TC activities.

Slides:



Advertisements
Similar presentations
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Advertisements

An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
Role of Management and Technical Coordination
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
HL-LHC Organization: Now and post HiLumi
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
CMS Centre Project - Green Light Meeting
ADO-PO / TC meeting 1st December 2016
I. Bergevoet - Training preparation
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
East Area Renovation Project Team meeting # 2 – EDMS News
U.S. ATLAS TDAQ FY06 M&O Planning
ADO-PO section meeting. ADO : Atlas Detector Operation
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
TDAQ Phase-II kick-off CERN background information
Project definition and organization milestones & work-plan
WBS 1.03 Readout Systems Scope, Cost and Schedule
Equipment simplified model SMR UR safety
CMS Area Working Group Meeting
Technical Support Activities in EP-ADO-PO
Accelerator and Experiment Interface Session: LS2, LS3
Electrical and electronic systems projects
Upgrade Strategy for the Experimental Vacuum Systems
Francesco Forti University and INFN, Pisa
East Hall under construction
Enterprise Content Management Owners Representative Contract Approval
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Preparations for a Lehman Review
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Update on ATLAS insertable B-layer
Presentation transcript:

TC activities

Outline Overview of TCn organization and activities More detailed look at Upgrade Updated organization Overview of activities

Few words about me… New to TC My recent history 2009-2010: ATLAS Run Coordinator mid 2011-2015: LHC Program Coordinator Only part time involvement in ATLAS in the TDAQ upgrade (FELIX project) Joined TC in January 2016 … still learning!

TCn organization Technical Coordinator Ludo Deputy Planning Engineering Procurement Michel Deputy OPM and Run Coordination Upgrades Machine interface Benedetto LEXGLIMOS Safety Sigi/Laetitia Constant interactions with Upgrade management Section Leader/ PO Raphael Systems

Draft of TCn WBS Operation Run Coordination DCS General Operation Technical Coordination WBS 1.1 Operation 1.1.1 Run Coordination 1.1.2 DCS 1.1.3 General Operation 1.1.4 Electrical Power 1.1.5 General CV 1.1.6 Detector CV 1.2 Maintenance 1.2.1 Opening and closing 1.2.2 Infrastructure Maintenance 1.2.3 Day to day support 1.3 Safety 1.3.1 SLIMOS organization 1.3.2 Safety Documentation 1.3.3 Safety systems 1.3.4 Day to day safety 1.5 Phase 1 Upgrade 1.5.x Level 3 to be defined 1.6 Phase 2 Upgrade 1.6.x 1.7 Financial 1.7.1 Planning for material needs 1.7.2 Planning for manpower needs 1.8 TC Management 1.8.1 Strategic planning 1.8.2 Tactical planning

TCn responsibilities Maintenance Operation Safety Financial and TCn management Upgrade

TCn responsibilities Maintenance Operation Safety Financial and TCn management Upgrade In the rest of this talk I will focus more on Upgrade The other responsibilities are largely covered by the following talks Covered in following talks

Long term LHC schedule

New organization for Upgrade TC Upgrade Management Management of current activities USC Design Office Safety …. Project Office Draft for discussion Detailed organization to be presented by ATLAS Week

TCn upgrade activities (1) Design office support to upgrade projects Phase 1 New Small Wheel: nJD; movement, transport and lifting systems; envelope definition BMG: Layout and envelope; support; tooling and installation BIS7/8: Layout and envelope; support; tooling and installation Support for AFP Phase 2 ITK: Installation procedure and tooling BI: Installation procedure and toolings SFCAL: Feasibility study and risk analysis; engineering Covered by Raphael in details later

TCn upgrade activities (2) Experimental layout configuration and integration (beyond design office activities) General envelope definition Including CAD DB management CAD integration Cabling and pipes (Sergey+new staff funded by PH) De-commissioning (need manpower!) Joint Working Groups with detector experts will need to be setup and managed by the Upgrade PO Reviews Follow-up work of Review Office jointly with USC Participate ex-officio to all reviews

TCn upgrade activities (3) Detector systems interfaces and facilities Overview of detector FE-TDAQ interface (Benedetto) Follow-up discussions on definition of global trigger strategy and related readout architecture Detector DCS interface (Stefan) Integration of new detectors DSS (Sergey and Carlos) Alarm matrix definition Common ethernet network infrastructure New Control Network (missing manpower!) Services: cooling (including detector cooling), gas systems, power Sharing responsibility with projects TC responsibility on general management Claudio PL of baby demo plant

TCn upgrade activities (4) Electronics coordination Modular electronics standards Allocation of rack and resources in USA15 (OPM?) Specific studies about ATCA racks (Claudio) Performance studies for vertical vs horizontal cooling Establish max cooling power per rack Noise issue (related to USA15 safety considerations) Computing power needs for Trigger and DAQ (Benedetto, Ludo) TC responsible for supporting possible requests for increased computing power New building / space allocation and services for container solutions Upgrades in power and cooling capabilities in existing facilities (e.g. SDX1) Central DCS/DSS (Stefan, Sergey, Carlos)

TCn upgrade activities (6) Machine interactions (Benedetto) Representation in HL-LHC Coordination H/W interface between machine and ATLAS (WP8, Michel) New TAXS, beam pipe… Simulation of machine failure scenarios Asynchronous beam bump Definition of beam conditions for physics Luminous region, pileup... Jointly with UC Implications for detector definition: ITK layout, timing detector... Machining slots in JFC1, JFC3, octagonal shielding Modification of JTT, JFC2 Services routing New support for VAX + VAX VJ and VT supports

TCn upgrade activities (5) Radiation studies New Radiation Simulation WG created under TC coordination https://indico.cern.ch/category/7766/ Mandate for: Detector radiation background studies ALARA/Activation studies Mostly manned by TC people: Giuseppe, Lior, Natasha General project management Deputy chair of USC (Benedetto) Definition of PM tools Maintenance and monitoring of the global Upgrade project plan Maintaining synchronicity with independent project plans for detectors Ideally same tool used with automatic include mechanism Derivation of global critical path Monitoring of global conflicts of schedule or resources Staff position is being opened for project manager