FACILITY LAYOUT Facility layout is a process of arranging all the tangible resources available in the production or a service facility in a manner to maximise.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

METHODS OF PRODUCTION Business must decide on the most suitable method of production. The objective is to minimise the cost per unit, i.e. productive.
Process Selection and Facility Layout
10-1 Chapter 10 Facilities Layout and Location McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Activity relationship analysis
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Chapter 10 – Facility Layout
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
PLANT AND WORKSHOP LAYOUT
Industrial Facilities Design
Session Pooja patnaik.
Plant Layouts Prepared by Bhakti Joshi June 20, 2013.
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Layout Strategy.
Office Layout Techniques and Space Requirements
Facility Design and Layout
Prepared by Bhakti Joshi June 27, 2014
Chapter 4 Process Design.
MGT Operations Management
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
UNIT 2 WORK STUDY, INCENTIVES AND SAFETY. Work study It is the systematic examination of the methods of carrying on activities so as to improve the effective.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Principles of Plant Layout 1. Principle of integration: A good layout is one that integrates men, materials, machines and supporting services and.
Process Layout Chapter 7 July 20, 2005.
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
Chapter 6 Facilities Layout.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
FACILITIES LAYOUTS Facilities layout implies Layout design for equipment, machinery, & furnishings, production, support & personnel areas A layout is affected.
Facility Layout Objectives of Facility Layout Basic Types
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
PLANT LAYOUT. THE PLANT Refers to the physical components of the manufacturing process of the product Required both in terms of buildings and equipments.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
MSME  Micro small and medium enterprises
METHOD STUDY Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
UNIT-III Operations Management PREPARED BY CH. AVINASH.
The University of Jordan Mechatronics Engineering Department
METHOD STUDY.
PRODUCTION TYPES.
RECORDING TECHNIQUES.
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
CHAPTER 5 WORK STUDY (12 MARKS).
PRODUCTION PLANNING AND CONTROL
MENG 447 Manufacturing Systems Automation Chapter 1*
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities Planning and Design Course code:
MANUFACTURING SYSTEMS
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Departmental Planning
Facilities Planning and Design Course code:
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

FACILITY LAYOUT Facility layout is a process of arranging all the tangible resources available in the production or a service facility in a manner to maximise productivity. RESOURCES – men material machine

PRINCIPLES OF GOOD FACILITY LAYOUT Maximum safety Maximum utilisation of space Minimum distance and travel time Minimum investment Maximum coordination Sequence Maximum comfort Ease of access Maximum flexibility Minimum handling

OBJECTIVES OF FACILITY LAYOUT AVAILABILITY OF ADEQUATE SPACE FOR WORK ENSURE SMOOTH FLOW OF WORK SAFETY OF WORKER COMFORTABLE WORK ENVIRONMENT MINIMUM MOVEMENT OF RESOURCES BETTER SUPERVISION AND MONITORING DECREASE IN OVERALL PRODUCTION TIME INCREASED UTILISATION OF MEN AND MACHINE FLEXIBILITY

TYPES OF FACILITY LAYOUT PROCESS LAYOUT PRODUCT LAYOUT COMBINATION LAYOUT FIXED LAYOUT CELLULAR LAYOUT

1. PROCESS OR FUNCTIONAL LAYOUT All the activities or machines are arranged as per functions performed by them MACHINES HOMOGENEOUS FUNCTION GROUPED Suitable where small quantities of large no. Of products are manufactured

PROCESS LAYOUT

PROCESS LAYOUT DISADVANTAGES ADVANTAGES Manual handling of material Low pace of processing Requirement of more space Delayed detection of defective process Requires proper scheduling of resources ADVANTAGES Flexibility Less capital intensive Better utilisation of resources Better exposure to workers

2. PRODUCT OR LINE LAYOUT Resources are arranged productwise i.e. Arranged in a line or a sequence to meet production requirement of a specific product. Suitable where standardised products are manufactured in large quantities.

PRODUCT OR LINE LAYOUT

PRODUCT LAYOUT ADVANTAGES LIMITATIONS Uninterrupted flow of work Economies of large scale Automated handling of material Proper utilisation of resources Timely detection of defective good Less material handling cost Less space requirement LIMITATIONS Less flexible Heavy investment Breakdown will cause idle time Repetitive work Speed dependence on slowest machine

3. HYBRID OR COMBINATION LAYOUT PROCESS LAYOUT PRODUCT LAYOUT COMBINATION LAYOUT

4. FIXED LAYOUT Machines are installed at one place but men and material are moving from one place to another to carry on production.

FIXED LAYOUT ADVANTAGES LIMITATIONS High flexibility Less investment in layout Scope of job enlargement LIMITATIONS High equipment handling cost Non availability of skilled labour Underutilisation of men and machines Duplication of tools

5. CELLULAR OR GROUP LAYOUT Machines that produce homogeneous products are divided into various groups called cells

FACTORS AFFECTING LAYOUT PRODUCT – Heavy product – fixed layout Small product – product layout 2. VOLUME – Large scale production - line layout On specification of client – process layout

More space – process layout 3. AREA More space – process layout 4. TYPE OF MACHINERY- GENERAL PRODUCTION PROCESS SPECIAL PRODUCTION PROCESS PROCESS LAYOUT PRODUCT LAYOUT

MANUFACTURING PROCESS CONTINUOUS ANALYTICAL SYNTHETIC INTERMITTENT IRREGULAR 4. TYPE OF MACHINERY- PRODUCT LAYOUT PROCESS LAYOUT

Methods of production 6. METHODS OF PRODUCTION 7. WORKING ENVIRONMENT Project Job Batch FIXED LAYOUT PROCESS LAYOUT 7. WORKING ENVIRONMENT PLANT SITE MATERIAL

COMPUTER BASED METHODS Techniques of Layout Planning For laying out a plant there is no such universally accepted technique available. Application of one or more techniques depends upon many factors. These techniques can be divided into two main parts. MANNUAL METHODS COMPUTER BASED METHODS

1. Manual methods Process layout: Outline process chart Flow diagram String diagram Travel chart REL chart Product layout : Assembly line balancing

TIME OF EACH ACTIVITY ACTIVITIES Outline Process Chart: Outline Process Chart (OPC) is also known as Operation Process Chart. It is a graphical representation of all the ‘Operations’ and ‘Inspections’ of the whole process It presents the raw material used, activity to be performed and the time taken by the operator for the different parts of the work. The Standard Practices followed while making OPC is given below: Write name at the top of the chart. Use vertical lines in the downward direction to indicate the operations and inspections. Describe the activity on the right side and time of each activity on left side of the standard symbols. Label all operations in one serial order and inspections in another serial order. TIME OF EACH ACTIVITY ACTIVITIES

Activity: Repair of punctured scooter type Jack up scooter 1 Activity: Repair of punctured scooter type Chart begins: Scooter ready for jacking up Chart ends: Tube ready after repair to mount on tyre Method Charted by: Remove hub-cap of wheel 2 Loosen nut and place properly 3 Remove a wheel 4 Remove outer cover 5 Remove rim 6 Locate the puncture in tube 1 ACTIVITY SYMBOL METHOD (PRESENT) Operations 8 Inspection 2 Mark the puncture 7 Repair the puncture and remove nails, if any 8 Recheck 2

Flow diagrams: They presents movement or flow of workers, material and equipments during the execution of a work or operation and indicates the direction of travel with the help of arrows, drawn on the diagram. According to Robert, L. Harris, “flow diagram is a graphic representation of the physical route or flow of peoples, materials, paperwork’s, vehicles, or communication associated with a process, procedure plan, or investigation.”

FLOW DIAGRAM FOR MANUFACTURE OF BI-CYCLE PEDAL AXLE Raw material store Forge shop Raw material Cutting shed Heat treatment section Assemble section Part storage Machine shop (Turning Section) Inspection Milling section FLOW DIAGRAM FOR MANUFACTURE OF BI-CYCLE PEDAL AXLE

3. String Diagram: The diagram records heavy movement and distance travelled of worker, material or equipment at the job. Thee string diagram is a scale plan or model on which a thread is used to measure and trace the path of workers, material or equipment during a specified sequence of events. The layout plan of working area is fixed on a soft board. The pins are put on the layout on stops and turning points of the worker. A thread is woven on the pins as per movements of workers. The thread is then measured to find the actual distance covered by the workers. The diagram is useful in following circumstances: One worker working on several machines. Several workers working on a single machine.

Symbol Meaning Symbol Meaning STACK FOLD RIVERT DRILL DRILL RIVERT CUT CUT CHECK MARK CHECK FOLD SHEET METAL STACK SHEET METAL MARK Symbol Meaning “O” Operations Transportation Inspection Symbol Meaning Storage “D” Delay

Travel Chart: The chart records heavy and regular movements in a working area. “A travel chart is a tabular record for presenting quantitative data about the workers materials or equipment between any numbers of places over any given period of time.” Application Several worker working on one machine. One worker working on several machines. Several workers working on several machines.

TO Store Punching Trimming Shining Packaging Total FROM Store Punching 500 pieces 400 pieces 200 pieces Store 1100 Punching 50 pieces 50 pieces 100 Trimming 100 pieces 100 Shining 20 pieces 20 Packaging Each bigger square represents work station. Along the top, squares towards right denotes the stations to which travel happens and down the left hand denotes from where movement is made. Construction of Travel chart Firstly, a big square (divided in small squares) is drawn. A diagonal line is drawn from top left to bottom right square.

REL Chart: REL chart stands for relationship charts REL Chart: REL chart stands for relationship charts. These relationship charts records heavy movement between two work centres. It combines qualitative and quantitative aspect to decide about the layout. Construction : Name all the departments on the relationship chart. Outline the basis of determining closeness of relationship between departments. Give rating or code for the relationship.

Rating Meaning A Absolutely necessary E Especially important I Ordinary closeness U Unimportant X Undesirable Rating Reason 1 High use 2 Medium use 3 Low use 4 High flow 5 Medium flow 6 Low flow As in the example it is most important that The Store and The Punching operation are Close to one Another since the greatest number of journeys are made between these two stations. Store Punching Trimming Shining Packaging 5 4 O A U 1

Assembly line balancing Product layout : Assembly line balancing Under product layout all the production resources such as men, material and machine are arranged in a line or a sequence. The raw materials move from one work station to another till it is converted into finished goods. Designing a product layout requires sequence of operations to be determined, assessment of speed to analyse volume of work done so that all work stations get equal work load. This whole process is called assembly line balancing.

Important Terms Activity - Specific task or job. Event - Instant of time when an activity starts or ends. Network - Graphical representation of activity. Tail and Head Event - When an activity starts and; when an activity ends. NODE HEAD EVENT A 3 TAIL EVENT

Successor activity Predecessor activity activity 5) Activities: Predecessor activity – Activities that must be accomplished before other activities. Successor activity - One which starts immediately after completion of other activity. Concurrent activity - Activities which can be performed simultaneously. Successor activity D A B Predecessor activity C Concurrent activity

A B C E G H I D F Task Predecessor TIME(minutes) A _ .3 B .6 C .4 D 1.2 Task Predecessor TIME (minutes) E C .2 F D .6 G .1 H F,G .5 I .3 A B C E G H I D F

A F C G D I H B E Cycle time = Operating time Output required = 440 .6 C .4 G .1 D 1.2 I .3 H .5 A B E .2 Output : 275 units/day Operating time : 440 min/day IDLE TIIME = 0.6 minutes W/S # 1 1.6min. W/S # 2 1.6min. W/S # 3 1.6min. Minimum number = of workstations Total time Cycle time Cycle time = Operating time Output required Idle time B .6 1.0 D 1.2 0.4 F .6 1.0 H .5 0.5 A .3 0.7 = 4.2 min/unit 1.6 min/unit = 2.6 workstations 0.4 = 440 275 = 1.6 min/unit I .3 0.2 C .4 0.3 = 3 workstations 0.2 E .2 0.1 G .1 0.0

Improvement softwares 2. Computer based methods Computer based layout planning methods are used in modern world to solve various process layout issues. These methods are divided into two categories i.e. Construction programs and improvement programs. Improvement softwares CRAFT Construction softwares ALDEP CORELAP

1. Construction softwares : The softwares helps in designing a layout from the very beginning is called construction programs. ALDEP: ALDEP is developed by IBM to solve issues created while constructing relationship charts. ALDEP stands for automated layout design program. STEPS: It randomly selects first department. If more than one department has similar relationship, it can choose any It positions departments on upper left corner and start laying out departments downwards and then left to right continue laying bottom up and left and right

CORELAP : It means computerised relationship layout planning and is one step forward to ALDEP Software. The software creates best layout on the basis of total closeness rating Improvement Softwares : These softwares begin with an initial layout and make improvement through additional changes. More the number of departments, layout design may be in millions and trillions. Programs like ALDEP and CORELAP are used in these circumstances. The most popular software to improve layout design is CRAFT. CRAFT: It stands for Computerised Relative Allocation Of Facilities Techniques. The software requires basic travel chart and load distance score to start its operations. Features : It compares two adjacent departments and exchange them in layout pair wise. It tries to reduce the overall cost. Generally it can handle up to 40 departments.

Calculate centre point and rectilinear distance of all departments. Steps Calculate centre point and rectilinear distance of all departments. Find the cost of initial layout by multiplying the material flow, unit cost and distance i.e. F×C×D= TOTAL COST Improve the layout by interchanging adjacent departments till a least total cost layout is found. A B C D A B C D -- 15 10 50 -- 20 5 -- -- 10 FLOW DATA Rectilinear Distance Centroid A (5,15) D (35,5) C (15,5) B (25,15) 0 10 30 40 20 10 INITIAL LAYOUT Distance: A to B 20 units = |25-5|+|15-15| A to D 40 units =|35-5|+|5-15| B to D 20 units =|35-25|+|5-15| C to D 20 units =|35-15|+|5-5| Total movement cost = (20x15)+(20x10)+(40x50)+(20x20)+(20X5)+(20x10) = 3200

Reduction in movement cost= 3200-1650=1550 A B C D A B C D -- 15 10 50 -- 20 5 -- -- 10 FLOW DATA A (35,15) D (35,5) C (15,5) B (15,15) 0 30 40 20 10 Total movement cost =(20x15)+(30x10)+(10x50)+(10x20) +(30X5)+(20x10) = 1650 A (5,15) D (35,5) C (15,5) B (25,15) 0 10 30 40 20 10 INITIAL LAYOUT Distance: A to B 20 units = |35-15|+|15-15| A to D 10 units =|35-35|+|5-15| B to D 30 units =|15-35|+|15-5| C to D 20 units =|35-15|+|5-5| Reduction in movement cost= 3200-1650=1550