1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
"AIR COOLER" Heat Exchanger
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
MR. PATTERSON CONSTRUCTION TECH 1
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
Coupler without copper coating S. Kazakov 11/13/2013.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Fabrication and measurement of RF components for CLIC study
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Page 1 F. Peauger High Gradient preparation - Team Meeting – CERN – 12/12/07 High Gradient Preparation of a 30 GHz HDS-Thick structure 1.Physical arguments.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
Description of Hand Tools Tools help us do work and make things. Tools.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HL-LHC Cleanroom Procedures Review - 12 October 2016 Thomas Jones - STFC on behalf of Alejandro Castilla (CERN), Ilan Ben Zvi (BNL), Alick Macpherson (CERN)
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Review of clean room procedures for the HL-LHC Crab Cavity Program Reviewers: John Mammosser, ORNL (chair); Stephane Berry, CEA; Vittorio Parma, Mathieu.
LCWS11 WG4 Fully featured accelerating structure engineering design
Assembly of the doorknob
Tongming Huang (IHEP) On behalf of the power coupler working group
Field Emission Minimization for LCLS-II
FNAL recent coupler troubles
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
Cleanroom Upgrade in SM18 Optical Inspection bench
Cover-Gear Box assembly
Operating SRF systems reliably in a “dirty” accelerator
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Operating SRF systems reliably in a “dirty” accelerator
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
Degradation and possible sources Statistic of resonators
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
Technical Issues Related to Superconducting Accelerator Modules
Internal Mount Flange Facing Machine
SNS Coupler Shipping Plans
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Assembly of Crab Cavities couplers in SM18 clean room Eric Montesinos, Sebastien Calvo, Emile Grospelier, Antoine Boucherie, Frida eriksson on behalf of BE-RF-PM section members

Cleanrooms constraints Compatibility with the Crab assembly process The proposal must match with the existing structure of the cleanrooms

What to be assembled ? HOMS (High Order Modes Suppressors Couplers) RF Field Antenna (Measuring couplers) HOMS RF Field Antenna Length: 239mm Mass: 0.5Kg Length: 205mm Mass: 3.5Kg

What processes ? HOMS assembly HOMS storage box assembly HOMS on storage box HOMS on crab cavity Field Antenna assembly Field Antenna box assembly Field Antenna on storage box Field Antenna on crab cavity

Workflow global ? All parts come from the chemistry (bat. 102) defatted individually wrapped However some will be assembled (soldering or EBW), those always follow a ''clean'' process (packaging and handling with gloves) Those sets are re-washed manually before entering baldaquin/ cleanroom

HOMS (High Order Modes Suppressors Couplers) RF Field Antenna

Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Delivery all part packed by the Chemists experts by 2 layers of plastic bag 1 Blow with pure air the 1 layer Move inside baldaquin 2 Blow with pure air the layer 2 1 All parts come from the chemistry (bat. 102) defatted (with laundry without acids) individually wrapped.

Assembly flowchart HOMS assembly and Field Antenna assembly 3 Description Area Time Cleaning of external faces with clean room tissues and isopropyl alcohol 70% 2 Rinsing with demineralized ultra pure water Drying with pure air + 1 night under laminar flux X + 1 night Blow and particles counting with HACH ANNATEL UP 100 Number of particles < 20p/ml Entrance in sas ? all the components 3 2 SAS 3 HPR Size Channels (μm) 0.1 μm, 0.2 μm (plus 0.5 μm and 1.0 μm optional) Display Resolution 0.01 counts/mL

Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Delivery of accessories-nuts, bolts, washers and copper seals packed by the Chemists experts by layer of plastic bag 1 Blow the layers with pure air Open the layer of accessories 2 Rinsing with demineralized UV ultra pure water 2 1 screws A4.100 M6x45 Washers 6x12 Bolts A4.100 M6 studs A4.100 M6x25

Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Put all pieces on 1er drying support Drying with pure air + 1 night under laminar flux 2 Blow and particles counting with HACH ANNATEL UP 100 Number of particles < 20p/ml 2 Drying support

Assembly flowchart HOMS assembly and Field Antenna assembly 3 Description Area Time Entrance in sas all the components 3 2 SAS 3

Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Entrance in clean room ISO 4 all the components on support 4 Put the assembly all HOMS, feedthrough and field antennas on special 2nd drying support 4

x3 Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Assembled by hands the HOMS seal 4 Put fastening Tighten until no gap between flanges (in cross first and in circle to finish) 4 x3 2eme 1er

x2 Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Assembled by hands the feedthroughs 4 Put fastening Tighten until no gap between flanges (in cross first and in circle to finish) 4 x2

Assembly flowchart HOMS storage box assembly and Field Antenna box assembly Description Area Time Package all the assembly with 2 layers of plastic bags 4 Make a leak detection until < 1x10-10mbar/l/s-1 5 Re-package all the assembly with 2 layers of plastic bags after leak detection 4 5

Stored until the final cavity mounting Assembly flowchart HOMS storage box assembly and Field Antenna box assembly Stored until the final cavity mounting 16

Assembly on cavity CRAB

Assembly flowchart HOMS assembly and Field Antenna assembly Description Area Time Delivery of accessories-nuts, bolts, washers and copper seals packed by the Chemists experts by layer of plastic bag, guide tooling for assembly And HOMs & field antenna with layer of plastic bag 1 Blow the layers with pure air Open the layer of accessories 2 Rinsing with demineralized UV ultra pure water 2 1 Centering tool screws A4.100 M6x45 Washers 6x12 Bolts A4.100 M6 studs A4.100 M6x25

Assembly flowchart HOMS assembly and Field Antenna assembly 3 Description Area Time put in sas all the components 3 Entrance in clean room all the components and put them in to the table 4 Blow with pure air and extract the layers 4 SAS 3

Assembly flowchart HOMS storage box assembly and Field Antenna box assembly Description Area Time Blow with pure air all HOMS and Fields antennas 4 Put Nitrogen N2 pressure in cavity +0.2bars Take off HOMS or Field antenna 4

Assembly detail for HOMs 3.5kg FLIP / FLAP x3

Assembly detail for field Antenna 0.7kg x2

Angle positioning system

Assembly flowchart HOMS storage box assembly and Field Antenna box assembly 5 Description Area Time Put by hands HOMS/Field antenna on the cavity 4 Put the centering device Put the washers and screws Tighten until no gap between flanges (in cross first and in circle to finish) Stop Nitrogen N2 pressure in cavity Go with support outside cleanroom for make a leak detection until < 1x10-10mbar/l/s-1 5 4

Total mounting tolerances Seal RF DN 40 After mounting tolerances hoped: Off-center tolerances DN63 = mini -0.05mm maxi 0.25mm Seal tolerance DN63 : Ø82.4  +/-0.05 Flange tolerance DN63 : Ø82.5 0.1/0 (x2) Total angles tolerances mini -0.15mm maxi 0.1mm  ~0.15° Ungasing slot tolerance : 1.5+/-0.1 (x2) Angle positioning tool tolerance : 1.40/-0.05 Asked positioning for FPC assembly: Axials tolerances +/- 1mm Angles tolerances +/- 1° what we can have with the accumulated tolerances max: Axials tolerances +0.25mm/-0.05mm Angles tolerances +/- 0.15°

Final assembly !

ANNEXES