ESCO MODELS IN INDIA Click to begin.

Slides:



Advertisements
Similar presentations
Completing Various Agribusiness Forms. Next Generation Science / Common Core Standards Addressed! CCSS. Math.Content. HSSIC.B.6 Evaluate reports based.
Advertisements

Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
LIABILITIES. Mugan-Akman Liabilities obligations of an entity to make a future payment or to deliver goods or services to the third parties in the.
Business in Action 6e Bovée/Thill Financial Management Chapter 18.
Financing Your Business
Financing Unit 6.
CHAPTER FOUR – SOURCES OF FINANCE. SOURCES OF FINANCE  Internal Sources  Refers to funds that are generated from within the firm itself – from owner’s.
3.1 Sources of Finance Chapter 18 Part 1.
Leasing.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
Section 36.2 Financial Aspects of a Business Plan
Chapter 22: Accounting for Leases
Africa Rail 2009 Workshop 23 June 2009 Different Types of Financing for Mobile Equipment Greg McKenzie Head of Asset Finance, Investment Banking Division,
ASSET-BASED : LEASE, HIRE PURCHASE AND PROJECT FINANCING
Source of Funds Roads Implementation Program –Tied Work –Preferred Supplier –Open Market External Market –LGA –Other Government Departments –Utilities.
Financial Management Chapter 18. Financial Management Chapter 18.
Slide 2.1 Accounting and Reporting on an Accrual Accounting Basis Chapter 2.
Copyright ©2004 Pearson Education, Inc. All rights reserved.8-1 What Is Consumer Borrowing? Obtaining funds from a lender under specific loan provisions.
Leasing A lease is a contractual agreement whereby one party grants the other party the right to use the asset in return for a periodic payment.
Kenneth Langer, Ph.D. Global Environmental Investment Group Washington, D.C Insurance Mechanism To Facilitate Financing of Energy Efficiency Projects.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
FUNCTIONS OF COMMERCIAL BANKING
Cash Purchase vs Loan vs Lease to obtain a capital asset Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
 Discuss the importance of farm credit.  Explain three fundamentals of credit.  List eight rational credit principles needed for effective decision.
Entrepreneurship Business Plan Utilizing Financial Documents.
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Topic 3: Finance and Accounts
Chapter 36 Financing the Business Section 36.1 Preparing Financial Documents Section 36.2 Financial Aspect of a Business Plan Section 36.1 Preparing Financial.
Finance Citi Funded Entrepreneurship Training Program UNIVERSITY OF DUBAI Dr. Zahi Yaseen.
Leases and Off-Balance Sheet Debt 11 CHAPTER. Leases Lease – contractual agreement between a lessor (owner) and a lessee (user or renter) that gives the.
Chapter 3 Learning Objectives
Term Loans Source of long term loans (debt finance)which is repayable in more than one year but less than 10 years. Obtained for financing large expansion,
Financial terminologies
Introduction to Management Accounting
Cash Flow Statement This module provides an introduction to the cash flow statement, one of the essential financial statements. We’ll show how to create.
Financing your business
Chapter 3 Learning Objectives
Unit 4: Agribusiness Management Lesson: AM2
Financing Unit 6.
Accounting and Reporting on an Accrual Accounting Basis
Business Studies SACE Stage One
A finance lease or capital lease is a type of lease
Small Business Management, 18e
Chapter 13: Kay and Edwards
Statements of cash flows
Business Finance Chapter 28.
Financial Accounting:
and short term financial planning
FINANCIAL MANAGEMENT FOR SMALL AND MEDIUM ENTERPRISES
Topic 3 Finance and Accounts
Chapter 36 Financing the Business
1.1 Financial Records BST.
LEASING.
Basic Financial Concepts
Concepts and Objectives of Cost Accounting
Introduction to Financial Statements
Financials Revenue Estimates Revenue Assumptions for Month 1
Financing Your Business
Lease-Based Product – Ijarah
Statement of Cash Flows
Leasing Chapter 21.
Read to Learn Identify the six reasons for creating a financial plan. Explain what a budget is and how it is used.
CHAPTER 8 FINANCIAL PLANNING. CHAPTER 8 FINANCIAL PLANNING.
Chapter 11 Sources of Capital
CHAPTER 8 Personal Finance.
FINANCIAL MANAGEMENT FOR SMALL AND MEDIUM ENTERPRISES
Accounting for Assets Cash Flows.
FINANCIAL MANAGEMENT FOR SMALL AND MEDIUM ENTERPRISES
Presentation transcript:

ESCO MODELS IN INDIA Click to begin

TOPICS What is an ESCO What is an EPC Models for ESCO Performance Contracts Shared Savings vs Guaranteed Savings Types of Financing Schemes Financial Terminologies 2

What is an esco ESCOs develop, implement and provide or arrange financing for upfront EE investments for its clients. Repayments from savings allow clients to compensate ESCO’s ongoing savings monitoring, Measurement & Verification (M&V) costs and assumption of risk through EPC or Third-Party Financing. An Energy Service Company initiates: The identification The study The conception The financing The implementation The follow-up … of the energy savings measures using a contractual engagement between the ESCO and the client (Discom/ User) through an Energy Performance Contract (EPC) Financial Terminologies 3

What is an epc Energy Performance Contracting (EPC) can be defined as ‘a form of ‘creative financing’ for capital improvement which allows the funding of energy efficiency upgrades from cost reductions. Performance guarantees are given by the ESCO in terms of the level of energy service or the level of cost and/or energy savings. The savings are then split between the ESCO and the client who could potentially reinvest this into more improvements. It is a contract Financing of projects from energy savings Permits the realisation of projects for which Rupees may not otherwise be available Mobilises private capital Ensures that savings will be realised in a certain time frame ALSO KNOWN AS: •Third party financing •Savings financing •Sustainable mechanism •Innovative financing Financial Terminologies 4

Models for esco performance contracts (1/2) Shared Savings: Under this model, the ESCO finances the project either through its own funds or by borrowing from a third party. The ESCO takes on the performance risk of the project. The cost savings are divided between the ESCO and customer at a prearranged percentage for an agreed length of time. Guaranteed Savings: In this case, the customer finances the design and installation of the project by borrowing funds from a third party such as a bank or through leasing the equipment. The ESCO has no contractual arrangement with the bank but does assume the project risk and guarantees the energy savings made. If the savings do not reach agreed minimums the ESCO covers the difference; if they are exceeded then the customer agrees to share the savings with the ESCO. Lease Rental Model: The supplier installs the equipment and may maintain it. The lease payments are financed by verified savings and the ownership is generally transferred at the end of a lease period. The client (lessee) makes payments of principal and interest; the frequency of payments depends on the contract. The stream of income from the cost savings covers the lease payment. Financial Terminologies 5

Models for esco performance contracts (2/2) BOOT Model: A BOOT (Build-Own-Operate-Transfer) model may involve an ESCO designing, building, financing, owning and operating the equipment for a defined period of time and then transferring this ownership over to the client. This model resembles a special purpose enterprise created for a particular project. Clients enter into long term supply contracts with the BOOT operator and are charged according to the service delivered. The service charge includes capital and operating cost recovery and project profit. BOOT models are becoming an increasingly popular means of ESCO business in India. BOO Model: A new public-private partnership (PPP) project model for ESCO business named BOO (build, own, operate) has been emerging in which a private organization builds, owns and operates the energy efficiency of a facility. The government doesn't provide direct funding in this model, but it may offer other financial incentives such as tax-exempt status. Financial Terminologies 5

Shared savings vs guaranteed savings Guaranteed Savings Model In a guaranteed savings EPC, the client essentially applies for a loan, finances the project and makes periodic debt service payments to a financial institution. The ESCO bears no direct contractual obligation to repay the lender, only the energy end-user assumes this obligation. The ESCO’s guarantee is not a guarantee of payment to the lender but rather a guarantee of savings performance to the energy end-user that is usually equal to its repayments to the lender. When the actual energy savings are less than the guaranteed level, the ESCO would compensate such shortfall to the client. Thus ESCO takes over the entire performance risk of the Energy Efficiency project. Financial Terminologies 4

Shared savings vs guaranteed savings Shared Savings Model In a shared-savings EPC, the ESCO finances the total upfront capital cost of the project and is totally responsible for repaying the lender. The client pays the ESCO a percentage (or it can be a fixed amount) of its achieved savings from the project, large enough for the ESCO to repay the project investment (both equity and debt), cover M&V costs and any other associated costs. The energy-end user assumes no direct contractual obligation to repay the lender, only the ESCO has this obligation. In a Shared Savings Model, the ESCO assumes partial performance risk and entire credit risk.. Financial Terminologies 4

Financing scheme – standard offer pricing (sop) Financial Terminologies 6

SOP – street lighting project (1/4) Major parameters for street lighting project Input Sheet Working Sheet Project details Capital expenditure Financial parameters Operational detail Generic details Tariff Depreciation Tax rates Revenue Schedule Debt and Equity Schedule Profit and Loss Statement Cash Flow Statement Balance Sheet Financial Feasibility Financial Terminologies 6

Project Specific details SOP – street lighting project (2/4) Input Sheet Project Specific details Project Duration Luminaries detail Operating hours Estimated savings Capital Expenditure Cost of LED Cost of CCMS PDC PMC Operation Details AMC M&V Cost Deration ROE Other Parameters Tariff Inflation Tax Rate Depreciation Financial Terminologies 6

SOP – street lighting project (3/4) Working Sheet Debt Schedule Projection of the debt repayment as per the terms of agreement including, Principle Repayment Interest payment Equity Schedule Projection of the equity to be withdrawn from the project including the ROE expected during the project inception phase Revenue Schedule Estimation of the total revenue on monthly/yearly basis considering following parameters Debt Repayment Equity Schedule AMC & M&V Cost Financial Terminologies 6

Financial Feasibility Output SOP – street lighting project (4/4) Financial Feasibility study SOP calculation Profit and Loss Statement Balance Sheet Cash Flow statement Estimation of project cash flows Financial Parameters calculation NPV Project IRR Equity IRR Financial Feasibility Output Parameter Value Financing Scheme Standard offer program SOP (INR/ kWh) Equity IRR Project IRR Project NPV Financial Terminologies 6

Financing scheme – on bill financing (obf) Financial Terminologies 6

obf – DELP project (1/4) Major parameters for DELP project Input Sheet Working Sheet Project Details Capital Expenditure Financial Parameter Operational Detail Generic Details Tariff Tax rates Revenue Schedule Debt and Equity Schedule Profit and Loss Statement Cash Flow Statement Balance Sheet Financial Feasibility Financial Terminologies 6

Project Specific details Obf - delp project (2/4) Input Sheet Project Specific details On Bill recovery duration Distribution duration Capital Expenditure Cost of Bulb Support service cost PDC PMC Proportion of consumer paying upfront Operation Details AMC M&V Cost Financing inputs Proportion of Debt Cost of Debt Debt tenor Other Parameters Tariff Corporate tax Rate Sales Tax Financial Terminologies 6

Obf – delp project (3/4) Working Sheet Debt Schedule Equity Schedule The Capex requirement of OBF project is to finance the working capital. Debt schedule will detail the repayment of the Debt borrowed to finance the inventory of the project Equity Schedule In OBF projects, EESL has fixed ROE. The annuity payment for fixed ROE on equity infused in the project is estimated in this schedule Annuity Calculation OBF projects works on the recovery of bulb cost from consumers as well as recovery of the cost of debt and ROE. Annuity calculation projects the monthly payment which discoms or ULBs are required to make to EESL for their energy efficient measure. Financial Terminologies 6

Financial Feasibility Output Obf – Delp project (4/4) Financial Feasibility study Annuity calculation Profit and Loss Statement Balance Sheet Cash Flow statement Estimation of project cash flows Financial Parameters calculation NPV Project IRR Equity IRR Financial Feasibility Output Parameter Value Financing Scheme On Bill Financing Recovery (INR/ Month) Equity IRR Project IRR Project NPV Financial Terminologies 6

Financing scheme – shared saving financing Financial Terminologies 6

Shared savings – mudsm project (1/4) Major parameters for MuDSM project Input Sheet Working Sheet Project Details Capital Expenditure Financial Parameter Operational Detail Generic Details Tariff Depreciation Tax rates Revenue Build-up Cost Sheet Depreciation Schedule Debt and Equity Schedule Profit and Loss Statement Cash Flow Statement Balance Sheet Financial Feasibility Financial Terminologies 6

Project Specific details Shared savings – Mudsm project (2/4) Input Sheet Project Specific details Project Duration Details of existing system New system details Estimated savings Capital Expenditure Cost of equipment PDC PMC Installation duration Operation Details AMC M&V Cost Operating hours Energy savings Share of Savings Financing inputs Proportion of Debt Cost of Debt Debt tenor Other Parameters Tariff Inflation Tax Rate Depreciation Financial Terminologies 6

Depreciation Schedule Shared savings – mudsm project (3/4) Calculation Sheet Revenue Buildup In this sheet the revenue is projected based on estimated savings to be generated in the project. Depreciation Schedule Every projects has limited life span and the equipment installed (i.e. assets) are depreciated over the project life. This sheet projects the value of depreciation for the installed equipment Cost Schedule Cost schedule sheet caters to both Capex and Opex cost. It projects the O&M cost to be incurred during the project life as well as the requirement of initial investment based on input sheet Debt Equity Schedule Projection of the debt repayment as per the terms of agreement including following components Principle Repayment Interest payment Financial Terminologies 6

Financial Feasibility Output Shared savings – Mudsm project (4/4) Financial Feasibility study Profit and Loss Statement Balance Sheet Cash Flow statement Estimation of project cash flows Financial Parameters calculation NPV Project IRR Equity IRR Payback period Financial Feasibility Output Parameter Value Financing Scheme Shared savings Sharing proportion Equity IRR Project IRR Project NPV Payback period Financial Terminologies 6

End of Training Module THANK YOU