OPERATIONAL READINESS PROCESS FOR OPERATIONS MANAGERS AND OSBs

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

Tips to a Successful Monitoring Visit
Radiopharmaceutical Production
Ensure Vendor/Engineer of Choice Product Quality
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Systems and Models in Curriculum Development. In this lesson, we will focus on the systems approach to curriculum development. By the end of this lesson,
Employee Orientation and Training
Slide No. 1 IAEA Developed by NSNI Division, IAEA under the supervision of Mr. Marco Gasparini (PNRA supported in the development under TC-Project PAK/09/028)
Readiness Review Course November Nov Readiness Review Course Introduction – Mod 1.
Process Safety Management
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Presenter’s Name June 17, Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
ISM at the Savannah River Site
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
Intervention for Chronic and Emergency Exposure Situations Developing a National Capability for Response Emergency Response Plans Lecture IAEA Post Graduate.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
International Safety Rating System
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)
Personnel.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
Review, Revise and Amend from Procedures for State Board Policy 74
Incident Reporting And Investigation Program
The Readiness Review Process – Mod 2
(5.1)Development of IMS to fit the organization (step wise)
PLWG Review 6.9 and the Interconnection process
Readiness Review Course
Software Configuration Management
Software and Systems Integration
ORR Team Leader May 2005 Revision
Readiness Review Course
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Conducting the performance appraisal
Conducting the performance appraisal
Air Carrier Continuing Analysis and Surveillance System (CASS)
HSE Case: Risk Based Approach.
Management of Change Report Errors to Management.
Incident Reporting And Investigation Program
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
CLINICAL INFORMATION SYSTEM
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
USNRC IRRS TRAINING Lecture18
TRTR Briefing September 2013
Update on the Developments in Government Auditing Standards
Engineering Processes
Final Design Authorization
Hands-On: FSA Assessments For Foreign Schools
Alignment of Part 4B with ISAE 3000
System Safety Regulation
USOAP Continuous Monitoring Approach (CMA) Workshop
Radiopharmaceutical Production
Service Requests New Proposal CSA Service Requests AA Service Requests
Equipment Maintenance Office Supplies Replenishment
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
Presentation transcript:

OPERATIONAL READINESS PROCESS FOR OPERATIONS MANAGERS AND OSBs Q05484940 John Raulston, Readiness Assurance Manager UNCLASSIFIED

Background Why use the OSB for Readiness? Why are you here? OSB Member What is your role as a member of an OSB? Discuss why the Readiness Program uses the OSB The Operations Manager is the “Responsible Manager” per Y15-190 since that position controls the safety envelope of the facility and work-start authority. This creates a “healthy tension” between the Operations Manager and the Production Manager. The OSB advises the Operations Manager and you are a member of an OSB. The Y15-190 process is not a “Cookbook” for what level of readiness confirmation to conduct. Rather it is intended to foster informed decision making based on discussion and understanding of the Risks and complexity of the particular startup or restart. Generally individuals are to assigned to groups either to represent the views of their home organization or to provide their specialized expertise. Why do you feel you are on the OSB? You are there as an individual contributor for your expertise and knowledge

Reason for the Change YSO issued YSO-CRD-03-01 Rev. 3 This revision was a major change to the Y-12 approach to Readiness. In an effort to simplify the selection of review level YSO developed Figure-1, Review Level Determination Map. The previous Y-12 method of point scoring did not mesh well with the new Map. A major revision to Y15-190 was required. Update to APAT format. New Readiness Assurance Web Site: (URL https://home1.y12.doe.gov/ready/) Discuss the key changes to Y15-190 and why. Describe the grading both on Facility, Activity, and Operation level and at the Substantial Significant Change Level. Point out that the bulk of the key changes in Y15-190 are in the Glossary and Chapter 1. Chapter 2 has been deleted as have the Non-Nuclear Checklist. Legacy Non-Nuclear Checklists will now use chapter 3 for guidance. There is a new Readiness Assurance Home Page on the internal web that has the SNR and links to the forms as well as templates and general guidance on the readiness process.

YSO-CRD-03-01, Rev. 3 Figure-1(Handout 1) Briefly discuss why the point system approach would not work. Highlight the new entry categories and note the elimination of operation outside of the safety basis as it is now included in the NNSA directed shutdown. Abnormal-event driven shut down, refer to definition.

YSO-CRD-03-01, Rev. 3 Figure-1(Handout 1) Handout-1 second page

Lesson Objectives Terminal Objective: Apply the Readiness process to evaluate changes in your facility. Enabling Objectives: EO-1 Define Facility, Activity, Operation, and significant/substantial changes to each. EO-2 Complete a Readiness Applicability and Review Level Determination (UCN-21679) EO-3 Determine which questions must be addressed on a Level 1 Readiness Assessment Checklist (UCN-21051) or a Standard Operations Checklist (UCN-21050)

Lesson Approach This session will consist of: Review of UCN-21679 Handout 2; Group evaluation of scenarios to complete the Readiness Applicability and Review Level Determination (UCN-21679) Handouts 3 & 4; Directed group discussions on determining which questions require response on the Standard Operations Checklist (UCN-21050) Handout 6, and the Level 1 Readiness Assessment Checklist (UCN-21051) Handout 7. Ensure trainees have copies of each handout.

Definitions FACILITY ACTIVITY The term FACILITY refers to buildings and other structures, their functional systems and equipment, and other fixed systems and equipment installed therein.  Individual activities will only be considered facilities when a separate Documented Safety Analysis exists for the individual activity. ACTIVITY A group of related operations that support a particular element of production or program work.  Activities are typically a higher level grouping of operations identified in the Authorization Agreement for the facility where the activity is conducted. Review the definitions for Facility, Activity as prelude to looking at slide 12.

Definitions (cont.) OPERATION Task: A specific process or a series of tasks performed in the accomplishment of program work. Task: Well defined components of program work that collectively constitute an OPERATION. The components are usually associated with operation of equipment, or handling/manipulating a work piece.  Each component of program work will usually have hazards associated with the actions being performed. Review the definitions for Operation, and Task as prelude to looking at slide 12.

Definitions (cont.) Abnormal Event-Driven Shutdown An unplanned event that directly necessitates stopping program work and meets any of the following conditions: results in or represents a near miss (i.e., one or fewer barriers remain) to personnel exposure to hazardous materials or energy in excess of established regulatory limits results in or represents a near miss (i.e., one or fewer barriers remain) to a release to the environment of hazardous materials in excess of established regulatory limits results in or represents a near miss (i.e., one or fewer barriers remain) to exposing a member of the public to hazardous materials or energy in excess of established regulatory limits results in SUBSTANTIAL or SIGNIFICANT CHANGES as part of the recovery actions (this condition, coupled with an abnormal event, takes precedence over the standalone "substantial or significant changes" entry condition) Review the definition for Abnormal Event-Driven Shutdown as prelude to looking at slide 12.

Definitions (cont.) Continuing Operations Plan (COP) A program to provide for and document the deliberate and systematic maintenance of equipment/ system operational readiness, procedure accuracy and viability, and personnel qualification/ proficiency, and readiness to operate in support of a program-related mission(s). Where feasible (based on a documented analysis of benefits, risks, and costs), surrogate materials shall be used to provide assurance that equipment/ systems remain operational. Review the definitions for Continuing Operations Plan as prelude to looking at slide 12.

Activity/Operation/Task Example This is the type of format that will be incorporated into Authorization agreements for each facility except that TASKS will not be included in the AAs. These will be in a PFD document that also lists equipment associated with each task.

UCN-21679 (Handout 2) Readiness Applicability and Review Level Determination Form replaces: UCN-21057, Applicability Determination UCN-21058, Review Level Determination UCN-21098, Readiness Assessment Startup Notification Report Input UCN-21664, Startup/Restart Description Go over the form in general discussion structure and purpose of each major section. Do not read each question as that will be done with the specific Scenarios. Show how each of the above forms has been incorporated into the document. Review how question 4 serves to define substantial/significant change for each level of facility, activity, and operation. EO-01 Review definition of program work and discuss importance of bullets. Show how Table 1 reflects Figure-1 of YSO-CRD-03-01 Review how Startup Authority is determined. Startup/Restart Authority for ORRs is determined in accordance with DOE O 425.1 and Memorandum from Linton F. Brooks to Principle Deputy Administrator and Deputy Administrator for Defense Programs, dated April 20, 2005, Delegation of Authority for Order 425.1C, Startup and Restart of Nuclear Facilities. The Manager, YSO, will be the Startup/Restart Authority for Level II RAs unless delegated (i.e., via SNR approval) to the Contractor. The Contractor Senior Manager will be the Startup/Restart Authority for Level I (checklist) RAs.

Scenario Evaluation Evaluate the following scenarios to determine the review level and who is the startup authority. Scenario 1 - Equipment Replacement Scenario 2 - New Capability Go through each scenario to determine the review level. Have the OSB chairman act as if this is presented to his OSB and let them work through it. Provide amplifying information when requested. EO-02 Handout-3 Scenario 1 should result in a standard operations checklist with demolition checklist required. Handout #5 should be reviewed. Handout-4 Scenario 2 should be a level I RA based on 1 “YES” response to question 4 d, (i.e., this is a substantial change to an OPERATION).

UCN-21050/UCN-21051 (Handouts 6 &7) Level 1 Readiness Assessment Checklist (UCN-21050) Standard Operations Checklist (UCN-21051) Handout-6 & Handout 7 Use the additional slides of each form and discuss in general terms. Discuss the changes in the questions and the changes to the signature requirements between the Level I RA and the SOC. The questions are identical except UCN-2150 has question 13 for the ES&H Walkdown required by ES&H procedure. The SOC has signatures to allow flexibility on the part of the Operations Manager as to the level of review desired based on hazards and complexity. (EO-03) Discuss the need to fill the form out early in the process describe when the questions apply and what the expected level of evidence should be. (EO-03) Use Scenario 1 as an example for answering the SOC questions.

Summary Any questions or comments? Feedback on Training or forms?