioning of energy markets the interaction between virtual exchange points “hubs", linked to balancing zones. The FG on Balancing adopted by ACER on 18 October. Changes foreseen to the Hydrocarbons Law in Spain to complete the transposition of Directive 2009/73/EC.

BASIS FOR THE DEVELOPMENT The following concepts are considered keys for the appropriate development and consolidation of the Spanish hub: Legal and technical requirements aligned and compatible with European trends through the development of a hub which facilitates transactions between trading centers, taking into account the three basic infrastructures: transmission system, LNG plants and underground storages. Services with a real added value for network users, so their input and implication is needed. A single project and integrated which, in addition to the promotion group, will be open to the participation of network users, consumers and other stakeholders, an aspect that will facilitate its acceptance by the market. Users will finance the design, organization and operation. Requires the development and progressive adaptation of the national regulatory framework in order to implement the European regulation. Open, even from the beginning, to the integration of REN to advance the creation of the Iberian gas market.

CORPORATE STRUCTURE INITIAL CORPORATE STRUCTURE Network users 33% CAPITAL SHARE Network users Market operators Others CAPITAL INCREASE 33% CAPITAL SHARE PROMOTION GROUP 33% CAPITAL SHARE

OBJECTIVE Objective This project constitutes a step forward in the creation of a Iberian Hub, considering as a priority the promotion of liquidity in short-term transactions as a as well as its flexibility and transparency, seeking a similar model to other European hubs. The initial services offered and the value provided would include: Services: Standardized contracts. Daily market for imbalance management. Storage services, gas loaning and nominations. Daily monitoring of guarantees and deposits. Added value: To attend a new flexible gas demand in order to facilitate the management of daily imbalances. To provide flexibility to the management of the system, taking into account the role of the natural gas system in supporting intermittent power sources. To put in value assets such as storages or IPs. To provide a transparent reference price in the short term market.

Thank you for your attention! 2nd November 2011