VMM and the SRS - update Michael Lupberger.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
Miniweek WG5 June 2015 Hans Muller CERN/RD51
R. Ball September 27 th  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
News on GEM Readout with the SRS, DATE & AMORE
Online Reconstruction 1M.Ellis - CM th October 2008.
Details of 28” LED segment
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
Testbeam Post Mortem Immediate reflections on successes and failures Richard Plackett – University of Glasgow VELO Upgrade.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
WP13 Task and “Tools to facilitate detector development” STATUS of the ACTIVITIES WP13 Innovative gas detectors 16 March 2016.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
Trigger & Tracking detector for CMS
“Medium Term”: VFAT2 + SRS readout system
Testbeam Planning Common to all testbeams:
The Jülich Digital Readout System for PANDA Developments
n-XYTER Hybrid Developments
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
PRAD DAQ System Overview
S. Martoiu, A. Rusu IFIN-HH/CERN
Pixel panels and CMOS Read-out electronics
DHH progress report Igor Konorov TUM, Physics Department, E18
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Comments on the DAQv2 advancement
Michael Lupberger Dorothea Pfeiffer
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Testbeam Timing Issues.
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Large CMS GEM with APV & SRS electronics
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
Electronics and DAQ for the GEM Detector
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Setup for testing LHCb Inner Tracker Modules
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

VMM and the SRS - update Michael Lupberger

Outline Summary from last presentation at Aveiro Progress Outlook

Summary slide of presentation in Aveiro Permanent test setup in GDD lab Powering through SRS DCard is challenging New wire-bonded VMM2 hybrid works Outlook: Get ready to read out an ESS prototype detector with VMM at test beam in October

Thermal neutron beam test at IFE/Norway Oct/Nov 2016 Data taken with a 10 cm x 10 cm Gd-GEM with a trigger rate of 8 kHz Clustering has to be done based on BCID and TDC Trigger rate of 9.8 kHz necessary to avoid overflow of BCID with 40 MHz clock

Progress: Powering Powering through SRS DCard is challenging → can only be done with short (<5m) HDMI cables → new powering scheme: HDMI (Data,Clk, power) SRS FEC SRS DCard HDMI (Data,Clk) Power Box HDMI (Data,Clk, power) Up to 8 HDMI per FEC 8x HDMI in can be long 16x HDMI out: - 8 master - 8 salve max. 5 m External power

Progress: Powering Powering through SRS DCard is challenging → can only be done with short (<5m) HDMI cables → old powering scheme still possible: SRS FEC SRS DCard HDMI (Data,Clk, power) Up to 8 HDMI per FEC max. 5 m

Progress: Wire bonded VMM2 hybrid New wire-bonded VMM2 hybrid works Used at ESS test beam at IFE in Oslo for a short time test (limited beam time) → need cooling → need dedicated DAQ Software (thanks George, Dan for providing the “work in progress” NSW VMM software.

Ongoing: Software development: Online monitoring, data acquisition, slow control → help from ESS/BrightnESS partners e.g. Martin Shetty: Online Monitoring, Data analysis

Ongoing: Software development: Online monitoring, data acquisition, slow control → help from ESS/BrightnESS partners e.g. Morten Jagd Christensen: Fast UDP socket

Ongoing: Software development: Online monitoring, data acquisition, slow control → help from ESS/BrightnESS partners I am currently working on the slow control, George/Dans tool as starting point

Ongoing: VMM3 hybrid Alex is working on it, about to be finished Will use wire bonded VMM3 Reminder: VMM3 hybrid will have new connector! FX10A-140S14-SV on Detector, FX10A-140P14-SV1 on hybrid (there will be an adapter to the current samtec connector)