Original Configuration

Slides:



Advertisements
Similar presentations
Hot Plug PCI. 2 PP ppt PCI Hot Plug Objective  To Enable higher availability of file and application servers by standardizing the process of removing.
Advertisements

Configured network infrastructure changes Lefthand P4500 SAN Configured, Deployed, and Certified Blade Server Chassis and Server Blades Assembled.
Queue Assignment - Flights With Airline Created Slots CDM A & D Meeting June 5, 2001.
LAFA Food Distribution July 26, Introduction:
PROJECT PRESENTATION Battery Swapping Reliability Wesley Lavender EMIS 7305.
Copyright © 2014 EMC Corporation. All Rights Reserved. Data Mover Failover Upon completion of this module, you should be able to: Data Mover Failover Test.
Semi-Topless There are many ways of going semi- topless, let your imagination run wild! This means you still retain some of your airbox cover, that houses.
Original Tree:
1 Module 12 Computation and Configurations –Formal Definition –Important Terms –Examples.
Distributed Object System. Project Goals Develop a distributed system for performing time-consuming calculations. Load Balancing support. Fault Tolerance.
Module 8 Installation & Setup M1000e Chassis
Application life cycle in SharePoint 2010.
To run the program: To run the program: You need the OS: You need the OS:
MediaLoft New York By William Leung. Introduction Determine the effectiveness of the television campaign for MediaLoft café Goran Mancherski.
Do You Need To Run 24/7? So How Do You Do System Maintenance? “Spiral Development” With Advanced Traffic Control, Inc.
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
LAFA Food Distribution
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
ITIL and the Superbowl Best Practices are sometimes the root cause of failure Superbowl XLIX L. Ryan, 2/1/15.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
Sorting Algorithms Data Structures & Problem Solving Using JAVA Second Edition Mark Allen Weiss Chapter 8 © 2002 Addison Wesley.
ATLAS HSIO DEVELOPMENT BOARD TESTING An Overview and Test Summary of High Speed Input/Output Boards Lawrence Carlson August 10, 2010.
Bubble Sort.
Easier Platform Administration using SAS 9.4 Grid Option Sets SAS New South Wales User Group - Nov 2015 Andrew Howell ANJ Solutions Pty Ltd.
11 Intel Modular Server Understanding the Storage MFSYS25 MFSYS35.
How to upgrade VSeWSS projects? Common issues you might run into.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Backing Up and Restoring Databases by Using the SQL Server 2000.
OCR Availability ● Allows you to set preferences for interview scheduling system ● COIN will attempt to schedule on-campus interviews around your conflicts.
Subtractive Manufacturing Exercise #1 Part 3 Key Fob Project Using Velocity CNC Software for the CNC Milling Machine Note: In order to use this set of.
IBM Systems Group © 2005 IBM Corporation This presentation is intended for the education of IBM and Business Partner sales personnel. It should not be.
 Each program needs separation.  Better computer security by not installing multiple programs on one system.  Most out-of-the-box software assumes.
Reflections A reflection is a FLIP over a line.. Also a reflection has: The same DISTANCE from a central line. The same SIZE as the original image.
PERMISSION ANALYZER 2 Reports NTFS permissions from the file system combined with user and group data from the Active Directory.
X-Series Architecture
RCE Application Workshop
FIG 01: ASSEMBLED COTTERED JOINT
New CaseID mapped to my Text1 property
Scheduler/Epic Integration
Quicken Installation Problem Number More info :
Quicken Help Phone Number More info :
Malwarebytes Setting and Configuration Issues
Malwarebytes Not Removing Trojan Virus
2018 Real CompTIA N Exam Questions Killtest
Water Well Screens. Johnson Screens Rod Based Well Screens.
Continuous Slot Well Screens.
Unit 1 Transformations in the Coordinate Plane
An NP-Based Router for the Open Network Lab Hardware
التنقية الخطوة الخامسة.
Symmetry and Coordinate Graphs Section 3-1
האם התקשורת הכלכלית בישראל חופשית?
Update Structures ____________________________________________
Currency Swaps. 1Meaning CurrencySwapsrefertothearrangementwhereprincipaland interestpaymentsinonecurrencyisexchangedforsuch paymentsinanothercurrency.
بسم الله الرحمن الرحیم.
  30 A 30 B 30 C 30 D 30 E 77 TOTALS ORIGINAL COUNT CURRENT COUNT
Reflections.
مديريت موثر جلسات Running a Meeting that Works
H4 (9003, HB2) Hi/Lo Reverse Polarity Guide
REFLECTION RIGID MOTIONS PT. 2.
3.91 ANALOGY: If you had $ which I take, then I give you back $35.45, you have lost 72.07% of your money, or have 27%! 2 XI3 + 3 Cl2  2 XCl3.
Solaris 10 Installation Guide
N! 4 x 3 x 2 x 1 = 24.
Glide slide 2 slide 4 walk walk run run run run.
Insertion Sort Array index Value Insertion sort.
WELCOME How to Fix Technical Bugs Faced By AVG Users? CALL NOW
Slope Graphing Day 2.
Let’s start an intro unit to Geometry!!
the angular speed is zero. the angular speed is constant.
FNAL Hybrid Testing Status
Presentation transcript:

Original Configuration SFP 5.1 SFP 4.1 SFP 3.1 SFP 5.2 SFP 4.2 SFP 3.2 SFP 5.3 SFP 4.3 SFP 3.3 SFP 5.4 SFP 4.4 SFP 3.4 SFP 5.5 SFP 4.5 SFP 3.5 SFP 5.6 SFP 4.6 SFP 3.6 SFP 5.7 SFP 4.7 SFP 3.7 SFP 5.8 SFP 4.8 SFP 3.8 SFP 5.9 SFP 4.9 SFP 3.9 SFP 5.10 SFP 4.10 SFP 3.10 RTM 5 RTM 4 RTM 3 SLOT 4 SLOT 3 SLOT 5

12 NPR Test Results (10 Runs) ** SFP 5.1 SFP 4.1 SFP 3.1 *** SFP 5.2 SFP 4.2 SFP 3.2 SFP 5.3 SFP 4.3 SFP 3.3 SFP 5.4 SFP 4.4 SFP 3.4 ** SFP 5.5 SFP 4.5 SFP 3.5 SFP 5.6 SFP 4.6 SFP 3.6 SFP 5.7 SFP 4.7 SFP 3.7 SFP 5.8 SFP 4.8 SFP 3.8 SFP 5.9 SFP 4.9 SFP 3.9 SFP 5.10 SFP 4.10 SFP 3.10 RTM 5 RTM 4 RTM 3 SLOT 4 SLOT 3 SLOT 5

2 NPR Test Results (13 Runs) (Swapped SFPs) *** SFP 5.3 SFP 4.3 SFP 3.2 SFP 5.4 SFP 4.4 SFP 3.5 ** SFP 5.5 SFP 4.5 SFP 3.4 SFP 5.6 SFP 4.6 SFP 3.6 SFP 5.7 SFP 4.7 SFP 3.7 SFP 5.8 SFP 4.8 SFP 3.8 SFP 5.9 SFP 4.9 SFP 3.9 SFP 5.10 SFP 4.10 SFP 3.10 RTM 5 RTM 4 RTM 3 SLOT 4 SLOT 3 SLOT 5

3 NPR Test Results (10 Runs) (Swapped RTMs) SFP 5.2 SFP 3.1 SFP 4.1 * * SFP 5.1 SFP 3.3 SFP 4.2 ** SFP 5.3 SFP 3.2 SFP 4.3 SFP 5.4 SFP 3.5 SFP 4.4 * SFP 5.5 SFP 3.4 SFP 4.5 SFP 5.6 SFP 3.6 SFP 4.6 SFP 5.7 SFP 3.7 SFP 4.7 SFP 5.8 SFP 3.8 SFP 4.8 SFP 5.9 SFP 3.9 SFP 4.9 SFP 5.10 SFP 3.10 SFP 4.10 RTM 5 RTM 3 RTM 4 SLOT 4 SLOT 3 SLOT 5

3 NPR Test Results (10 Runs) (Swapped RTMs and Swap SFPs) * SFP 5.1 SFP 4.2 SFP 3.3 ** SFP 5.3 SFP 4.3 SFP 3.2 SFP 5.4 SFP 4.4 SFP 3.5 * SFP 5.5 SFP 4.5 SFP 3.4 SFP 5.6 SFP 3.6 SFP 4.6 SFP 5.7 SFP 3.7 SFP 4.7 SFP 5.8 SFP 3.8 SFP 4.8 SFP 5.9 SFP 3.9 SFP 4.9 SFP 5.10 SFP 3.10 SFP 4.10 RTM 5 RTM 3 RTM 4 SLOT 4 SLOT 3 SLOT 5

Original Configuration with new SFPs in 3. 2, 3. 3, 3. 4, 3. 5, 5 Original Configuration with new SFPs in 3.2, 3.3, 3.4, 3.5, 5.1 10 runs, no failures SFP 5.1 SFP 4.1 SFP 3.1 SFP 5.2 SFP 4.2 SFP 3.2 SFP 5.3 SFP 4.3 SFP 3.3 SFP 5.4 SFP 4.4 SFP 3.4 SFP 5.5 SFP 4.5 SFP 3.5 SFP 5.6 SFP 4.6 SFP 3.6 SFP 5.7 SFP 4.7 SFP 3.7 SFP 5.8 SFP 4.8 SFP 3.8 SFP 5.9 SFP 4.9 SFP 3.9 SFP 5.10 SFP 4.10 SFP 3.10 RTM 5 RTM 4 RTM 3 SLOT 4 SLOT 3 SLOT 5

12 NPR Test Results (10 Runs) Original Configuration with new SFPs in 3.2, 3.3, 3.4, 3.5, 5.1 8 runs, no failures SFP 5.1 SFP 4.1 SFP 3.1 SFP 5.2 SFP 4.2 SFP 3.2 SFP 5.3 SFP 4.3 SFP 3.3 SFP 5.4 SFP 4.4 SFP 3.4 SFP 5.5 SFP 4.5 SFP 3.5 SFP 5.6 SFP 4.6 SFP 3.6 SFP 5.7 SFP 4.7 SFP 3.7 SFP 5.8 SFP 4.8 SFP 3.8 SFP 5.9 SFP 4.9 SFP 3.9 SFP 5.10 SFP 4.10 SFP 3.10 RTM 5 RTM 4 RTM 3 SLOT 4 SLOT 3 SLOT 5