Progress and Status of X Band Stand Alone Power Source (SAPS) at CERN

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
CERN klystron test stand – CLIC Workshop, Oct page 1 F. Peauger High-Power RF Test Areas: Design & Planning Progress of the CERN Klystron Test Area.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
30 GHz waveguide line modification towards 12 GHz.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
G.McMonagle, 8 th July 2011 CLIC Project Meeting X Band Stand Alone Power Source at CERN Stand Alone Power Source (SAPS) The story so far
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
CLIC Workshop, February, CERN. I. Syratchev Roadmap for CLIC high-efficiency klystron development I. Syratchev, CERN.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Update on X Band Klystron Modulator Installation.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Commercial high-power X-band experience: klystron/modulators, and waveguide vacuum flanges CLIC Workshop January 2016 G. McMonagle (on behalf of Xbox team)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
The status of RF components G. Riddone, M. Filippova RF development meeting on
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
Prospects for developing new tubes
High efficiency work and MBK development for accelerators
CSP 25th November 2010 Technical agreement number 3: overview
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
CLEX* Status and Plans CTF3 complex CLEX
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
A frequency choice for the SPL machine: Impact on hardware
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The situation is far better than I had thought.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Testing Infrastructure, Program and Milestones
Experience with X band klystrons and solid state modulators at CERN
Klystron efficiency.
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
High Efficiency X-band Klystron Design Study
Recent high-gradient testing results from the CLIC XBoxes
CEPC RF Power Sources System
Advanced Research Electron Accelerator Laboratory
CLIC Feasibility Demonstration at CTF3
Operational Experience with LCLS RF systems
Presentation transcript:

Progress and Status of X Band Stand Alone Power Source (SAPS) at CERN History 2007 to now What is present situation Future requirements for SAPS at CERN

Optimistic Planning Presented CLIC 07 workshop CERN decided that to complement the testing being done at KEK and SLAC a high power X band power source is necessary for testing structures on site at 12GHz Market survey showed that there was no source available from industry Initial contact with SLAC klystron department for a collaboration to develop a 12Ghz klystron based on the existing 11.4 GHz tube was positive Wheels in motion for a collaboration between CERN and SLAC with financial contributions from CERN. Optimistic Planning Presented

At the time there was some opinion that this was too pessimistic 2009 2010 In reality due to administrative problems the final contract agreement was delayed one year 2007 2008 2009 11 12 1 2 3 4 5 6 7 8 9 10 Klystron feasibility and costing enquiry   Finance Committee Approval (for klystron collaboration and project approval) Order Klystron Klystron Manufacture and Delivery Modulator Price Enquiry Modulator Manufacture and Delivery Preparation of Modulator area Procurement and preparation of auxiliaries Preparation of test area Procurement and manufacture of test area equipment Low level RF START TEST STAND COMISSIONING (single klystron)

During this time PSI and Sincretrone Trieste joined in the collaboration. The MoU was signed under a “best efforts” agreement In total 5 klystrons were ordered Only one for CERN !

SAPS Installation and Requirements Klystron 50 MW 1500 ns 50 Hz test slot 200 MW, 0 ... 100 ns or 100 MW, 0 ... 350 ns phase modulation hybrid Modulator pulse compression CTF2 Gallery

ACC Concrete block Stand alone Test Stand in CTFII Circular WG F-Cup+Isolator Stand alone Test Stand in CTFII Concrete block girder ACC pump Pump Tee load coupler Circular WG Mode converter WG valve 0.5 m Courtesy: S. Doebert

XL5 X Band Klystron spec Parameters Specifications units RF Frequency 11.9942 GHz Peak RF power 50 MW RF gain dB Efficiency % RF pulse length 1.5 µs Pulse repetition rate 50 (100) Hz Duty cycle Klystron voltage 410-470 kV Klystron current A Inverse klystron voltage 100 max Heater voltage 20 max V Heater current 30 max Heater start up surge current ?max Preheating period 60 min

Modulator Exceptional financial contribution to CERN from France modulator and some RF components came via CEA Saclay collaboration Modulator specification based on SLAC klystron parameters, and the limited space available in the klystron gallery Call for tender launched Four offers 2 were of similar priced 1 line type modulator and 1 solid state Contract was awarded to Scandinova, mainly based on footprint of modulator, delivery schedule and our interest in using new technology

Modulator delivered to CERN (only tested in dummy load waiting for klystron) In hindsight choosing a new technology for a project with a tight time schedule was probably not the correct one

XL5 performance at SLAC (Feb 2010) Despite admin delays SLAC had klystron ready ahead of schedule Voltage, Current and rf waveforms at 57MW 1.25us Best efforts agreement meant CERN had to pay for repair Klystron eventually delivered to CERN end of October 2010 Unfortunately during preparation for shipment the klystron was damaged

Klystron Delivered to CERN Although there was some cosmetic damage the tube vacuum was ok and there didn't seem to be anything visually wrong with the tube

Klystron installation in modulator with help from our SLAC collaborators Many teething problems with modulator calibration, interlocking etc. But we got first pulse on klystron before end of the year, stopped to do some modifications to modulator

First signs of trouble When klystron was reinstalled we turned Ion Pump supplies on and they indicated that the klystron was up to air ... Disaster as klystron is sealed unit with pinch off Contacted SLAC and we decided a leak test may be possible, SLAC sent engineer to participate While waiting for SLAC engineer, we removed the tube and contacted our vacuum group to see what was the best way to proceed

Leak test showed ceramic feed through on ion pump was leaking New ion pump and valve installed tube pumped down vacuum ok

Tube was baked out at 200 degrees for 4 days Activated cathode during the bake out period Success tube ready for reinstallation

Reinstallation of klystron in modulator Several issues with believing current and voltage calibration of the modulator But tube was pulsing !!! If we believe the figures from the voltage and current waveforms the perveance on the tube is lower than what was seen at SLAC Temperature probes were installed at input and output of collector water cooling and also a precision flow meter in order to do a calorimetric check. Unfortunately the calorimetric measurement confirmed the low perveance and allowed us to believe that the voltage and current measurements were correct

Some measurements Two possible causes for this 1. Cathode pollution, not getting uniform electron beam from cathode 2. Gun misalignment Varied filament heater current with constant klystron Voltage. From results looks as though cathode performs as expected Probably rules out cathode pollution

Ruling out cathode pollution and with 10% body interception (nominal <1%) This leaves gun misalignment investigation Tube removed again

Conclusive that there is a misalignment although we don't really know how it happened what do we do ? First option We send the tube back to SLAC for repair As its a best effort collaboration will cost us 200k$ and at least 6 months delay Second option Long shot, try and realign gun at CERN Risky but if it doesn't work the tube will have to be sent back anyway Extra 4 week delay but worth the risk?

After consultation with SLAC we prepared a clamping system to squeeze the gun on the “low side” The process seemed to have worked and the misalignment was removed and tube vacuum still ok Tube reinstalled in modulator

NOW SOME GOOD NEWS While repairing klystron some additional measurement systems were implemented in the modulator to help with our calibration doubts Started pulsing klystron at short pulse width on 30th August All seems fine running at around 370kV 50Hz By 2nd September we got to near nominal pulse width at 50 Hz and at approximately 370kV

Many measurements were performed to see if the klystron behaves as it did in SLAC Electrically it works

NEXT STEP RF To remove any doubts about the exact voltage we are running at we need to put RF on the tube and compare to gain curves from SLAC Initial testing is into short waveguide system with two RF loads

First RF from klystron on 6th September Snippet from logbook No vacuum activity in klystron only loads

Latest news Running at 50Hz , ~350 kV, RF at 132ns, Gain of tube about 52dB Pin [W] Prf[MW] Gain [dB] ReRa [Hz] RFPW [ns] E [J] ave Pload [W] 52.2 7.94 51.8 50 132 1.05 52.40 Vacuum in loads Vacuum in rest of waveguide network No vacuum activity in klystron 

Next Steps Continue RF conditioning Verify gain curves to complete voltage calibration Loads are limiting factor (hopefully) Will probably take some time before we reach nominal power Once loads are conditioned install final assembly for cavity testing May be a good idea to recover conditioned loads from SLAC?

Future SAPS at CERN (1) We have ordered two more industrialised XL5 klystrons fron CPI 1 for spare and 1 for second test area CPI working with SLAC to finalise design Klystron Schedule Final design review October 2011 Delivery 1st Klystron no later than December 2012 Deliver of 2nd klystron July 2013 Option to purchase a 3rd tube

Low Power klystron test stand Future SAPS at CERN (2) Call for tender for modulator, with option for a second will go out once final klystron design is accepted in October Spare tube, can it be a working spare in another test stand ? Any offers or ideas from our collaborators? Low Power klystron test stand Igor Syratchev has proposal for high rep rate multiple low powered klystrons to be used as test stand (see talk in AWG4 Thursday 18H00) There has been some initial contact with potential klystron suppliers Global market survey from CERN for klystrons and or turn key solution will be done this year

With budget approval and if an appropriate site could be found we would like to have a specific CLIC test area, even for drive beam klystron testing

Acknowledgements PSI Sinctritone Trieste Colleagues at CERN CEA Saclay Karl Schirm Stephane Curt Ghislain Rossat Igor Syratchev Jan Kovermaan Steffen Doebert Germana Riddone Luca Timeo And many more..... CEA Saclay Franck Peauger Abdallah Hamdi Wilfrid Farabolini SLAC Daryl Sprehn John Paul Eichner Eric Jongwaard Andy Haase PSI Sinctritone Trieste

Thank you for your attention