Interaction of SSS Software

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
IEC Substation Configuration Language and Its Impact on the Engineering of Distribution Substation Systems Notes Dr. Alexander Apostolov.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Observation Preparation Tool (OPT) Loránt Sjouwerman (NRAO/Socorro)
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Software Status Sonja Vrcic Socorro,
SSS Group Management Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler & David Harland EVLA Computing Division Head & SSS Group Supervisor.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
1 Software for the KEK test Malcolm Ellis 13 th April 2005.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
Observation Preparation Review of SSS Readiness for EVLA Shared Risk Observing, June 5, 2009 David M. Harland SSS Group Lead.
Configuration Mapper Sonja Vrcic Socorro,
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Overall Data Processing Architecture EVLA timeline and priorities.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
David Adams ATLAS Hybrid Event Store Integration with Athena/StoreGate David Adams BNL March 5, 2002 ATLAS Software Week Event Data Model and Detector.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Software Overview Sonja Vrcic
From LSE-30: Observatory System Spec.
Observatory Control System
Bryan Butler EVLA Computing Division Head
Database System Concepts and Architecture
EVLA Archive The EVLA Archive is the E2E Archive
ARD Presentation January, 2012 BodyPointer.
Java programming lecture one
SKILL ASSESSMENT OF SOFTWARE TESTERS Case Study
Chapter 10 Development of Multimedia Project
EVLA Computing Software Overview.
Interactive Learning An empFinesseTM Smart Atomic Learning Solution.
VCI Overview Sonja Vrcic
Antenna Monitor & Control Subsystem Engineering Requirements
Software Requirements
Scientific Oversight and Testing of Software
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
Exploring the Power of EPDM Tasks - Working with and Developing Tasks in EPDM By: Marc Young XLM Solutions
EVLA Advisory Committee Meeting
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Testing RESTful Web APIs
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Mark McKinnon EVLA Project Manager
Teaching slides Chapter 6.
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Construction Status
COM 205 Multimedia Applications
Requirements Bryan Butler.
Web Servers (IIS and Apache)
Presentation transcript:

Interaction of SSS Software EVLA WIDAR Correlator Face-to-Face Meeting Interaction of SSS Software with WIDAR Correlator David M. Harland 1 2007-Dec-11

EVLA WIDAR Correlator Face-to-Face Meeting What Is “SSS”? SSS = Scientific Support Systems SSS ≠ Monitor & Control SSS software captures what observers want to do, and how & when they want to do it. Proposal Submission (formerly) Observation Preparation Observation Scheduling Portion of Observation Execution? SSS Interactions With WIDAR 2 2007-Dec-11

Organization of SSS Software EVLA WIDAR Correlator Face-to-Face Meeting Organization of SSS Software Applications: Observation Preparation, Source Catalog, Hardware Configuration Catalog (2008), Calibrator Selector (2008), Scheduler Utility, Domain Model, Data Access, and some User Interface software are in common libraries shared by ALL applications Knowledge of astronomy and hardware is not contained in the applications themselves, but in the libraries those applications employ SSS Interactions With WIDAR 3 2007-Dec-11

Configuring WIDAR (1 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (1 of 6) Upcoming “Week of Work” will determine: SSS / DRAO responsibilities; i.e., which smarts go where Interaction between SSS / DRAO software; e.g., SSS talking to (non-real-time instance of) Configuration Mapper for validation of configuration instructions Detailed content of configuration instructions Rest of this section contains best guesses SSS Interactions With WIDAR 4 2007-Dec-11

Configuring WIDAR (2 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (2 of 6) SSS will have object(s) that represent configuration of WIDAR. This object(s) will: Know how to craft properly formed VCI messages Speak correlator language of basebands and subbands Be able to translate from science view (spectral windows) into correlator view (subbands) Understand WIDAR specifics, e.g.: subband bandwidth restrictions, recirculation, correlator resources, etc. SSS Interactions With WIDAR 5 2007-Dec-11

Configuring WIDAR (3 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (3 of 6) Obs Prep Tool (OPT) will employ above object(s) to create WIDAR configuration while interacting with observer Will application (eg, OPT) contact Config Mapper (w/ XML) or will this object(s) be expected to do that directly? How smart will SSS object(s) be? So smart that it gains nothing from contact w/ Config Mapper? SSS Interactions With WIDAR 6 2007-Dec-11

Configuring WIDAR (4 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (4 of 6) OPT will deal with only a subset of VCI elements subbarray, basebandPair, subband OPT might only partially populate some of these elements E.g., not likely to populate stationHw Probably store in DB in object-form (not XML) VCI messages will likely need to be completed by Executor (possibly Scheduler?) By using same SSS object(s)? SSS Interactions With WIDAR 7 2007-Dec-11

Configuring WIDAR (5 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (5 of 6) SSS WIDAR configuration object(s) will give feedback regarding ability to support observer's requests It might suggest several near-miss alternatives SSS Interactions With WIDAR 8 2007-Dec-11

Configuring WIDAR (6 of 6) EVLA WIDAR Correlator Face-to-Face Meeting Configuring WIDAR (6 of 6) User interaction in OPT Users will be presented with hardware-neutral display that allows them to choose spectral lines and regions of continuum, and to specify various properties of these lines and regions An “advanced” view will be more hardware specific LO settings, baseband and subband placement, correlator resource allocation, CBE configuration, etc. SSS Interactions With WIDAR 9 2007-Dec-11

EVLA WIDAR Correlator Face-to-Face Meeting Work Schedule (1 of 2) User Interface Group of scientists (Sjouwerman, Rupen, Owen, Hesman, Butler, van Moorsel) are guiding user interface We're working with drawing programs at this point User interface developers (Truitt, Rochford) have done R&D and proofs-of-concept for supporting req'ts in web browser Conclusion: it can be done Hardware config will be main UI focus 2008Q1 SSS Interactions With WIDAR 10 2007-Dec-11

EVLA WIDAR Correlator Face-to-Face Meeting Work Schedule (2 of 2) Domain Model: Recently created generalized and EVLA-specific code for antenna electronics Prepares signals for correlator configuration Can say “given input signals and LO settings, here's the outputs you get”. Cannot yet create LO settings based on known input and desired outputs. WIDAR configuration will be main model focus for 2008Q1 Not expecting interaction w/ config mapper in that qtr SSS Interactions With WIDAR 11 2007-Dec-11

EVLA WIDAR Correlator Face-to-Face Meeting The End David M. Harland 12 2007-Dec-11