Super-B Accelerator Status

Slides:



Advertisements
Similar presentations
Accelerator M. Biagini, LNF-INFN on behalf of the SuperB & DA  NE Teams 3 rd International Workshop on "B Factories and New Measurements" Atami, Jan.
Advertisements

SuperB and SuperKEKB * Y. Ohnishi KEK July 3, 2008 * SuperKEKB is the KEKB upgrade in the framework of the KEK roadmap 1.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
July 24, 2008Super-B Mini-MAC MeetingPage 1 Super-B Overview John Seeman Accelerator Systems Division SLAC.
Super-B Accelerator R&D J. Seeman With contributions from the Super-B Staff September 17, 2009.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SuperB Accelerator & ILC SuperB Accelerator & ILC M. E. Biagini, LNF-INFN for the SuperB Team ILC GDE visit, LNF, Jan. 22 th 2008 D. Alesini, M. E. Biagini,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Summary of Accelerator parallel sessions M.Biagini on behalf of 23 speakers SuperB09, LAL, Feb. 16 th 2009.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
SuperB Accelerator Overview & Status M. E. Biagini, LNF-INFN for the SuperB Accelerator Team SuperB Meeting Elba, May 31 th, 2008.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Accelerators Activity SuperB collaboration meeting. Pisa 21/09/2012
Super-B Vibration Tolerances
SuperB Accelerator Status
SuperB: An Overview U. Wienands, SLAC U. Wienands, SLAC
WP11 – ANAC Report on First Semester
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Status of the Super B Project and Beam Polarization Issues
The SuperB Accelerator Lattice M. E
Report on ILC and SuperB work at LNF
The SuperB project M. Biagini on behalf of SuperB Accelerator Team J
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
The PEP-II Interaction e+e- Factories Workshop
SuperB Accelerator Status
SuperB project. Injection scheme design status
BINP Tau-Charm Project
Accelerator Overview M
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Super-B Overview John Seeman Accelerator Systems Division
Accelerator Systems Division
Electron Source Configuration
SuperB ARC Lattice Studies
SuperB Accelerator Overview and Status
The project of t-charm factory with crab waist in Novosibirsk
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
J. Seeman Assistant Director for PPA/LCLS
Summary of Accelerator Sessions
AC Power for a Super-B Factory
Summary of Washington DOE Review
IR Summary M. Sullivan For
Super-B Accelerator Overview
SuperB IRC Meeting Frascati, Nov. 13th 2007
BINP Tau-Charm Project Update E.Levichev, BINP, Novosibirsk
Polarization at the Super-B Factory
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
J. Seeman Perugia Super-B Meeting June 2009
Proposal for a CESR Damping Ring Test Facility
SuperB Accelerator Overview
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Proposal for the DAFNE Variable Energy Design Study
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Crab Crossing Named #1 common technical risk (p. 6 of the report)
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

Super-B Accelerator Status J. Seeman For the Super-B Accelerator Consortium June 16-19, 2009 Perugia Meeting

Outline Overview Project high level organization Accelerator Consortium Mini-MAC meeting April 2009 Super-B parameter list TDR planning June 16-19, 2009 Perugia Meeting

How Super-B accelerator fits in the Super-B Project June 16-19, 2009 Perugia Meeting

Super-B Accelerator Technical Board Accelerator collaboration: J. Seeman Scientific-Technical: P. Raimondi S. Tomassini U. Wienands Regional coordinators: M. Biagini Italy M. Sullivan US G. Bassi UK E. Levichev Russia A. Variola France June 16-19, 2009 Perugia Meeting

Super-B Accelerator CDR Contributors (2008) M. E. Biagini, R. Boni, M. Boscolo, T. Demma, A. Drago, S. Guiducci, M. Preger, P. Raimondi, G. Sensolini, S. Tomassini, C. Vaccarezza, M. Zobov (INFN/LNF, Italy) K. Bertsche, M. Donald, A. Fisher, S. Heifets, A. Novokhatski, M. Pivi, J. Seeman, M. Sullivan, U. Wienands, W. Wittmer, G. Yocky (SLAC, US) I. Koop, S. Nikitin, E. Levichev, P. Piminov, D. Shatilov (BINP, Russia) G. Bassi, A. Wolski (Cockroft Institute, UK) M. Venturini (LBNL, US) S. Bettoni (CERN, Switzerland) A. Variola (LAL/Orsay, France) E. Paoloni, G. Marchiori (Pisa University, Italy) K. Ohmi (KEK, Japan) June 16-19, 2009 Perugia Meeting

TDR Super-B Accelerator Contributors (Spring 2009) D. Alesini, M. E. Biagini, R. Boni, M. Boscolo, A. Clozza, T. Demma, A. Drago, M. Esposito, A. Gallo, S. Guiducci, V. Lollo, G. Mazzitelli, C. Milardi, L. Pellegrino, M. Preger, P. Raimondi, R. Ricci, C. Sanelli, G. Sensolini, M. Serio, F. Sgamma, A. Stecchi, A. Stella, S. Tomassini, C. Vaccarezza, M. Zobov (INFN/LNF, Italy) K. Bertsche, A. Brachmann, Y. Cai, A. Chao, A. DeLira, M. Donald, A. Fisher, D. Kharakh, A. Krasnykh, N. Li, D. MacFarlane, Y. Nosochkov, A. Novokhatski, M. Pivi, J. Seeman, M. Sullivan, U. Wienands, J. Weisend, W. Wittmer, G. Yocky (SLAC, US) A. Bogomiagkov, S.Karnaev, I. Koop, E. Levichev, S. Nikitin, I. Nikolaev, I. Okunev, P. Piminov, S. Siniatkin, D. Shatilov, V. Smaluk, P. Vobly (BINP, Russia) G. Bassi, A. Wolski (Cockroft Institute, UK) S. Bettoni (CERN, Switzerland) M. Baylac, J. Bonis, R. Chehab, J. DeConto, Gomez, A. Jaremie, G. Lemeur, B. Mercier, F. Poirier, C. Prevost, C. Rimbault, Tourres, F. Touze, A. Variola (CNRS, France) A. Chance, O. Napoly (CEA Saclay, France) F. Bosi, E. Paoloni (Pisa University, Italy) At present approximate totals: 10 FTEs from LNF Frascati 4.5 FTEs from SLAC 3 FTEs from BINP Novosibirsk 2.5 FTEs from France 0.5 FTEs from Pisa Not complete! June 16-19, 2009 Perugia Meeting

Mini-MAC Members Full Attendance at this Meeting April 23-24, 2009. Klaus Balewski (DESY) John Corlett (LBNL) Jonathan Dorfan (SLAC, Chair) Stuart Henderson (ORNL) Tom Himel (SLAC) Claudio Pellegrini (UCLA) Daniel Schulte (CERN) Ferdi Willeke (BNL) Andy Wolski (Liverpool, by phone) Frank Zimmermann (CERN) June 16-19, 2009 Perugia Meeting

Mini-MAC PARAMETER REQUIREMENTS FROM PHYSICS Comment Luminosity (top-up mode) 1036 cm-2s-1 @ U(4S) Integrated luminosity 75 ab-1 Based on a “New Snowmass Year” of 1.5 x 107 seconds (PEP-II experience-based) CM energy range From just below charm ≈t threshold to U (5S) For a better study of CP violation in Charm and for BS measurements. Minimum boost bg = 0.28 (4x7 GeV) 1 cm beampipe radius. First measurement at 1.5 cm e- Polarization 60-85% Enables t CP and T violation studies, measurement of t g-2 and improves sensitivity to lepton flavor-violating decays. Detailed simulation, needed to ascertain a more precise requirement, are in progress. LNF April 24,2009 June 16-19, 2009 Perugia Meeting Marcello A. Giorgi 8 8

Highlights from the MAC Committee April 23-24, 2009 Committee: Klaus Balewski (DESY), John Corlett (LBNL), Jonathan Dorfan (SLAC, Chair), Stuart Henderson (ORNL), Tom Himel (SLAC), Claudio Pellegrini (UCLA) , Daniel Schulte (CERN), Ferdi Willeke (BNL), Andy Wolski (Liverpool), Frank Zimmermann (CERN) “The MAC now feels secure in enthusiastically encouraging the SuperB design team to proceed to the TDR phase, with confidence that the design parameters are achievable.” Recent strong progress: Crab waist tests at DAFNE Beam-beam measurements (DAFNE) and simulations IR design Lattice Polarization spin rotators “Nonetheless, much detailed work remains to bring the design to the level where (a) ground-breaking, (b) final engineering of accelerator components can commence.” Further needed work areas: Emittance tuning and evaluate tolerances Dynamic aperture calculations IR and arc vacuum systems Injection system Vibration studies Polarization lattice June 16-19, 2009 Perugia Meeting

TDR Topic List Vacuum system Arcs pipe Straights pipe IR pipe e-cloud remediation electrodes bellows impedance budget simulations pumping system Diagnostics Beam position monitors Luminosity monitor Current monitors Synchrotron light monitor R&D on diagnostics for low emittance Feedbacks Transverse Longitudinal Orbit Luminosity Electronics & software Control system Architecture Design Peripherals Injection System Polarized gun damping rings spin manipulators linac positron converter beam transfer systems Collider design Two rings lattice Polarization insertion IR design beam stay clear ultra-low emittance tuning detector solenoid compensation coupling correction orbit correction stability beam-beam simulations beam dynamics and instabilities single beam effects operation issues injection scheme RF System RF specifications RF feedbacks Low level RF Synchronization and timing Site Civil construction Infrastructures & buildings Power plants Fluids plants Radiation safety Magnets Design of missing magnets Refurbishing existing magnets Field measurements QD0 construction Power supplies Injection kickers Mechanical layout and alignment Injector supports June 16-19, 2009 Perugia Meeting

Tor Vergata Site (February) CDR ~2008 June 16-19, 2009 Perugia Meeting

Potential LNF Super-B location (May) (Tomassini, Raimondi, and Sanelli, May 09) June 16-19, 2009 Perugia Meeting

Injector RF Layout (Boni, Guiducci, Seeman) A B C D ACCELERATING FIELD e- DR > 4 GeV e- A B C D GUN SHB L - 0.8 GeV 5.7 GeV 0.1GeV 0.8 GeV > 7 GeV e+ PS e+ DR ACCELERATING FIELD MEDIUM GRADIENT HIGH GRADIENT 23 MV/m 26 MV/m 60 MW klystron 50 MW klystron 55 MW 45 MW X X SLED SLED ≈ 210 MeV ≈ 156 MeV

Luminosity Equation for a Circular e+e- Collider xy is the beam-beam parameter (~0.09) Ib is the bunch current (~1 mA) n is the number of bunches (~1500) by* is the IP lattice optics function (vertical beta) (<0.2 mm) E is the beam energy (4 and 7 GeV) Luminosity (1036 cm-2 s-1) June 16-19, 2009 Perugia Meeting

Super-B Parameter Options June 16-19, 2009 Perugia Meeting

Comparison of design and achieved beam emittances (*achieved) E (GeV) C (m) g ex (nm) gex (mm) ey (pm) gey(nm) Spring-8 8 1430 15656 6 94 5 78 ILC-DR 6400 9785 1 10 2 20 Diamond* 3 561 5871 2.7 16 29 ATF* 1.28 138 2524 2.5 4 SLS* 2.4 288 4700 28 3.2 15 SuperB LER 1800 7828 2.8 22 7 55 SuperB HER 13699 1.6 Emittance tuning techniques and algorithms have been tested in simulations and experiments on the ATF and on the other electron storage rings to achieve such small emittances (ex. CesrTA as an ILC-DR test facility has a well established one). (Biagini) June 16-19, 2009 Perugia Meeting

Simulations for SuperB Strong-Strong Weak-Strong Quasi-Strong-Strong (June 2008 parameters) K. Ohmi June 16-19, 2009 Perugia Meeting

Luminosity and Dynamic Aperture Scans Piminov, Shatilov, Zobov Qx Qy Tune point optimization is done together with bb simulations and luminosity and lifetime optimization June 16-19, 2009 Perugia Meeting

Injector and Linac Will the SLC polarized gun be adequate? Can a short pulse polarized laser on the cathode make a 3 mm bunch? Can the beam emittance from the gun be smaller? Parameters of the spin rotators? RF and structure design? (Boni) Quadrupole lattice for the linac? Quadrupole lattice for the transport lines? Geometry of the transport lines? Diagnostics needed? Tolerances on magnets and RF? June 16-19, 2009 Perugia Meeting

Damping Rings Lattice (~54 m) (Guiducci) DR energy: 1 GeV or 800 MeV? RF parameters? Injection septa and kickers? Vacuum system needed? Tolerances of all magnets, RF, alignment? June 16-19, 2009 Perugia Meeting

Ring Injection Injection kicker design? Septa design? Septa fringe fields on stored beam? June 16-19, 2009 Perugia Meeting

Arc Lattice Raimondi, Biagini, Wittmer, Wienands Arc cell: flexible solution is based on decreasing the natural emittance by increasing mx/cell, and simultaneously adding weak dipoles in the cell drift spaces to decrease synchrotron radiation All cells have: mx=0.75, my=0.25  about 30% fewer sextupoles Better DA since all sextupoles are at –I in both planes (although x and y sextupoles are nested) Distances between magnets compatible with PEP-II hardware All quads-bends-sextupoles in PEP-II range Arcs & FF June 16-19, 2009 Perugia Meeting

Possible layout with spin rotators near IR (Wienands, Wittmer) June 16-19, 2009 Perugia Meeting

Polarization versus Energy of HER (Wienands) June 16-19, 2009 Perugia Meeting

Dipoles Quads Sexts Layout: PEP-II magnets reuse Lmag (m) 0.45 5.4 PEP HER - 194 PEP LER SBF HER 130 SBF LER 224 18 SBF Total 148 Needed 30 Dipoles Available Needed Quads Lmag (m) 0.56 0.73 0.43 0.7 0.4 PEP HER 202 82 - PEP LER 353 SBF HER 165 108 2 SBF LER 88 SBF Total 253 216 4 Needed 51* 134 Lmag (m) 0.25 0.5 PEP HER/LER 188 - SBF Total 372 4 Needed 184 Sexts All PEP-II magnets can be used, dimensions and fields are in range RF requirements are met by the present PEP-II RF system June 16-19, 2009 Perugia Meeting Biagini

PEP-II Magnets and RF Components June 16-19, 2009 Perugia Meeting

(A. Drago) June 16-19, 2009 Perugia Meeting

HER/LER Lattice design? (Raimondi, Wienands, Wittmer) General magnet parameters? (Biagini) New magnet designs? Tolerances on fields and power supplies? Dynamic aperture calculations (Yocky, Donald, BINP) Vacuum system design? Pumping and vacuum requirements? Diagnostics (BPMs, SLMs, BLM, polarimeter)? HOM reduction? (Novokhatski, ?) Skew quadrupoles needed? Magnet movers? Vibration requirements and damping? Supports? Water cooling requirements? Beam loss monitors Shipping and refurbishing PEP-II magnets? (Kharakh, Seeman, Sullivan) June 16-19, 2009 Perugia Meeting

RF Plan: Use PEP-II RF system and cavities (Novokhatski, Bertsche) June 16-19, 2009 Perugia Meeting

Super-B RF: power required S. Novokhatski Jan. 2009 Super-B RF: power required 30 June 16-19, 2009 Perugia Meeting 01/26/09

RF System PEP-II system reuse? Needed RF-longitudinal parameters? (Novokhatski) Refurbishment needed? Need more cavities? Klystron inventory? Radiation shielding? Supports? HV power supply rebuilds for 50 Hz? June 16-19, 2009 Perugia Meeting

SuperB Interaction Region Layout View (Jan 2009) Sullivan M. Sullivan June 16-19, 2009 Perugia Meeting

SC Quadrupoles at the IP (E. Paoloni, S. Bettoni) June 16-19, 2009 Perugia Meeting

Locations of Fast Dipoles for Luminosity Feedback K. Bertsche June 16-19, 2009 Perugia Meeting

IP (+/- 3 m) Beam separation and beam stay clear? (Sullivan) Be chamber at IP? Magic vacuum flange? Expansion bellow in IP? IR quadrupoles? (Paoloni, Bettoni) Solenoid compensation (antisolenoids, skew quads, skew sextupoles)? Steering to bring beams into collisions? Fast collision feedback? (Bertsche, Sullivan) IR supports? Vibration sensitivity and active damping? Vacuum pumping for sub-nTor pressures? Luminosity monitor? Assembly fixtures and procedure? Power supply specifications? June 16-19, 2009 Perugia Meeting

W. Wittmer June 16-19, 2009 Perugia Meeting

Final Focus (+/- 200m) Chromatic corrections? (Wittmer, Wienands, Raimondi) Collimation? Separation geometry? (Raimondi, Nosochkov) Vacuum chambers and pumping? Tolerances on vibration and power supplies? New magnets needed? Special diagnostics? June 16-19, 2009 Perugia Meeting

Safety Systems Fire suppression? Safety egress (40 m?, 300m?, 5000 m?) Smoke alarms? Earthquake? Radiation monitoring? Personnel Protection zones? … June 16-19, 2009 Perugia Meeting

Accelerator Technical Board Charge: Make technical and management suggestions to the Super-B accelerator consortium. Review technical accelerator parameters of the Super-B Accelerator. Suggest parameters that should be included in the Global Accelerator Parameter Document. Suggest a person to be responsible for each accelerator parameter in the spreadsheet. Present members: M. Biagini, E. Levichev, P. Raimondi, J. Seeman, M. Sullivan, S. Tomassini, A. Variola, U. Wienands, G. Bassi June 16-19, 2009 Perugia Meeting

Initial Accelerator Tech. Board Parameters June 16-19, 2009 Perugia Meeting

Super-B Conclusions The Super-B parameters are being optimized around 1 x 1036. The team is addressing the Accelerator Mini-MAC suggestions from the April meeting. IR present design has a solid basis; now start adding engineering features. IR polarization (spin) rotators have now been added to the HER lattice. Polarization has changed the geometrical layout. Beam-beam and lattice dynamic aperture calculations are continuing. The new lattice layouts show improvement. Beam loading and RF parameters have taken the next solid step. Looks acceptable. Organizing and planning for the Technical Design Report aiming at Fall 2010. June 16-19, 2009 Perugia Meeting