Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
2008 Transmission Expansion Plan Updates Tom Seeley, E.ON U.S.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Midwest Energy, Inc. Transmission Planning and Expansion
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Kick Off Meeting.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Electric Utility Master Plan Update
35kV Assessment SWEDE 2007 May 10, 2007.
Local Area Planning Update to TRANSAC – June 29, 2017
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Yale Runback Local Area Protection Scheme
Montpelier & Powder River 5-year Studies
Crescent City Study Kickoff
Presentation transcript:

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Findings Reports Kickoff Studies Study Areas for 2016 Findings Reports Kickoff Studies

Grace Study Findings AREA PLANNER: Prepared by:

System Overview Covers 1,030 square miles Main Sources are Grace and 3 Mile Knoll, contributions from Treasureton 26 substations, 14 being customer owned Area has 161, 138 and 46 kV lines There are 14 transmission lines in/out of the area Bancroft Conda Soda Springs McCammon Lava Hot Springs Grace Arimo

Load Growth Base System Loads Growth: Projected System Loads Summer 2016: 276 MW (Industrial 80%) Winter 2016-17: 271 MW Growth: Average Summer Percentage 1.1% Average Winter Percentage 1.5% Projected System Loads Summer 2020: 289 MW Winter 2020-21: 288 MW Distribution capacity: 72 MVA Area Utilization Factor: 28%

N-0 Conditions – Replace CB’s Grace Plant Replace CB’s, 2018 CB 123 will be loaded to 132 % (3 ᶲ rating, continuous 800 Amp, 10.5 kA) CB 126 will be loaded to 132 % (3 ᶲ rating, continuous 1200 Amp, 10.5 kA) Solution: Increase both CB’s with 2000 Amp (continuous) 40 kA (interrupting) Estimated cost: $0.9m

N-0 Conditions – Replace CB’s Bancroft Replace CB’s, 2018 CB 12 will be loaded to 108 % (1 ᶲ rating, continuous 100 Amp, 2 kA) Solution: Increase both CB with at least 6 kA (interrupting) rating. Estimated cost: $100k

N-0 Conditions – Upgrade Switch Arimo Upgrade Switch, This switch lacks the full load break and line dropping capability Solution: Upgrade switch 5A at Arimo to a LO/LD capability Estimated cost: $75k

N-0 Conditions – Upgrade Switch Trail Junction Upgrade Switch, This switch lacks the full load break and line dropping capability Solution: Upgrade switch 61A at Trail Junction to a LO/LD capability Estimated cost: $75k

N-0 Conditions – Upgrade Switch Lund Tap Upgrade Switch, 42A switch at Lund Tap lacks the full load break and line dropping capability Solution: Upgrade switch 42A at Lund Tap to a LO/LD capability Estimated cost: $75k

There were no prominent N-1 conditions

Total Construction Costs Construction Item 2016 CONSTRUCTION Cost Investigate the loading discrepancy at Cove substation O&M Subtotal $0.0 2018 CONSTRUCTION Grace Plant ~ Replace CB 123 and CB 126 $900k Bancroft ~ Replace CB 12 $100k $1.0m Reliability Work Plan Projects Arimo ~ Upgrade switch to LO/LD $75k Trail Junction ~ Upgrade switch to LO/LD Lund Tap ~ Upgrade switch to LO/LD $225k TOTAL COST $1.225m

Any questions or comments?

Smithfield/Preston Study Findings AREA PLANNER: Prepared by:

System Overview Covers 450 square miles Main Sources are Treasureton, Wheelon and Bridgerland Generation: Oneida, Preston, Mink Creek and 2 customer 23 substations, 3 being customer owned Area has 230, 138 and 46 kV lines

Load Growth Base System Loads Growth: Projected System Loads Summer 2015: 238 MVA Winter 2015-16: 161 MVA Growth: Average Summer Percentage 2.0% Average Winter Percentage 2.0% Projected System Loads Summer 2020: 279 MVA Winter 2019-20: 199 MVA Distribution capacity: 180 MVA Area Utilization Factor: 79%

N-0 Conditions – Low Voltage Franklin Change No-Load Tap There is 35 miles of 1/0 and 3/0 ACSR conductor that causes voltage drop between Franklin and Downey Solution: Change the no-load tap at Franklin to tap #4 (134.5 kV) on the 46 kV system and install a 1.2 Mvar capacitor bank on 12.47 kV Downey system Estimated cost: O&M

N-0 Conditions – Bypass Hyrum Bus East Hyrum Bypass Conductor bus size is 7-#2 Cu will load to 114% (18 MVA) Solution: Connect the Hyrum City line to the western Nibley-East Hyrum line (capacity is 25 MVA) Estimated cost: $30k

N-0 Conditions – Increase Capacity Lewiston Upgrade, 2018 Lewiston transformer loads to 101% (14 MVA) Solution: Install a 22.4 MVA transformer spare equipped with an LTC Estimated cost: $700k

N-1 Conditions - Disable Auto Throwover Richmond Auto –Throwover, 2018 The loss of Franklin 138-46 kV transformer will cause Smithfield transformer to load to 106% (33 MVA), with the auto-throwover scheme on Solution: Disable the Richmond auto-throwover during the summer to prevent overload Estimated cost: N/A

N-0 Conditions – Install Cap Bank Downey Install Cap Bank, 2019 Low voltage happens on the line between Franklin and Downey substations Solution: Along with the change of the no-load tap at Franklin, a 1.2 Mvar capacitor bank installed at Downey Estimated cost: $200k

N-0 Conditions – Install Fans Weston Install Fans In summer 2013, transformer loaded to 95% of its rating (3.75 MVA). The peaks have gone down but the capacity should be raised. Solution: Install additional fans on the Weston transformer fins, to increase the rating Estimated cost: $15k

N-0 Conditions – Replace CB Green Canyon Replace CB CB L33 will be loaded to 113% (3 ᶲ rating, continuous 600 Amp, 6.3 kA) Solution: Increase CB L33 with 2000 Amp (continuous) 40 kA (interrupting) Estimated cost: $640k

N-0 Conditions – Replace CB’s Treasureton Replace CB’s CB L101 & CB L102 will be loaded to 115% (1 ᶲ rating, continuous 1600 Amp, 18 kA) & 99% (1 ᶲ rating, continuous 1200 Amp, 21 kA) Solution: Increase both CB with higher fault duties to prevent circuit breakers from failing Estimated cost: $1.3m

N-0 Conditions – Upgrade Switches Lewiston Upgrade Switches 41A & 42A switches at Lewiston lacks the full load break and line dropping capability Solution: Upgrade switch 41A & 42A at Lewiston to a LO/LD capability Estimated cost: $100k

There were no prominent N-1 conditions

Total Construction Costs Franklin ~ Low Voltage: change no-load tap O&M East Hyrum ~ Connect Hyrum City feed to Nibley-East Hyrum line $30k Subtotal 2018 CONSTRUCTION Lewiston ~ Increase Capacity $700k Richmond ~ Disable the auto-throwover during summers 2019 CONSTRUCTION Downey ~ Install 12.47 kV 1.2 Mvar capacitor bank $200k NO TIMELINE CONSTRUCTION Weston ~ Install additional fans $15k Green Canyon ~ Replace CB L33 $640k Treasureton ~ Replace CB’s L101 and CB L102 $1.3m Lewiston ~ Install LO/LD switches in place of 41A and 42A $100k $2.06m TOTAL COST $2.985m

Any questions or comments?

Price (Utah) Study Findings AREA PLANNER: Prepared by:

System Overview Covers 5,200 square miles Main Sources are Huntington and Hunter (Emery), contributions from Sunnyside gen Approximately 60 substations, 31 being customer owned Area has 345, 138, 69 and 46 kV lines

Load Growth Base System Loads Growth: Projected System Loads Summer 2015: 130 MW (Industrial 66%) Winter 2015-16: 131 MW Growth: Average Summer Percentage 1.3% Average Winter Percentage 1.1% Projected System Loads Summer 2020: 149 MW Winter 2020-21: 146 MW Distribution capacity: 107 MVA Area Utilization Factor: 50%

N-0 Conditions – Increase Capacity XFMR name Upgrade, 2017 Spanish Fork XFMR at 108% ( MVA Rating) Install a MVA pole mount substation (North Arm) Scofield Reservoir Scofield Reservoir Estimated cost: $200k

N-1 Conditions – Install Breakers Helper Install Circuit Breakers, 2018 Loss of the Carbon-Helper 138 kV line results in overloading between Price City Tap and Mill Creek Tap 46 kV line to 116% (36 MVA, emergency) Also, results in low voltage on the 46 kV system being served by Helper Solution: Place breakers on the second Carbon-Helper 138 kV line, which is normally open producing a second feed to the area. Estimated cost: $8.3m

There were no prominent N-1 conditions

Total Construction Costs Construction Item 2017 CONSTRUCTION Cost Scofield Reservoir ~ Increase capacity $200k Subtotal 2018 CONSTRUCTION Helper Substation ~ Install new 138 kV yard with Circuit Breakers $8.3m TOTAL COST $8.5m

Any questions or comments?

Study Areas for 2016 Kickoff Studies

Lakeside is to the North Tooele (Utah) Study Service Area Lakeside is to the North Dividing line is the Tooele county border Terminal & Oquirrh are the main sources for the area

Tooele (Utah) Study Info Covers 800 square miles in Tooele county. 2 sources – Terminal & Oquirrh serving 4 -138 kV lines. Approximately 32 substations, 14 are customer owned 1 Alt. (46 kV) Source at Terminal Transmission voltages 46 & 138 kV

Any questions or comments?

Southeast Utah Study Service Area Area is located in Grand and San Juan counties Pinto (via 345 kV Huntington to Four Corners), Abajo & Moab are the main sources for the area Dividing lines are counties lines & the Utah border

Southeast Utah Study Info Covers 6,500 square miles in Grand & San Juan counties Serves NTUA loads (Navajo Tribal Utility Authority) Approximately 31 substations, 14 are customer owned Transmission voltages 46, 69, 138 & 345 kV Study will concentrate mainly on the 138 kV system & below

Any questions or comments?

North Salt Lake Study Service Area Dividing line is North Temple to the South & Farmington to the North. 3 - 138 kV lines origination at Terminal 46 kV sources at Parrish, Gadsby & Jordan subs.

North Salt Lake Study Info Covers 67 square miles in southern part of Davis & north part of Salt Lake County Main sources are Terminal, Parrish, Gadsby & Jordan. Major sources include 3 - 138 kV lines originating from Terminal. Municipalities: Kaysville City & Bountiful City Approximately 29 substations, 12 are customer owned Transmission voltages 46 & 138 kV

Any questions or comments?