Micromegas Vertex Tracker Status Report

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
Micromegas Bulk Demonstrator One type of Bulk: Active area; 115 mm for 288 strips, 500 mm long Material: 100 µm PCB, 5 µm Cu, 18µm mesh, 20µm Mylar Two.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Micromegas for the Central Tracker Sébastien Procureur CEA-Saclay.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CLAS12 DAQ & Trigger Status
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
Production ad Quality control of RPCs for the CMS muon barrel system
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
CLAS12 - CT meeting 10 October 2013
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Hall A Compton Electron detector overview
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Work packages status in Torino and perspectives
TPC Large Prototype Toward 7 Micromegas modules
Status of n-XYTER read-out chain at GSI
Pierluigi Paolucci - I.N.F.N. Naples
Example of DAQ Trigger issues for the SoLID experiment
Han Jifeng BESIII MUON GROUP IHEP, CAS
UK CMS Oversight Committee Mtg
Testbeam status report
(On Behalf of CMS Muon Group)
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
Pierluigi Paolucci & Giovanni Polese
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Micromegas Vertex Tracker Status Report Latest news about the MVT, FMT and the associated electronics J. Ball MVT Status report 3/28/2017

The CLAS12 MVT Project : Barrel and Forward Setup 18 Barrel Tiles Total of 6 layers segmented in f (3 x 120° sectors) Total of 18000 channels Resistive strips Two phases: 2 Layers (6 det.) then 6 Layers (18 det.) 6 Forward Disks Resistive strips divided in 2 zones: inner/outer 1024 strips, pitch 525 µm Dimensions: 430 mm diam. disk with a 50 mm diam. hole J. Ball MVT Status report 3/28/2017

Electronics: MVT readout system Data concentration backend electronics 10-15 m Detector links Off-detector frontend electronics 1.5-2 m Optical links 26k channels ~400 cable assemblies 54 512-channel FEUs ~500 Dream ASICs 54 optical links @ 2.5Gbit/s 1 BEU (may be 2) with 3-4 SSPs 20 kHz trigger rate 16 µs trigger latency J. Ball MVT Status report 3/28/2017

J. Ball MVT Status report 3/28/2017 Electronics Status All the needed Electronics components have been produced. MVT / FTT DAQ enriched with self-trigger readout mode -> Handy for tests with cosmics -> Possibility to select multiplicity on frontend and backend levels Interface between the MVT / FTT slow control and the Clas12 EPICS framework validated -> Major part of the remaining work will be accomplished during the June 2017 integration period On-going work to secure MVT / FTT Low Voltage distribution -> Choice to use more robust Harting connectors J. Ball MVT Status report 3/28/2017

MVT barrel B6 filling with detectors MVT – 6-layer mechanical structure Barrel carbon mechanics ready Interface B6 (3 double layers) with MVT tube ready Integration of 6 curved micromegas for sector 1 under progress for autotrig cosmic run week 13 (March 27 to 31) Integration of micromegas in sector 2 and 3 weeks 14-16 Full B6 cosmic run week 16 (April 18 to 21) MVT and FTT electronics air cooling with remote fan validated 3D printing of final component under progress MVT B6 with CR6C in sector 1 Remote fan J. Ball MVT Status report 3/28/2017 MVT Status Report J. Ball March 2017

Forward vertex tracker The 6 detectors have been delivered to Jlab 2 spare detectors are still under construction and are foreseen to be ready during Fall 2017 J. Ball MVT Status report 3/28/2017

MVT gas distribution rack and control rack MVT distribution rack (DR) done and tested MVT control rack with (CR) PLC done and under test with DR PDF documentation in progress  Ready for MVT cosmic run at Saclay for week 13 MVT barrel and forward gas control rack MVT distribution gas rack under test J. Ball MVT Status report 3/28/2017 MVT Status Report J. Ball March 2017

Barrel tests – Cosmic bench Trigger - 2 Scintillators in coincidence Efficiency calculation - Compute track of particles using reference detectors. - Check if the Micromegas has signal at the expected position. - Efficiency is the ratio : J. Ball MVT Status report 3/28/2017 MVT Status Report J. Ball March 2017

Detector tests – Cosmic bench Barrel detectors Tests (layer by layer) : - CR4Z : 4 detectors : tests OK, in boxes - CR4C : #1 and #2 detectors tests OK, #3 in test, #4 ready for test - CR5Z : #1 to be redone, #2 in test, #3 and #4 ready for test - CR5C : #1 under integration at Saclay #2 test flat OK, #3 under bulk at CERN => Saclay week 13, #4 under bulk at CERN => Saclay week 18 - CR6Z : 4 detectors : tests OK, in boxes - CR6C : 3 detectors : tests OK, in boxes CR6C v2 : 4 spares to be made for June J. Ball MVT Status report 3/28/2017

J. Ball MVT Status report 3/28/2017 Software 1 - Files are decoded 2 - Pedestals substraction (average of the ADC without signal) 3 - Common noise suppression (noise common to all the strips of an ASIC) 4 – Zero suppression (root mean square (RMS) calculation and suppression of signals below a threshold (5 times RMS for example)) Geometry of the detectors has been implemented in Gemc (M. Garçon) Hitprocess nearly ready and calibration software as well Next important step will be merging with COATJAVA Maxime Defurne will be at Jlab in a fortnight to stay for one year and will be on site to complete the work. He will be joined in June by Guillaume Christiaens, PhD Student J. Ball MVT Status report 3/28/2017

J. Ball MVT Status report 3/28/2017 CONCLUSION Project started with R&D at the end of 2005. Design Tracker Three Scientific Supervisors were involved throught the years on the Project but there is still one and only unalterable S. Aune as Project Leader. The team is looking forward to start the final installation at Jlab which will be initiated in June 2017. J. Ball MVT Status report 3/28/2017