Pilot Project Concept 30-Minute Emergency Response Service (ERS)

Slides:



Advertisements
Similar presentations
Demand Side Working Group April 27 th, © CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED.
Advertisements

11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP.
Proposal to Modify ERS Time Periods 2014 DSWG Goal #10 Presented to: Demand Side Working Group.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
August 7, Market Participant Survey Action Plan Dale Goodman Director, Market Services.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
ERCOT Staff Demand Integration Update to DSWG 3/08/2013 DSWG Meeting.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
TEXAS NODAL: THE BASICS Presentation to ERCOT Technical Advisory Committee Workgroup June 25, 2003.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
ERS Update – DSWG Presentation September 21, 2012.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
14 Minute Ramp Period Testing Workshop June 30, 2009.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
TEXAS NODAL (ERCOT REVISIONS)
ERCOT Bylaws Amendments
TAC Report to the ERCOT Board
Appeal of PRS Rejection of NPRR 667
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERS Procurement Methodology
Paul Wattles, Sai Moorty ERCOT Market Design & Development
The New Texas Wholesale/Retail Market
Market Trials Open Market Participant Call
GMD Data Request NERC Rules of Procedure Section 1600
ERS Update Mark Patterson, ERCOT Demand Side Working Group
Market Pricing Issues: Update
Presentation transcript:

Pilot Project Concept 30-Minute Emergency Response Service (ERS) Mark Patterson, ERCOT Wholesale Market Subcommittee (WMS) May 9, 2012

Creates new Section (k) – Pilot Projects. Background Project No. 40150, PUC Rulemaking Proceeding Concerning an ERCOT Pilot Project: Amends PUC Subst. Rule § 25.361, Electric Reliability Council of Texas (ERCOT). Creates new Section (k) – Pilot Projects. Proposed rule as published would require ERCOT to: Designate which ERCOT rules will be subject to temporary exceptions Estimate costs of the pilot project Estimate completion date for the pilot project Proposal for Adoption expected to be considered by Commissioners at May 18, 2012 Open Meeting. ERCOT staff would seek ERCOT Board of Directors approval of pilot project for 30-Minute Emergency Response Service (ERS) at its June 19, 2012 meeting. May 9, 2012 ERCOT Public

Purpose of 30-Minute ERS Pilot Project Assess the operational benefits and challenges of deploying an ERS product with a 30-minute ramp period. Study the optimal means of deploying 30-Minute ERS within an Energy Emergency Alert (EEA). Gather data to analyze the operation and benefits of a clearing price mechanism. Gather data to assist ERCOT in determining the appropriate price to pay for 30-Minute ERS. Gather data to compare costs and benefits relative to 10-Minute ERS. Determine overall market interest in 30-Minute ERS before making appropriate ERCOT rule changes. May 9, 2012 ERCOT Public

Open to Loads (demand response) only 30-Minute ERS Features Open to Loads (demand response) only 30-minute ramp period following Dispatch Instruction Dispatched as early as EEA Level 1 Procured via market clearing price mechanism Tests will be designed to gain knowledge of fleet-wide Load performance Number of tests will depend on number of EEA events. Maximum of 8 hours of obligation, including tests No renewal Contract Periods 150 MW ceiling on procurement from competitive offers May be exceeded only by self-provided MW Consequence of non-compliance will be financial only No suspensions May 9, 2012 ERCOT Public

30-Minute ERS Additional Information At the end of a deployment event, ERCOT operators will have discretion on whether to recall 30-Minute ERS or 10-Minute ERS first or at same time. ERCOT will procure 30-Minute ERS under the $50 million ERS cost cap. ERCOT will conduct the 30-Minute ERS pilot according to the following schedule: Initial Contract Period: 07/15/12 – 09/30/12 Second Contract Period: 10/01/12 – 01/31/13 Third Contract Period (if necessary): 02/01/13 – 05/31/13 Contract Periods will ensure bridge between pilot and implementation of appropriate ERCOT rules. May 9, 2012 ERCOT Public

Next Steps May 7, 2012 – ERCOT sends out Notice to all Market Participants (MP) to solicit feedback on 30-Minute ERS pilot scope document. May 9, 2012 – Discussion with Wholesale Market Subcommittee (WMS). May 21, 2012 – MP comments due on 30-Minute ERS pilot scope document. June 1, 2012 – Follow-up discussion with DSWG.  June 7, 2012 – Discussion with Technical Advisory Committee (TAC). June 19, 2012 – Anticipated ERCOT Board approval of 30-Minute ERS pilot. May 9, 2012 ERCOT Public

Questions? ON OFF pilotprojects@ercot.com May 9, 2012 ERCOT Public