LEPELLE NORTHERN WATER BOARD ANNUAL REPORT 2015/16 & DWS INTERVENTION PROJECTS 24 FEBRUARY 2017.

Slides:



Advertisements
Similar presentations
1 Republic of Macedonia-ESM EVN Income statement For the year ended 31 December _____ Note Current year Previous year Revenues Electricity revenues Other.
Advertisements

LIMPOPO EXPENDITURE REPORT FOR PERIOD ENDING 31 MARCH 2015 SELECT COMMITTEE ON FINANCE CAPE TOWN JUNE
TOWN OF SULLIVAN'S ISLAND, SOUTH CAROLINA OVERVIEW OF AUDITED FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2008.
Click to edit Master subtitle style 5/10/10 NAMAKWA WATER BOARD ANNUAL REPORT 2009.
SOUTH AFRICAN DIAMOND AND PRECIOUS METALS REGULATOR (SADPMR)
NAMAKWA WATER BOARD ANNUAL REPORT BACKGROUND The Namakwa Water Board provides potable water to Nama Khoi Municipality & De Beers Namaqualand Mines.
Click to edit Master subtitle style 5/10/10 Botshelo Water 2008/2009 Annual Report Presentation to Portfolio Committee on Water and Environmental Affairs.
Lecture 28. Chapter 17 Understanding the Principles of Accounting.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
MHLATHUZE WATER PRESENTATION OF THE 2006/2007 ANNUAL REPORT TO THE PORTFOLIO COMMITTEE Presented by: Ms Dudu Myeni (Chairperson) Mr Lawrence Nachito (General.
DEPARTMENT OF ENERGY PCE PRESENTATION ON THE DEPARTMENT’S 2012/13 ANNUAL FINANCIAL STATEMENTS Ms Yvonne Chetty Chief Financial Officer 1.
Module 5 The Use Of The Annual Report As An Oversight Tool APAC MPAC Training Rollout 2012.
Presentation by Ms Z Mathe Chief Director: Water Trading Entity January 2011 Presentation to the Portfolio Committee: Water & Environment Financial.
Click to edit Master subtitle style 4/20/12 Annual Financial Statements 2011/12 Action plan Presentation to Portfolio Committee April 2012 Cape Town.
Briefing by the AGSA on key issues and concerns regarding the audit of the Department of Labour (DOL) For the year ended 31 March September 2010.
Annual Financial Statements Briefing to Portfolio Committee Parliament of the Republic of SA 24 October 2012.
Annual Financial Statements Briefing to Portfolio Committee Parliament of the Republic of SA 11 October 2011.
1 BOTSHELO WATER 2007/08 Annual Report. 2 Contents 1. Overview 2.Provision of Water Services /08 AFS 4. Intervention – Organisational Diagnosis.
Presentation to the Portfolio Committee: Water and Environmental Affairs Presentation by Department of Water Affairs 30 – 31 March 2011 Budget allocation.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing the Portfolio Committee on Water and Sanitation on Interventions to improve water.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Annual report for the 2014/15 financial year Magalies Water.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Annual report for the 2014/15 financial year Presented by: Overberg Water.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
F Designed to give you the knowledge and application of: Section C: Financial Statements C1. Statements of cash flows C2. Tangible non-current.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Annual report for the 2014/15 financial year Presented by: Cyril Gamede Chief Executive.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
Presentation to the AGM 2010/11 Annual Accounts Eifion Williams Director of Finance 27 th September
Accounting and Financial Decisions
PRESENTATION TO PORTFOLIO COMMITTEE ON Briefing by Lepelle Northern Water Board on its 2015/16 Annual Report 30 MAY 2017.
Analyzing Financial Statements
Annual report for the 2015/16 financial year
Interpreting and using financial information
Chapter 4 Cash flows Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Business Accounting and Finance in NZ by Clark, Maguire and Davies Slides.
Annual report for the 2014/15 financial year
Type your topic here Electoral Commission
Briefing on Current Expenditure and their Performance Trends
An Overview of Financial Performance
Finance & Human Resources
Chapter 9 Financial Statements.
DEPARTMENT OF WATER AFFAIRS & FORESTRY
PARLIAMENT OF THE REPUBLIC OF SOUTH AFRICA
BRIEFING THE PORTFOLIO COMMITTEE ON WATER AND SANITATION
Trust Board Finance Director’s Update: Month 8 – November 2017
2016/17 DRDLR Annual Financial Statement Presentation
Trust Board Finance Director’s Update: Month 9 – December 2017
LEPELLE NORTHERN WATER BOARD ANNUAL REPORT 2016/17
Briefing on the Annual Report for the 2015/16 Financial Year
AgriSeta AFS for the year ended 31 March 2011
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Idyllwild Water District
Annual Report no. 8 July 2005 – June 2006
for the year ended 31 December 2016
Economic Development Department Annual Financial Statements 2011/12
STANDING COMMITTEE ON APPROPRIATIONS
Agriseta AFS for the year ended 31 March 2010
PRESENTATION TO THE SELECT COMMITTEE ON ECONOMICS AND BUSINESS DEVELOPMENT SUPPORTED EMPLOYMENT ENTERPRISES (SEE) PERFORMANCE PROGRESS FOR 2015 & PERFORMANCE.
PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATION
Presentation to the Select committee On labour & Public enterprises
MPUMALANGA 4TH QUARTER EIG PERFOMANCE
Presentation to the Portfolio Committee: Water & Environmental Affairs
LEPELLE NORTHERN WATER BOARD ANNUAL REPORT 2017/18
THE DEVELOPMENT AND STRUCTURE OF INDICATORS FOR FINANCIAL REPORTING DASHBOARDS ] mSCOA Vendor Forum: 18.
PRESENTATION TO SELECT COMMITTEE ON ECONOMIC DEVELOPMENT OF DMR 2011 / 12 ANNUAL REPORT 28 NOVEMBER 2012.
Overberg Water Board Annual Report 2015/16 Financial year
LEPELLE NORTHERN WATER
Accounting for Assets Cash Flows.
Trust Board Finance Director’s Update: Month 10 – January 2018
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

LEPELLE NORTHERN WATER BOARD ANNUAL REPORT 2015/16 & DWS INTERVENTION PROJECTS 24 FEBRUARY 2017

Contents DWS INTERVENTION PROJECTS Water supply interventions in Giyani & Nandoni Water supply interventions in Tzaneen Wards ANNUAL REPORT 2015/16 Part 1: Overview of financial performance Part 2: Overview of non-financial performance

DWS INTERVENTION PROJECTS Water supply interventions in Giyani & Nandoni

APPROACH TO MOPANI INTERVENTION Water supply interventions in Giyani & Nandoni APPROACH TO MOPANI INTERVENTION The interventions was categorised and prioritised as follows: Critical/short - term emergency projects milestone Medium/long – term emergency projects milestone Other projects milestones

Water supply interventions in Giyani & Nandoni MOPANI CRITICAL/SHORT-TERM PROJECT MILESTONES   ALL EMERGENCY WORKS COMPLETED AND TO BE HANDED OVER TO THE RELEVANT AUTHORITIES Project Status 16 Priority Villages Groundwater Augmentation Completed Nkhensani Hospital Groundwater Augmentation Giyani WWTW 1.5Ml/day (package plant) Giyani WWTW (refurb-existing plant) Morogholo Transfer Pumpstation Kremetart Transfer Pumpstation Khanyisa Booster Pumpstation Nsami Water Treatment Plant (Refurb of old plant) Nsami Water Treatment Plant (New) Kremetart High & Low Reservoirs

MOPANI MEDIUM-LONG TERM PROJECT MILESTONES Water supply interventions in Giyani & Nandoni MOPANI MEDIUM-LONG TERM PROJECT MILESTONES Project Summary Scope Construction Progress Completion date Pipeline A Length of 37.9 km (incl branches) 63% 30 June 2017 Pipeline B Length of 81.8 km (incl branches) 78% Pipeline C1 & D1 Length of 11.3 km (incl branches) 98% 30 March 2017 Pipeline C2 & D2 Length 24km (including branches) 10% 31 Dec-2017 Pipeline D outline Length of 107.7 km (incl branches) 73% Pipeline F1 Length of 45.3 km (incl branches) 54% 30 September 2017 Pipeline F2 Length of 21.8 km (incl branches) 80%

MOPANI MEDIUM-LONG TERM PROJECT MILESTONES Water supply interventions in Giyani & Nandoni MOPANI MEDIUM-LONG TERM PROJECT MILESTONES Project Summary scope Design Progress Construction progress Completion date Giyani Village Reticulations design Feasibility study, Planning, detail designs, finalize designs, permits and procurement. 100% The construction to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor.   To be confirmed upon finalization of the Contracts New (Biological Nutrient Removal) BNR plant Construction of the new 14ML/d BNR plant. Phase 1 (Movable 1.5Ml/d Package plant completed). Phase 2 construction to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor To be confirmed upon contract finalization Nandoni WTW upgrade Upgrading of the existing WTW Construction work to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor To be confirmed upon contract finalization Command Reservoir – Giyani Construction of 35ML reservoir Construction work to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor Distribution Reservoirs Construction of 50 elevated steel tanks to be connected to the bulk pipelines

OTHER PROJECTS MILESTONES CONT. Water supply interventions in Giyani & Nandoni OTHER PROJECTS MILESTONES CONT. Project Summary scope Design Progress Construction progress Completion date Nandoni – Nsami Bulk pipeline Implementation of bulk pipeline from Nandoni – Giyani 100% Construction in progress – Excavation, removal of the old pipes and installation of new pipes in progress. March 2018 Namakgale WWTW Upgrade of the Namakgale WWTW 60% Engineering designs in progress.  The designs expected to be completed by end March 2017. The construction to commence on confirmation of funds from DWS. Raising of Tzaneen Dam Raising of Tzaneen dam (3m). 90% Removal and stockpiling of material from the dam basin and the blasting of the spillway crest in progress. Removal and stockpiling of the material from the dam basin to be completed by end March 2017. The blasting of the spillway to be completed by July 2017. New Nwamitwa Dam Planning and design new Nwamitwa dam. The construction to commence on completion of the designs, availability of funds and procurement of the Contractor. To be confirmed upon contract finalization Nkambako/ Bambanana Bulk pipeline Implementation of bulk pipeline in Nkambako/ Bambanana The construction to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor. To be confirmed upon contract finalization

OTHER PROJECT MILESTONES Water supply interventions in Giyani & Nandoni OTHER PROJECT MILESTONES Project Summary scope Design Progress Construction progress Completion date Boreholes Revitalization of existing 154 boreholes (with package plants) – Augmentation to the water scheme while the Bulk Pipelines in progress. 100% 95% The electrification of boreholes is required to complete the remaining scope of work. Operations and maintenance support Repairs on existing lines ± 270 km’s Pump stations = 9 Reservoirs = 14 As and when required Ongoing

Water supply interventions in the Wards To address the challenges at 5 wards in Tzaneen, bigger water supply systems are being installed within municipalities inline with master plan as opposed to the small schemes which were currently in use. Noting: For projects implemented by WSA:MDM, their information were requested from MDM to updated the progress but Nkombako/Bambanana bulk pipeline that is Implemented by LNW

Intervention projects done are as follows progress of water supply projects at wards 24, 25, 26, 27 and 34 villages within the Greater Tzaneen Local Municipality Project Summary scope Design Progress Construction progress Anticipated Completion date Responsible Tours bulk water supply(upgrading of tours treatment works Construction of Pre-Treatment works, 1 flocculation channels , 2 clarifiers, 3 rapid gravity sand filters , 1 new clear water tank , 1 new pump station , 1 chlorine room and access road 100% 25% (The implementation is moving forward as per implementation plan) 22  June 2017 WSA: MDM Tours bulk line Upgrading of Tours bulk line 10% 0% Delay was due to technical report approval To be confirmed upon design finalization Thabina bulk water supply Construction of water reticulation in Thabina village 98% 23 December 2016 Close out report to be submitted Lephephane bulk water scheme Refurbishment of 8 eight boreholes, sitting, drilling and equipping of 5 boreholes, construction of a pump station and a clear water tank and bulk pipe line of 17km Ongoing The Contraction is behind schedule due to community strike which resulted in the stopping of the project (Planned program of work was delayed and now revised to March 2017) Nkambako bulk pipeline Extension of the Nkambako bulk pipeline Construction work to commence on confirmation of funds by DWS and Sourcing of Service Provider/ Contractor To be confirmed upon contract finalization Implementing Agent – LNW Intervention projects done are as follows

annual report 2015/16 Part 1: overview of financial performance

FINANCIAL PERFORMANCE FINANCIAL PERFORMANCE FOR THE YEAR ENDED 31 June 2016   Audited Outcome 2015/16 2014/15 Variance R'000 % Revenue Revenue from exchange transactions ( Primary) 459 199 441 549 3% Revenue from non-exchange transactions ( Secondary) 166 265 97 330 41% Expenditure Employee benefit costs 245 360 169 460 31% Operating expenditure 241 031 405 758 69% Fair value adjustments 4 067 3639 10% Finance cost 1 601 1416 11% Depreciation, amortisation and impairment 29 955 28 096 6% Loss on disposal of fixed assets Surplus/(deficit)from operating activities 103 450 69 490 32%

STATEMENT OF FINANCIAL POSITION FOR THE YEAR ENDED 31 JUNE 2016   2016 2015 VARIANCE R'000 % ASSETS Current Assets Cash and cash equivalents 79 996 217 796 1.73% Receivables from exchange transactions 539 768 236 901 56% inventory 6 145 5 371 12% Non-Current Assets Property, Plant and Equipment 648 699 559 886 14% Intangible assets 3 415 4 240 25% Investments 68 228 59310 Total assets 1 346 251 1083 504 19% LIABILITIES Current Liabilities Payables from exchange transactions 281 064 169 741 40% Employee benefits Finance lease liability Financial liabilities: Non-Current Liabilities 65 558 17 584 73% Financial liabilities Total liabilities 346 622 187 325 46% Total net assets NET ASSETS Reserves ( Equity) Accumulated surplus 458 156 0% Pumping cost reserve ( Reserve) 541 473 438 023 20% Net assets ( Equity) 999 629 896 179 11%

Ratios Liquidity The current ratio : 2.4 Cash flow from operations The cash and cash equivalent at the end of the year amounted to R79,9m Return on assets The ratio on return on assets is 12%. This illustrates the entity’s effectiveness in using its investment in assets. Debtor days in sales During the period under review, the debtor days’ analysis reflected an increase to 625 days This is due continuous non-payment by our major customer Other ratios applicable Gross Profit Margin is 53% Debt to equity is 32% Net profit margin is 23%

Expenditure outcome: 31 June 2016 Dashboard as at 31 June 2016 Working days till FY end   Total expenditure to date R 485 156 % Programme (R'000) Budget Expenditure Variance % Spent Administration 64 270 57 205 7 065 11% Water Sector Management Water Infrastructure Management Regional Implementation and Support Water Sector Regulation International Water Cooperation Total Compensation of employees on operating expenses 35% Goods & services on operating expenses 65% Analysis of current payments

Irregular, Unauthorised, fruitless and wasteful expenditure Analysis: No Irregular expenditure reported during the 2015/16 financial year No unauthorized expenditure reported during the 2015/16 financial year No fruitless or wasteful expenditure relating to current year

CONTIGENT LIABILITIES AND ASSETS 2015/16 2014/15 Variance % Variance R'000 Contingent liabilities Total Contingent assets 6553 3853 2700 70% Notes Legal claim : A service Provider was ordered to pay R3.5 plus interest with legal costs to LNW in respect of lost assets within the organization. The board is of the opinion that this claim is probable to be met in full in the near future. Land claim : LNW purchased a farm in 2003 which became a subject of successful land claim . The value of the farm was R2.7m. Land claim Commissioner took possession of the farm in 2005and did not pay any money to LNW . The latter is currently under legal dispute.

Analysis: matters relating the audit report per year 2011/12 2012/13 2013/14 2014/15 2015/16 Qualified (9) Qualified (8) Qualified (3) Qualified (2) Qualified (1) Unqualified Emphasis of matter The accounting authority did not take effective steps to collect all money due to the Lepelle Northern Water, as required in terms of section 51(1)(b)(i) of the PFMA, as 80% of total accounts receivable was provided as doubtful debt.

Trend analysis: Matters relating the audit report

Action plan Major Finding Root Cause Action Lepelle Northern Water had receivables for water sales totalling R410 million at 30 June 2016, of which R328 million had been outstanding for more than 90 days. The recoverability of these amounts is doubtful. Management is encouraged to continue with their concerted efforts to collecting long outstanding debt Non payment by WSA Signing of the settlement agreement with the affected WSA

Explanatory notes PPI no Milestones that were not achieved Comments on deviations 1 Tolerable organisational Residual Risk Certain risks identified during the review required budget and was not available at the point in time but allocated for next financial year. 2 Capital projects DWS did not pay on time the money that was bridge-funded on the directives issued to LNW 3 Debtors day (1102) Mopani’s old debt still a challenges and recently DWS. 4 Compliance to DWS effluent general standards Municipality did not approve the budget that was meant to upgrade some of the wastewater works’ capacity to match the high volumes of the influent. Strategy to overcome under performance PPI no 1 on attendance of planned training : The strategy to overcome under performance will be to develop a pre-selection of institutions to ensure that training works better. PPI no 2 on vacancy rate for engineers and scientists: PPI no 5b on expenditure of departmental budget: PPI no 6 internal audit plan:

THANK YOU