E450AJ BOOMLIFT for DECAM Tasks

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
PROPER USE OF FLOOR JACK AND SAFETY STANDS
University of Wisconsin Eau Claire By: Chaizong Lor
In this presentation you will:
CHE 185 – PROCESS CONTROL AND DYNAMICS CONTROL OF BATCH PROCESSES.
Lift Safety EZ Up 10’ Lift. Training Objectives  Identify lift hazards  Understand OSHA equipment requirements  Know how to inspect equipment  Take.
ROUGH TERRAIN CONTAINER HANDLER “RTCH”
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
OSHA Susan Harwood Training - AGC Fall Protection Susan Harwood Grant Training Program 2013 Scaffolds, Ladders and Lifts.
Crane and Hoist Training
Excavating and Lifting Part 3
Which Standards might apply to these hazards
NGfL CYMRU GCaD ACCESS EQUIPMENT.
Aerial and Scissor Lift Safety
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
PLS 2-10 TRANSMISSION SHIFT CONTROL 1. REVERSE 2. NEUTRAL 3. DRIVE 4. 3RD OR 4TH 5. DO NOT SHIFT 6. 1ST 7. 2ND.
© Business & Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check out.
Aerial Lifts University of Wisconsin Eau Claire By: Chaizong Lor.
USING THE DRIVE-ON HOIST. LOADING VEHICLE ON HOIST 01. Ensure that vehicle is centered left to right. 02. Make sure vehicle is in Park, parking brake.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
CTS PRO 04-S CTS PRO 06-S CTS PRO 08-S CTS-servis, a. s. Okřínek.
The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers.
Mine Fresh Air Base.
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
DARK ENERGY CAMERA INSTALLATION AT CTIO For DES director review F. Munoz –CTIO -May
Outline of Crane Operator Training For BMRC Labournet.
JLG E450AJ boomlift - Electric, 45ft (13.7 m) platform vertical height, AJ= basket jib capabilities. - horizontal span = 7m ton weight, for handling.
DECAM LN2 PUMP REMOVAL - CHECKLIST
Welcome to The Warwickshire & West Mercia CRC Display Screen Equipment Training Next Slide.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Topic 1.7 Aircraft Salvage Procedures
Automotive Engines Theory and Servicing
Basic Forklift Operation
Week 3: Structures Plan for Giant Trampoline Bridge in Paris.
SBN Far Detector Installation & Integration
Hand Signals for Crane Operations.
Escalator Installation
Who is Responsible for Overhead Crane and Hoist Operations
Craning the Detectors: Practical or Just Possible?
Plan for the installation of the TAMU screen
Safe Rigging Practices
Emergency Egress.
SAFE WORK INSTRUCTIONS
High Pressure Water Jetting
Advantages of Rigging Equipment Guided by, Roma Enterprises
Overhead and mobile crane safety
Click anywhere to get started…
F&T Inc. OVERHEAD CRANE SAFETY.
Information Lesson KBT 2.1
SAFE WORK INSTRUCTIONS
Operating panel instruction
ACCESS EQUIPMENT.
Click anywhere to get started…
Family care home health agency, llc
PROPER USE OF FLOOR JACK AND SAFETY STANDS
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
custom-engineered solution
Automotive Engines Theory and Servicing
Presentation transcript:

E450AJ BOOMLIFT for DECAM Tasks The E450AJ boom lift equipment arrives to CTIO this week and several movements and tasks around 4m building were performed in order to confirm: - Rigging and lifting procedure. Operative ranges. Behavior : Oscillation, response time, Emergency fuses. Dario Guajardo (TelOps) and F. Munoz (ETS) were trained to safe operate this stuff by the vendor, last week before arrival.

E450AJ BOOMLIFT for DECAM Tasks Handling to C-floor: - Quite complex task: 5 people, 4 hours - Requires M&P floors sub hatch removal , AC chamber up. Both 50-5 hook at bridge crane to be used. - Specific 8m slings + 6 shackles (purchased).

E450AJ BOOMLIFT for DECAM Tasks

E450AJ BOOMLIFT for DECAM Tasks

E450AJ BOOMLIFT for DECAM Tasks Stow at C-floor - Stuff weighs 6.7 tons and must be parked west side of telescope (beams frame can resist this load) - Check always interference with dome rotation - Charge batteries ALL NIGTHS. Don’t lead batteries to a full discharge. (supply: 220 VAC.) - Equipment is stow by locking 3 safety points: 2 push buttons plus a key. - No oil leaks detected after 3 operative days. During shutdown both battery charging and key management should be under foreman check list.

E450AJ BOOMLIFT for DECAM Tasks Operative: - boomlift height is 45 ft (13.8m) straight vertical. People could reach from c-floor to lower side of dome catwalk (bridge crane structure) ~ 15.25 meters. Horizontal limit is 7m at 5m height - Hydraulic systems at the primary and secondary arms has no delay in response, lifting speed is adjusted by a controlled valve. Delay could increase to few seconds at the top vertical position. (TAMU test) - For complex arms configuration, the basket could reach the position in 90s (telescope scaffold access, over the horseshoe structure ) - Oscillation at top position is slightly affected by dome rotation

E450AJ BOOMLIFT for DECAM Tasks

E450AJ BOOMLIFT for DECAM Tasks

E450AJ BOOMLIFT for DECAM Tasks

Expected DECAM Shutdown access to telescope

Expected DECAM Shutdown access to telescope