2K Cold Box PDR Introduction

Slides:



Advertisements
Similar presentations
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Advertisements

11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
Final Design Review (90-100%) Production 1.3 GHz CryoModule Marc Ross, Systems Manager for Cryogenic Systems, LCLS-II May 2015 Fermilab ICB.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
LCLS II FNAL Niobium Pre- Procurement Review - Overview Camille M. Ginsburg, FNAL April 17, 2014.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Installation Package - Electrical
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Cryoplant Installation Organization
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Director’s Progress Review Closeout Meeting
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
Cryogenic Plant Controls – Cost and Schedule
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Process Requirements and Design Approach
Cryogenic Plant Electrical and Controls
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
He Plant, LN2 Systems and Commissioing
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
Cryoplant Installation Overview
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
Electrical and Controls
Mechanical Design and Analysis of LCLS II 2 K Cold Box
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Overview of Mechanical Design
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Cryoplant Controls Readiness to Procure
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Status of the cryogenic system for B180
Testing/Commissioning of 2 K Cold Box
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Process Design
2K Cold Box Mechanical Design
LCLS Linac Technical Design Review Charge
SC1R Cold Box PDR Overview
Welcome, Agenda, Review Charge
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Pressure Piping Analysis
Cryoplant Installation Design Summary
2K Cold Box Cost, Schedule & Staffing
2K Cold Box Cost, Schedule & FDR Summary
ILC Experimental Hall Cryogenics An Overview
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
Instrument PDR Summary of Objectives
Scope, Requirements Deliverables & Schedule
Experimental equipment Edgar L. Black February 17, 2019
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Operator Training Requirements
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
PSS verification and validation
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

2K Cold Box PDR Introduction D. Arenius LCLS-II 2 K Cold Box PDR September 27, 2016

Valued comments and recommendations input for: Review Purpose Valued comments and recommendations input for: Technical Design Scope Design within cost and schedule ES&H Evaluation of readiness to continue the design toward a Final Design Review LCLSII 2K Cold Box PDR Sept 27 2016

Agenda Jefferson Lab CEBAF Center Room F133 Time Topic Presenter 10:00 Introduction: Purpose, Agenda, Scope, Charge, Lessons Learned and previous issues, Layout   Dana Arenius 10:30 Process Requirements and Design Approach Vishy Ravindranath 11:00 Mechanical Design (3D) Damon Rath 11:45 LUNCH 1:00 Safety and ESH Hongyu Bai 1:30 Structural Analysis Shirley Yang 2:00 Instrumentation and Control Chris Scanlon 2:30 Cost, Schedule and Staffing (High-level) Mike Bevins 2:45 BREAK 3:00 Questions LCLSII 2K Cold Box PDR Sept 27 2016

2K Cold Box Design Scope Engineer and design a cold box assembly in accordance with national and SLAC safety standards for fabrication Provide sub atmospheric pumping up to 215 g/s of 2K helium gas using five stages of serially connected variable speed centrifugal compressors supported by magnetic bearings Must support the flow rates associated with LCLSII “First Light” and standard normal linac operation LCLSII 2K Cold Box PDR Sept 27 2016

Members of the review Committee: Charge Members of the review Committee: Mr. Matthew Howe (SNS) Mr. Kelly Dixon (Jlab) Mr. Jay Theilacker (FNAL) LCLSII 2K Cold Box PDR Sept 27 2016

Review Charge Technical Scope Are all specifications, requirements, performance and interface documents identified, reviewed, and at the level of maturity commensurate with a PDR. Is the design sufficiently mature and technically sound so as to meet the performance specifications at this point of design? Have installation issues been identified and addressed in the preliminary design? Have all the major interfaces been identified and incorporated into the design? Design Management Is the design team organized and staffed to successfully complete the project? Have all of the major risks been identified (ex: seismic)? Has Value Engineering been appropriately applied? Is the development of associated process design sufficiently to support the detail mechanical and electrical design ? Cost and Schedule Is the current preliminary cost and schedule reasonable to achieve the planned technical scope? This is a reasonableness assessment by technical experts, not a detailed cost/schedule review. ES&H Have all related ES&H aspects been identified, and planned to be properly addressed? Miscellaneous Have all the previous design review action items/comments been addressed? Have lessons learned been addressed? Are there any other issues that have been identified that need to be addressed? Overall Readiness Is the design maturity at the level sufficient for preliminary design review approval? LCLSII 2K Cold Box PDR Sept 27 2016

Magnetic bearing coil failures…encapsulation Lessons Learned Magnetic bearing coil failures…encapsulation Applied voltage in helium <100V to avoid arc over Inter-stage piping volumes to avoid process coupling Role of run up torque on lower CC stages vs. amperage Flow distribution within CC suction piping Use of locked speed ratios during pump down instead of individual CC volumetric flow calculations Glass electrical feed through failures, large conductors LCLSII 2K Cold Box PDR Sept 27 2016

Cryoplant Building 2 CDS Transfer lines Cold Box Room Compressor Room 1 Compressor Room 2 Cold Box Room 2 CDS Transfer lines

Cryoplant Layout Overview LN2 storage CP1 4.5K Cold Box GHe storage CP1 Oil Removal CP2 4.5K Cold Box CP2 Oil Removal CP2 Compressors CP1 Compressors Oil processor 2K CBX Guard Vacuum CDS Interface Boxes LHe Dewar LHe Dewar Instrument Air Motor Control Center 9

May I answer any questions? LCLSII 2K Cold Box PDR Sept 27 2016