Calculating CRR Auction Portfolio Exposure:

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
Review of NPRR586 CMWG 1/7/2014. Existing Credit Lock Process ERCOT calculates a “preliminary allocated CRR transaction limit” based on “eligible” CRRAHs.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
WMS Subgroup – CRR Credit 3.Review of CRR margining methodology for PTP Obligations in Nodal Protocols 4.Potential credit margin alternatives Cheryl Yager.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
1 Business Integration Update to PRS September 20, 2012.
1 Nodal Stabilization Market Call December 14, 2010.
1 Market Trials Congestion Revenue Rights Weekly Update April 16, 2010.
Congestion Revenue Rights Market Trials Call 19 February, 2010.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
1 Cutover Market Call November 29, :00 AM.
1 Market Trials Congestion Revenue Rights Weekly Update April 30, 2010.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
1 Nodal Credit Update at WMS June 16, 2010.
1 NPRR 484/554 Phase 2 Suresh Pabbisetty, ERP, CQF, CSQA Lead Technical Analyst, Credit CWG / MCWG May 20, 2015 ERCOT Public.
July 28, 2010 Market Readiness Seminar Credit Transition to Nodal (Preliminary)
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
1 Business Integration Update to PRS October 18, 2012.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
1 Market Trials Congestion Revenue Rights Weekly Update May 28, 2010.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
1 Market Trials Update NATF January 5, 2010.
Re-Execution of the February ’16 Monthly CRR Auction David Maggio & Mark Ruane Technical Advisory Committee January 28 th, 2016.
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
Balance of Year Auction Frequently Asked Questions
Market Trials Update NATF March 2,
CRR MUI Upgrade Requalification Demonstration WebEx
Market Trials Congestion Revenue Rights
CRR Credit Calculator CWG/MCWG 5/17/2017.
Market Trials Congestion Revenue Rights
Cutover Market Call November 29, :30 PM
Intent to Apply/Pre-Application Guidance
Market Credit Working Group update to the Wholesale Market Subcommittee 9/27/2017.
ERCOT CRR Update to CMWG
Procurement Timelines Overview
Health Savings Account (HSA) Funding & Invoicing
Market Trials Open Market Participant Call
Market Trials Open Market Participant Call
Health Savings Account (HSA) Funding & Invoicing
Texas Instruments Supplier Portal- Web Invoice Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Procurement Timelines Overview
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Order-to-Cash (Project-Based Services) Scenario Overview
Presentation transcript:

Calculating CRR Auction Portfolio Exposure: Possible Solutions for Market Participants 6/19/2017

Review - how does it work now? CRR system requests ACi99 and ACP coefficients for existing OBL Baseload paths in auction, and publishes them 5 business days before bid window closes When final bid window closes, CRR system requests the rest of the ACi99 and ACP coefficients for the OBL Buy bids not previously requested from baseload, then calculates the portfolio credit exposures for each CounterParty, then for each Account Holder If the exposure for the CounterParty is greater than locked credit, a budget record is created and sent to the engine for that CounterParty If an Account Holder locked credit as well, a budget record for the Account Holder is also sent to the engine when the portfolio value is greater than what was locked OBL buy bids have credit exposure, but only OBL buy bids need ACi99/ACP coefficients OBL Sell Offers and OPT buy bids also have credit exposure, but do not use ACi99/ACP coefficients OPT sell offers have no credit exposure Exposure calculation uses ‘maximum stack exposure’ for each product for the credit evaluation as opposed to each individual bid getting its own calculation (bid stack is multiple bids for same product where only MW and/or price vary) – this was initially implemented with NPRR357

Review – timeline of credit lock for CRR auctions Credit window for CounterParty (and Account Holder, if desired) opens when Market Notice is published and closes with the first bid window close Credit window is not open during a 2nd Round Transaction window CRR system sends “Locked” credit to the CMM system for each auction immediately after the bid window closes at 5:00pm, and then daily at 8:00am until it is released CRR credit is ‘released’ from the CRR system at 8:00am the day after auction results are posted (day invoices are sent) Credit displayed in the CRR system in the upper pane of the Credit Limit editors labelled “Locked” is the value sent to CMM during the lock period Credit displayed in the CRR system in the lower pane of the Credit Limit Editors labelled “Current” is not sent to the CMM system CRR system calculates the portfolio valuation at the time the engine macros are run, not when the bid window closes CRR system does not send portfolio valuation to CMM; it only sends the Locked Credit

ERCOT’s assumptions -What is not working well for Market Participants? Not having ACi99/ACP paths for expected OBL Buy bid paths (not in current OBL baseload), and having to manually calculate each of them Calculating portfolio exposures with confidence Calculating maximum stack exposure when bid stacks are used Calculating CounterParty exposure when there is more than one Account Holder

What issue is being addressed by a more automated solution? Not locking enough credit for each auction and being subject to credit constraint during optimization Not getting CRR awards because of unexpected budget constraint Locking too much credit for each auction and having it held for 8-16 days and not available to other markets These issues become magnified with the unavoidable overlapping credit windows; beginning in November, virtually every month has a 1 day credit overlap between a monthly auction and an LTAS auction: 2017: 11/16 2018: 1/18, 2/15, 3/22, 4/19, 5/17, 6/21, 7/19, 8/23, 9/20, 10/18, 11/15 2019: 1/17, 2/14, 3/21

Possible Solutions – better information on ERCOT websites 1. CRR team update auction portfolio exposure calculation methodology on ERCOT/CRR website. Pros: Low cost (none, in fact) More transparent examples on how portfolio exposures are calculated following exact methodology used in the CRR application Cons: Decouples exposure calculations from system that actually computes it Still requires that Market Participant compute or obtain ACi99/ACP values No validation of correctness of data entry (ACi99/ACP values, bid paths, dates, total bid hours, etc.) Highly error prone (data has to be entered correctly and completely, and instructions meticulously followed) Has to be manually recomputed for every portfolio change – difficult to do “what-if” scenarios System Impact: None Note: CRR team will update excel spreadsheet (pre NPRR357) to compute each bid’s exposure – however, user will still need to enter the portfolio, and the ACi99/ACP values on their own. This spreadsheet will calculate bids/offers line by line, and not perform ‘stacked bids’ exposures as that would take a macro or other programmatic solution. See Appendix for sample file for monthly auction.

Possible Solutions – ERCOT provide calculator outside of CRR system 2. ERCOT to write a web-based tool to estimate auction portfolio exposure for Market Participant, external to the CRR system Pros: More accurate than Market Participants computing values on their own What-if scenarios Cons: Still just an aid as it is decoupled from system that is actually calculating credit exposure Highly error prone (e.g., Market Participant calculates wrong portfolio, or changes portfolio, or transposes the credit values from the tool to the CRR Credit Limit Editor, or forgets to enter value into CRR system, etc.) Requires ACi99/ACP values, and depending on the complexity of implementation, this could have database performance issues, system-to-system communication delays, etc. Multiple teams involved (CMM, CRR, Security, MIS, TIBCO, RM, DB, Replication, Project Management) Some limitations would still be necessary – such as limiting the requests to the portfolio size (i.e., use auction bid limits), as well as only requesting the coefficients twice per day System Impact: CMM, TIBCO, MIS NPRR484 Phase B (2019 timeframe)

Possible Solutions – CRR application calculates periodically during credit window (Vendor solution) 3. Credit calculated ‘periodically’ by CRR system during open credit window by the CRR system Pros: Validates submitted bids (e.g., biddable settlement points only, ESSPs) and uses same exposure calculation for forming budget constraint (would need to be on submitted bids due to DB design constraints) Timely credit exposure calculation to assist in locking the right amount of credit Computes credit for Counterparty What-if scenarios Cons: Vendor solution, and likely to be somewhat expensive – unknown if this would even be possible in new Framework Performance issues with database, especially when competing with bid submissions on bid close day – current CRR database is not designed for this level of resource competition System-to-system communication issues No guarantee that data gets delivered ‘on time’, or that Market Participants don’t change portfolios after request has been made Market Participants submitting bids ‘too late’ to get calculations Possible Protocol revisions Might need some Protocol language to cover situations where DB could not perform calculations – auctions would not be delayed or postponed, Market Participants still need to supply credit limit even if system is unable to perform the exposure calculations ‘on time’ Might want some Protocol language on bid submission and credit windows (e.g., extend bid window; have credit window and bid window be the same period; have credit window close after bid window) System Impact: CRR Vendor solution CRR, CMM, TIBCO Cannot be estimated until Framework Upgrade is completed in Jan 2018 NPRR484 Phase B (2019 timeframe)

Summary Option Systems Impacted Developed by Dependencies ETA 1) ERCOT provides better instructions and excel templates None ERCOT Finish CRR framework upgrade testing (CRR team) 2017 2) ERCOT provides external calculation tool for portfolio exposure, automatically fetching ACi99/ACP values as part of the tool CMM NPRR484 Phase B 2019 3) CRR system improvement (written by vendor) to calculate exposure value as part of auction bid window activities CRR, CMM Vendor

Appendix: Sample Excel spreadsheet for Monthly Auction Estimated Exposure (no stacks) – LTAS multi-month OBL Buy bids need 6 values for Hours, ACi99 and ACP; Monthly 24-Hour OBL Buy bids need 3