Flex Series & View Series

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Drawing furniture using One Point Perspective
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
STAIRS AND STAIR FRAMING
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
Tektrim Installation Installing the UMB.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
11 – 6f Area, Surface Area & Volume
Congruence and Similarity
Solve an equation using subtraction EXAMPLE 1 Solve x + 7 = 4. x + 7 = 4x + 7 = 4 Write original equation. x + 7 – 7 = 4 – 7 Use subtraction property of.
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.
FOR: MRS. GOODHUE’S CLASS BY: MRS. CAMUTO STUDY GUIDE FOR AREA, PERIMETER, VOLUME AND SURFACE AREA.
Area of Rectangles, Squares, Parallelograms, Triangles, and Trapezoids.
EXAMPLE 2 Standardized Test Practice SOLUTION =+.
Perimeter and Area Equations.
Technical and Installation 1. What will my slot depth/size for the bottom track need to be? The slot depth for standard flush tracks and full drainage.
Example This Tutorial takes 1 image and animates its entrance in 4 dynamic ways. S ometimes all it takes is a little “thinking outside.
Apply the Pythagorean Theorem
1 Point Perspective A packet designed to help you create your name in one point perspective.
J.Byrne Draw the outer shape of the room to sizes given. J.Byrne
Before - CarpetAfter - Tiles SCHOOL TO WORK. BY:ZACHARY AND JULIAN.
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
Drawing a Bed in One-Point Perspective The red lines show the height and width of the bed. The vertical red line shows the side of the bed against the.
Madness! Listen to the rules of Game, so your team has a chance to WIN!
Freehand Sketching. Draw a horizontal line about 70 mm long, and then another six lines underneath, each separated by about 10 mm.
Solve an equation using addition EXAMPLE 2 Solve x – 12 = 3. Horizontal format Vertical format x– 12 = 3 Write original equation. x – 12 = 3 Add 12 to.
SANTANA DRAFTING MULTIVIEWS 1 An introduction Mr. Fitzgerald Rm
Windows and doors Why do we have windows? – Light – Ventilation – Beauty – Energy (heat and cold, in and out) – View, etc.
I’m Thinking of a Number
I can compare attributes of 2-dimensional figures with 3-dimensional figures by drawing and constructing nets and models.
Pythagoras Theorem Hypotenuse NB
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Basic Technical Drawing Centering a Drawing By Tim Closs.
EXAMPLE 1 Add polynomials vertically and horizontally a. Add 2x 3 – 5x 2 + 3x – 9 and x 3 + 6x in a vertical format. SOLUTION a. 2x 3 – 5x 2 + 3x.
Geometry – Triangles and Trapezoids.  All Triangles are related to rectangles or parallelograms : Each rectangle or parallelogram is made up of two triangles!
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Announcements Finish factoring expressions Study for quiz over: Writing addition and subtraction expressions Writing and expanding multiplication expressions.
 Grid Systems -how to locate places on a map. Alphanumeric Grid  This type of grid system uses letters and numbers to identify squares in a grid pattern.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
APPLICATIONS OF TECHNOLOGY
Door Types.
Installation Walkthrough Image Guide
Basic Elements of Composition
Area of Rectangles, Squares, Parallelograms, Triangles, and Trapezoids
A Parents’ Guide to Alternative Algorithms
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Drawing Alcoves using One Point Perspective
GLASS MEASURING GUIDE View Series.
5 Minute Check Find the area. Complete in your notes
This Tutorial takes 1 image and animates its entrance in 4 dynamic ways. Sometimes all it takes is a little “thinking outside the box” to really get.
The NxtWall Advantage.
MULTIVIEWS 1 An introduction
VIEW SERIES Track Assembly & Installation
Area of Polygons.
Sliding Swinging Fixed Double-hung Combination Skylights Clerestory
Orthographic Projection
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
UNIT 8: 2-D MEASUREMENTS PERIMETER AREA SQUARE RECTANGLE PARALLELOGRAM
#3 Grade 1 ~ Sight Words Pictures series in film strip effect
Orthographic Projection
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
Section 1 – Apply the Pythagorean Theorem
#6 Grade 1 ~ Sight Words Pictures series in film strip effect
#1 Grade 1 ~ Sight Words Pictures series in film strip effect
#4 Grade 1 ~ Sight Words Pictures series in film strip effect
Creating Sheet Metal Pattern
1. Solve x2 = 100. ANSWER 10, –10 2. Solve x2 + 9 = 25. ANSWER 4, –4
Orthographic Projection
Use pages Tell how each window looks and how it opens and closes.
Presentation transcript:

Flex Series & View Series GLASS MEASURING GUIDE Flex Series & View Series

Measuring Glass For Flex Series -1/8” For the FLEX SERIES: Measure from stud bead to stud bead then subtract 1/8” as shown above.

Flex Series Track to Stud Measuring Track to Stud Setting the Glass GLASS When measuring Track to Stud, place your tape measure inside the bottom track and measure up to the stud bead and subtract 1/8” as shown in the picture. When setting the glass: first set the glass down into the bottom track (as shown) and rest the glass against the stud bead. The finish trim will snap into the stud and hold the glass firmly in place. -1/8”

Clerestory GLASS When measuring a clerestory, place your tape against the stud bead and measure up to the top track like shown in picture and add a 1/2". +1/2 Example of how the glass sets

Flex Series Full Height Glass Place your tape measure into the top of the top track against the track bead and measure down to the top of the bottom track and subtract an 1/8" or 1/4" depending on the levelness of the floor. Note: if the floor is really out of level you can order a trapezoid pane of glass if needed. GLASS -1/8" or -1/4" When measuring for Flex Series full height glass you will need to measure both sides of your opening and adjust your measurement appropriately. 1/2 Shim

Vertical Glass Measurements View Series Vertical Glass Measurements Screw Screw When measuring the vertical measurements of the View Series, place your tape measure on the head of the screw in the top track and measure to the very top of the bottom track and subtract 1/4”. You will want to take multiple measurements along the length of your track. GLASS -1/4" Shim Example of Installed Glass

View Series Horizontal Glass Measurements If your project has between 2 and 6 panes of glass in a partition you will need to measure the VO (visual opening) and add a 1/2” to your overall measurement, then divide by the number of panes of glass you have. For example: If I had 4 panes of glass and my VO was 96 + 1/2” = 96 1/2 then divide by 4 = 24 1/8 for four panes of glass. When measuring for a single side light, you will measure the visual opening and add 3/4” Glass Note: If you have more than 6 panes of glass consult with the NxtWall team on how to measure the Width of your opening.