Background Rejection Prep Work

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
S. Ritz 1 Hardware Trigger Throttle Issues Context: the triggers Purpose of throttle on TKR trigger Earlier design using TKR geographic information The.
Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 1 Partial validation of v9r3 - Bkg. Rej. Comparison 2000 sec. of backgrounds were run using v9r3 (heros: Tom.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
Bill Atwood, SCIPP/UCSC, Apr. 3, 2006 GLAST 1 Pass 4 and Preparing for the LAT Handoff to NASA Why we can't go with the DC2 Analysis (Pass 3) 1) Background.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 DC2 Discussion – What Next? 1)Alternatives - Bill's IM analysis - ???? 2)Backing the IM Analysis into Gleam.
David WrenDC1 Closeout, 13 February OnboardFilter Update Work done by: Navid Golpayegani J.J. Russell David Wren Data Challenge I Closeout Meeting,
GLAST LAT ProjectTrigger Scheduler, Engines, and Rates 6 Feb 2006 J. Eric Grove Naval Research Lab Washington DC Trigger Scheduler, Engines, and Rates.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST 1 DC1 Instrument Response Agenda Where are we? V3R3P7 Classification Trees Covariance Scaled PSF Pair Energies.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
Onboard Filter Update Performance after updated cuts David Wren 26 January 2004.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
Analysis Meeting 17 Oct 05T. Burnett1 UW classification: background rejection Update with new all gamma and background samples.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
T. Burnett: IRF status 5-feb-061 DC2 IRF Status Meeting agenda, references at:
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
Science Requirements Verification GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 2 of 12 GLAST Large Area Telescope Gamma-ray Large.
1 ACD studies: 1. Light Yield Determination for top ACD Tiles 2. Looking for holes (screws) in the ACD data Instrument Analysis Workshop VI Luis C. Reyes.
Background runs at the UW “farm” A little background: we have installed the GRID-standard condor from the other UW in Madison. –Currently 6 CPUs available,
Classification and Regression Trees for Glast Analysis: to IM or not to IM? Toby Burnett Data Challenge Meeting 15 June 2003.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Bill Atwood, SCIPP/UCSC, Jan., 2006 GLAST 1 The 3 rd Pass Back Rejection Analysis using V7R3P4 (repo) 1)Training sample: Bkg: Runs (SLAC) v7r3p4.
Analysis meeting 11July05 - T. Burnett 1 Status of the Background Review DC2 prep meeting: Switch to CRflux package by Mizuno for charged particles, Earth.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CalRecon Moments Analysis Studies I Tracy Usher1/17 A Brief History of Glast Release GR (Friday, July 15) –Effectively, the first DC-2 2M all-gamma.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
DC2 at GSFC - 28 Jun 05 - T. Burnett 1 DC2 C++ decision trees Toby Burnett Frank Golf Quick review of classification (or decision) trees Training and testing.
Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Data Sets: Muons: allMuon-GR-v13r9 (14- Jan-2008) AG: allGamma-GR-v13r9.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
2012/7/231 Cosmic Ray at STAR Shuai Yang Center of Particle Physics and Technology University of Science and Technology of China STAR Regional Meeting.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
Bill Atwood, 6-Feb-2008 Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Overview Overview Data Sets: Muons: allMuon-GR-v13r9.
Throttle Studies David Wren Analysis Group Meeting 22 March 2004.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Background Rejection Activities in Italy
Effect of t42 algorithm on jets
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
GLAST LAT tracker signal simulation and trigger timing study
Downlink rates The next slide was presented to Jonathans’ flux review
Overview Goal Study GEM variables in SVAC ntuple
Testing some CAL specs Level 3 CAL requirement 5.5.5:
Imaging crystals with TKR
Mini Tower Preliminary Results
Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast
Searching for photons in the LAT
CR Photon Working Group
Eduardo do Couto e Silva Feb 28, 2006
Status Report and highlights from workshop II
GLAST Large Area Telescope
Shaped Digital Readout Noise in CAL
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

Background Rejection Prep Work Plan two stages: 100M event run(s) then full DC2 background run (~1B events) 100M event generation for first new background studies: prior to pushing the button (in two weeks?) want geometry final checks (TKR, ACD, CAL, NAD) physics final checks (MS, step sizes) background fluxes (agree and document, see Toby’s talk) not include heavy ions? check processing times. include albedo gammas in 100M run; for DC2 background runs, plan to do a separate set of runs (attitude dependent) propose just do few orbits and then replay those events hardware trigger checks (mainly CAL & vetoes) onboard filter (agree on the selection bits) bad channel lists no bad channels for ACD&CAL; for TKR suggest we do 0.1% random single channels plus 0.5% “blotches” of 4-200 strips. [For DC2, we’ll have the REAL LIST!] zero suppression and noise checks propose that, for DC2, we raise the CAL zero-suppression threshold back to 2 MeV. We have a trade: event rate to the ground vs CAL zero-suppression threshold (mainly affects energy resolution at low energy). check ACD efficiencies (run 10M muons through center of one tile as an end-to-end check) generation plan TBR in 2 weeks (after Bill has a chance to look at current tuples). One (or two?) 100M event runs, then the big DC2 run according to Julie’s schedule.

Background analysis prep continued What we keep: use the Onboard Filter, run in passthru mode so we have all the status bits for background events (including gamma albedo), for large majority of runs, if filter rejects event don’t run recon and don’t write out events. for a small subset of runs (<x2 final sample increase), run recon and write out events as a check. for all_gamma events, run recon and write out ALL events. For support of the analysis need recons checked tuple check (floats), document demonstrate ability to reprocess all or subset of events peeling eventlists, event display of these events classification tree infrastructure comparisons and operating plan