Snap Button Control Procedures

Slides:



Advertisements
Similar presentations
PRIMARY GOAL TO ENHANCE CUSTOMER SATISFACTION BY
Advertisements

1 Developing Assignments using the assessment grid.
Meet Manager Training Updated April Step 1: Set up your meet Download the meet template Restore the template Purge Old Data Setup Meet Information,
General Safety Overview and Information
eSchool An integrated solution specifically designed for schools to manage every aspect of the school administration Shares login specific record across.
Should We Be Concerned About At The Airport? YES! Next.
First Paper Feed Area Table Height Adjustment: There are two ways of adjusting the upper limit sensor. 1. You can put two sheets of paper on the paper.
© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
PPAP Requirements Training
1 Children’s Safety. 2 Safety Requirements for Baby’s and Children’s Wear ** Blue Island (BD) Ltd requirements and restrictions and suppliers responsibility.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Living with the lab Prototyping with Sheet Metal.
We have a well qualified CCM team with talented professionals to communicate with our clients. Our Merchandisers act as a ‘shadow of buyer’ and also links.
Select TRAVL as the Business Unit. Click on OK.. Go to Header Panel. Click on ‘Copy From Template’ (icon lowest on the screen).
Lesson 4 Drilling Cost & Drilling Rate
Weld Types – Butt Joint with Backing
Teen Living Notes Competency: Basic fashion construction procedures to produce personal clothing & home accessories.
App. 1 Obj How you hold things together Fasteners: Zippers, buttons, snaps, hooks and eyes and Velcro™
GARMENT FINISHING PRODUCTION TECHNIQUE PRESENTED BY: PRAGATI,RUCHITA,SHELJA AND POOJA.
Trindel Insurance Fund
Management Review Maurice Fitz-Gerald President-Sales Manager Terri Gaquerel General Manager Adam Hunt Financial Officer Danny Pike Engineering.
Smart solutions for comfort and safety UL/CSA approval of small motors.
Very Important Procedures. Written by Mamie Hixon, Betty Burleson, and Rustian Phelps, PPt by Rustian Phelps, May 2011 V. I. P.V. I. P.V. I. P.V. I. P.
Taste is a Matter of Choice; but Quality is a Matter of Fact Good Quality Apparel Item What are attributes of a good quality apparel item?
Chapter 24 Stock Handling and Inventory Control 1 Marketing Essentials Chapter 24 Stock Handling and Inventory Control Section 24.1 The Stock Handling.
Cost Entry by MG for Directions Studio Cypress Creek System.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Tools of the Trade. Product Development Wheel Flow of Communication Scenario : Button fails testing. Product development is advised by their overseas.
Welcome to Engineering Drawing and Design Sign YES/NO Form Syllabus Information Sheet Who am I and why am I here?
Market Direct Vendor Mini Manual Market Direct Vendor Mini Manual Proof Of Care Requirements Market Direct Testing Manual V2 1.
How to Sew a Button Step by Step Instructions. Thread the Needle For buttons, you should double the thread to make the job quicker. Pull it through the.
Lab Team Jobs Why have specific jobs? Can one person do all the jobs well?
PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011
7 th Grade Art Week 1. Day 1 Objectives: Syllabus Class Expectations Procedures Paper ◦Needs to be signed and returned by both you and a parent by this.
USED IN TROUSERS MAKING
Introduction to Engineering Camera Lab #4 – 3 Task #2 Agenda Review Task #2 procedure Conduct Task #2 Work on lab report.
Husqvarna K 960 Rescue Saw Engine 2 Cycle Horsepower 6.1 Max RPM 9300
Hand Sewing Buttons and Things.
4. SETTING UP RESOURCES SESSION # 4. OBJECTIVES Set up basic resource information for the people who work on projects. Adjust the maximum capacity of.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
Lock-out tag-out Procedure OSHA and site requirements.
Do Now Heading: Electrical Safety Pick up 3 worksheets from the front table Open up your journals.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Hand Sewing Stuffed Animals. Pin vs. Needle Pins have Heads Needles have an Eye.
VIEW SERIES with Sliding Door
Warm Vessel Leveling Islands (Piers)
EVM Tracking System (ETS Processes)
Demonstrate how to thread a needle.
Button Control Procedures
Sewing Basics: How to Sew on a Button
Merchandiser (Garment Team) ERP Training Day 3
Prototyping with Sheet Metal
Weld Types – Butt Joint with Backing
Advantages and Disadvantages of Drive-thru car wash
Simple Guide to Repair the Parking Brake of your Car
Simple Way to Install Auto Lock Door in Car
WELCOME TO QA WEEKLY TRAINING PROGRAM. Training Topic_ 1. Quality Maintain Procedure For Higher Quality Order In Proper Way 2. Special CYZ Order Check.
Step by Step Instructions
IVG Driver Training Vehicle Diagnostics.
BALTIMORE COUNTY FIRE-RESCUE ACADEMY Stryker Equipment.
CL4NX +Cutter (KITTING MANUAL)
4. Setting up Resources Session # 4.
Family care home health agency, llc
Welcome to GWPL Attendance & Payroll Management Software
Define: Learn the Specs
Sewing Basics: How to Sew on a Button
Compressor Operating Instructions
Automotive Engines Theory and Servicing
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

Snap Button Control Procedures All Metallic buttons must meet the following minimum performance requirements: Metallic button procedure must be strictly follow as a daily routine basis .   Two Hole Two or Four Hole Ligne Size <14 14-21 ≥22 Strength 20.2 LBS / 10 SEC

Snap quality Check Factory has a assigned Trims inspection team , they doing the check to ensure the buttons quality as 10% of Every buyer , style, lot and consignment wise and make sure in house button match with approval & strictly check below points ; Button ligne match with requirements Button color & Button scratch Button thickness Button Broken Button need to pass thru double head needle detector machine to make sure button are metal free.

Machine adjustment Before attach button Factory has to adjusted by snap machine , not by manual machine. Vendor must clean button attachment machines on a daily basis. Button supplier’s service Engineer must be come to factory to adjust the machine pressure , pinch setting as data sheet to avoid any misalignment of button and pressure uneven. Approved Button supplier – Scovil , Priyam and Moritoba. PSO must be check machine adjustment and garments before start bulk production.

Bulk Production Before start production operator should be make mock-up by similar layer (button attaching position) and button attach into mock-up and Safety officer do pull test when button pull test are meet 20.2 LBS / 10 sec then he will allows to start bulk production. During button attach must be follow marking to avoid uneven foundation and if any electric fault or machine off for any reason then again restart the machine and ist button must be attach at mock-up then proceed for bulk production (if everything ok). Every two hours PSO has to check physically and keep records using below format ;

Button Pull Test Factory assigned Product safety officer and team are responsible to do button pull test . Carter’s button pull test requirements 20.2 LBS / 10 SEC Every two hours PSO doing button pull test and keep records accordingly . Must be follow head end control.

Quality Check after button attach Factory assigned two QA to do check 100% button after attaching and strictly follow below points ; Button attach at uneven foundation Button operability test Button pull out Button scratch for over pressure Leg frong out Button ligner match with approval QA keep records accordingly.