CEESA 2nd consortium meeting

Slides:



Advertisements
Similar presentations
STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2,
Advertisements

9 November 2007 Cecilia de la Rosa Head of the Internal Quality Unit How to prepare for an external review Current trends in the European Quality Assurance.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
WP4 – Task 4.4 LCA Activities
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Aims Develop a methodology to study the impacts of low consequences/high probability events Apply this methodology to the implications of a 5-6 metre.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
Preparation of the Body. In this key area you will investigate the specific fitness demands of activities. You will learn about: 1.Types of fitness, this.
E-Manifest RFI Industry Day Introduction and Background February 7,
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
WP 6 Dorota Pawlucka Progress Meeting Amersfoort,
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Introduction to the IPA WWRO Support Project By Graham Cleverly:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Fostering Geometric Thinking Facilitators’ Institute minutes until we begin!
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
Assistant Principal Meeting August 28, :00am to 12:00pm.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Organising Meetings >>> Identifying the need for a meeting Planning a meeting Arranging a meeting Topic 1 Topic 2 Topic 3.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
1/15 ea technology Delivering your energy solutions MicroCHeaP: Month 6 meeting, Potsdam Work Package 2 - Progress Update 4 th April 2005 Presented by.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Agenda Friday (Summary) Slot 1: Education Area meeting [30min] Status of deliverables [15 min] Any other business [15 min] Slot 1+2: WP3.1 / WP 3.2 (educational.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
1 Progress of WP5 & Task Allocation SECOND MEETING OF THE THEMATIC WORKING GROUPS Thursday, 4 May 2005, Athens, Greece Presentation prepared by: Dr S Thomopoulos.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
29 January 2010 Initial Training Session for Enterprise Europe Network Members in India AGENDA Date: January 2013.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
CEESA Coherent Energy and Environmental System Analysis Senior Research Specialist Poul Erik Morthorst Risø National Laboratory The Technical University.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
CIGRE TF C5-2-1: Classification of Electricity Markets Worldwide
Meeting #2 Superintendent Torlakson’s Advisory Task Force on Accountability and Continuous Improvement 1 11/10/2015.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Fostering Geometric Thinking Facilitators’ Institute July 31 – August 4, 2006 EDC Newton, MA.
Steering group -meeting in The 1st meeting of the steering group will be held in the premises of the project coordinator in Tampere. During.
Manfred Horr, Project Coordinator Head of Section Economic Policy and Private Sector Development German Technical Cooperation (GTZ) Kick-off workshop,
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
12 th General Assembly Meeting Joint Programming Initiative „More Years, Better Lives ” Rome 18 th November 2014.
CORPORATE PROCUREMENT PLAN - Suggested Structure and Content.
1 Visiting the IVT PhD candidates Oct-Nov 2012 From faculty adm: Vice Dean Research, Section head Research, Senior officer PhD. From the departments: totaly.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
Stakeholders’ Perspective on Integration Gabi Lombardo PhD Net4Society Advisory Board.
Renewable and Nonrenewable Energy Advantages and Disadvantages.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
AMICI WP1 – Management, coordination and dissemination
Clarifying Roles of Leaders New Committee Chairs
E-Learning Advisory Group Workshop
COMMENTS FROM INT. ADV. PANEL (IAP)
Assessment for Learning
WP2 Status: Proposal for transport scenarios (100 percent RES)
Trilateral Research EUROPEAN COMMISSION
Management Roles When planning, a manager is generally considering the strategies and direction of the organisation. They evaluate and review past results,
Governance and leadership roles for equality and diversity in Colleges
Developing energy consumption data to meet users needs
JRC’s Follow-up work to improve GES assessment
Dr. Drini Imami Agricultural University of Tirana
AMICI WP1 – Management, coordination and dissemination
Connecticut Core Standards for Mathematics
Welcome to the Your course title here Advisory Committee Meeting
A High Intensity Neutrino Oscillation Facility in Europe
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
OPTIMA INCO-MPC Management Board Meeting, April 1/2 2005, Izmir
Presentation transcript:

CEESA 2nd consortium meeting 28-29 August 2007 at Gl. Vrå Slot Welcome Henrik Lund

Welcome Participants presentation Practical details Status on contract and paper works Invitation to 1. SMV-project, 2. Regionerne and 3. PhD-project Short introduction to the project Main objectives of this meeting

Organisation Leader, WP leaders and administrative project manager: Collection and compilation of all project deliverables. Management board (one representative for each partner+leader+APM): Monitoring and supervision, progress reports and all legal aspects. Consortium: all (annual meetings) International Advisory Panel: Participate in three consortium meetings.

Meetings ”Start-up” meeting in January 2007 1. Consortium-meeting: Presentation of state-of-the-art scenarios. Including IAP (Internationale Advisory Panel): August 2007 2. Consortium-meeting summer 2008 without IAP (with?) 3. Consortium-meeting summer 2009 with IAP 4. Consoritum-meeting summer 2010 with/without IAP ? Closing seminar, ultimo 2010: Dissemination (IAP?)

Main Objectives first half year Identify relevant 100% RES scenarios to present for discussion at the first consortium meeting: Energy System Analyses Life Cycle Assessment (LCA) Find and employ 4/5 PhDs Define International Advisory Panel

Main Objectives of this meeting Status on the work in each WP Discuss scenario-framework for the project including the role of each WP in the work to come Decide on time and content of next consortium meeting

Agenda Tomorrow: Today: Welcome Breakfast WP1 (and WP5) WP4 (Market) Lunch WP2 (Transport and Biomass) Coffee WP3 (Electric Power) Dinner Tomorrow: Breakfast WP4 (Market) IAP comments Lunch Discussions Goodbye

Minutes WP-leader/chairman prepare short minutes from each session Mette prepare minuttes from discussion and welcome Remember www.CEESA.dk

Energy System Analysis of three 100% RES scenarios CEESA 2nd consortium meeting 28-29 August 2007 at Gl. Vrå Slot Energy System Analysis of three 100% RES scenarios Henrik Lund

100% RES Scenarios

Based on IDA Energy PLAN

Discussion in WP group Demand (from the CEESA January meeting) ? How many scenarios? WP1 suggest: 3 scenarios: Biomass Wind High Demand

How to understamd the scenarios Framework (to be adjusted during the coming 3-4 years) The scenarios is not optimised yet LCA should be incorporated (WP1 – WP5) External markets (WP4) Transport alternatives (WP2) Electricity System (WP3)