Schedule CM SPS G.Vandoni.

Slides:



Advertisements
Similar presentations
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Advertisements

Concrete Pre Cast Panel By Peter Spence ID:
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
ESS Cryogenic System Design
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Transport and handling at CERN for FAIR
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
The four basic types of structures are :
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
Installation of the T600 at Fermilab CSN2, September 22,
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
ICARUS Collaboration Meeting Dec A. Scaramelli.
TE-CRG Activities D. Delikaris, TE-CRG.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Kitakami Side AHCAL Assembly or anywhere in any detector.
Crab Cavity Technical Coordination meeting:
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
CC LLRF SM18 test plan and BA6 infrastructure
CBM magnet overview of the BINP work
Cryomodule test stand at ESS site
Crab cavities Cryogenics progress for the SPS
CLIC Handling Engineering Update
IT-4189 Supply and installation of a cryogenic distribution system
RF Layout 3pi/2 for Discussion
SX1 manipulation VERSION 1 Version
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
BA6 – crab cavity activities in EYETS
Experimental hall design in Japanese site
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
Cryoplant Installation Scope
Racks in BA6 SPS test stand Integration 5 October 2017.
INSTALLATION SEQUENCE
SPS cryogenic proximity equipment and SM18 validation
TENDERING PROCEDURE IT-3981/EN
SR1 cleanroom extension
IT-4328: Technical Specification
UK RFD Pre-Series cryomodule
USA-15 Compressor displacement for maintenance
Outline CH1.Introduction CH2.Preliminary Design CH3.3D Model.
DESIGN OF TRUSS ROOF Chapter 7
CMS Gantry for Detector Lowering
RDR Baseline Layouts for Interaction Region
Installation Binder / IRR – an example
Chapter 13 Concrete Form Design.
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Schedule CM SPS G.Vandoni

BA6 layout and crab-cavity zone

BA6 – surface equipment

BA6 – cryogenic compressor installation

BA6 layout Generic infrastructure In the zone between crab cavities equipment and lift, we will have pipework with their own support from underground (pipework) and cable trays attached to the existing structures. SMB advises to attach cable trays and pipework to the pillars or support from the concrete slab to be ok. If supporting is from the beams, then structural safety is not guaranteed. No additional load should be added to the beams. Compressor and ancillaries, cryogenics The compressor and ancillaries are part of a mobile refrigerator. Mobile, means we may need to transport it elsewhere from times to time. For the moment we don’t know if we can use the crane (because of height of the compressor below hook) for handling. We may need to use rollers. 6tons+ the weight of the skids, so 9tons, leading to 4.5tons per axis of rollers. If rollers are to be used, we will need to reinforce the flooring along the installation path. Or to distribute the load by using a steel plate. Distributing the load, we may get to 10kN/m2, then it’s fine. This depends on transport. Because installation will be repeated several times, reinforcement by probs is excluded and pillars are retained. For transport by rolling, we will substitute all wooden panels by metallic sheets along the installation path. For static support, we would put 1 prop (column) under each foot. One prop can take 2tons. Then, it’s just a matter of integration and positioning depending on cable trays or services in place. The Invitation to Tender is in exam with HSE. The IT should go to the Spec Committee on the 1st July.

BA6 layout RF Power and rack. We know the structures, identical to those in BA3 SPS. The best solution is to put a column under each foot, maybe a frame. We can position the equipment such that the feet do not fall where there are beams. We have 1 column every 2.5m, but we don’t need to put the new equipment exactly on top of one column. F.Galleazzi thinks we need a support structure, to have distribution of load. Do the RF amplifiers come with feet? Or with a skid? We should give the information to HSE and SMB. The racks will be partially filled up with equipment. Need for reinforcement? Possible, but we need to know which ones are reused. We can imagine that once filled, they make 500kg. The request should be posted with the same calendar as all the rest (see below). Faraday cage Like for Linac4, where however the FC was directly installed on the concrete slab because the false floor is shallow (30-40cm above the slab). Here, we have nearly 1m, so some supporting skid is required. We would remove cable trays over the surface needed: these are essentially empty in the zone reserved for the FC. The FC for Linac4 was directly designed by P.Baudrenghien, final client. Here, we should meet with PB, Alejandro Selles, F.Galleazzi and S.Mehanneche, to get more details and propose a solution.

Calendar Deadline is 15th August for definition of the support and start the study on that date. This date gives SMB 3 weeks before the TS of September, when they will take a look to the reality in BA6. 5 packages before 15th August: Compressor installation path Compressor static position RF power stations Faraday cage Racks

Cryogenics components weights & dimensions AL Cryoplant 5,500 kg 500 kg In BA6: 2 large items, the CP and the ORS(+GMP). Both suppliers approx. same weight. Plus iso-frame skid weight, 3ton±1ton. So in total 2 skids, from 3.5tons to 9.5tons. See next slide for more information. Linde Cryoplant

(Mobile) Cryogenic compressor and ancillaries Offers opened not earlier than 15th September. From the Invitation to Tender, we know that: As the supply shall be a mobile installation, the equipment making up the compressor station is to be assembled and delivered on removable skids, of the type of iso-frame (dimensions to be found in § 4.3.1), to ease up the mounting and dismounting of the whole installation. The following grouping is proposed by CERN for the conforming bid: One common skid for the screw compressor with its motor and dedicated oil storage tank with helium cooler, oil cooler, oil pumps and oil filters for the single compression stage, as well as its main electric cabinet and its main control cabinet; One common skid for the final oil removal system (ORS – see § 4.9), the gas management panel (GMP), the line dryer, the Interfaces & Utilities Panel (to be defined in § 4.3.2) and the purge group. The bidder […] may offer as a variant a different grouping of the skids if he can demonstrate its advantage, in particular in terms of dismounting/remounting durations. […] The layout of the compressor station shall comply with the requirements of § 4.1. In particular, skids are to be of iso-frame, of maximum dimensions [Length (6.10 m) x Width (2.43 m) x Height (2.60 m)].

(Mobile) Cryogenic compressor and ancillaries From the Invitation to Tender (continues): 4.3.1 Building interfaces The whole compressor station will be installed in the surface building 873 (SPS-BA6) located on CERN Meyrin site in Swiss territory, as described below in Figure 2. Figure 2: Surface layout principle in building 873 – SPS BA6

(Mobile) Cryogenic compressor and ancillaries From the Invitation to Tender (continues and end): The installation conditions in the building 873 are as follows in Table 2: In accordance with the dimensions given by the contractor, CERN will adapt floor interface to meet the maximum weight of the final supplied mounted skids.

BA6 news RF power Rack: 500kg IOT unit: 2000kg

BA6 news LLRF Rack: 500kg Faraday cage: not self supporting