Environmental Assessment

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Omega & Associates Engineering Ltd. Chilliwack Providing professional services to our clients with quality, cost effective AND innovative engineering solutions.
WASH Cluster – Emergency Training DR DR1 1 DRAINAGE Session 1 Introduction.
WASH Cluster – Emergency Training DR DR2 1 DRAINAGE Session 2 Strategy.
There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills (rubbish pits).
Greywater – the invisible problem………….. Jay Bhagwan.
Exterior cladding May 3 rd, Building Cladding 1.What is cladding 2.Types of cladding 3.Construction methods 4.Advantages and disadvantages.
Andrew Pinkerton Secretary Scottish Construction Industry Group University of Strathclyde Department of Architecture & Building Science Professional Studies.
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
Transfer Stations.
 Building Walls  Wood Framed Walls  Precast Concrete Walls  Steel Framed Walls  Sustainable Walls.
WASH Standards. Emergency WASH Services/Standards Safe and Adequate Water: Sanitation Hygiene Pormotion Drainage Waste Management.
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
“ Protect Our Water – Our Future ” The International Year of Freshwater 2003 – Youth Forum 13 December 2003 City University of Hong Kong.
Heading TfL Sustainability Approach and Resource management Helen Woolston, TfL Sustainability Coordinator BASE London June 2013.
Target facilities (buildings) First floor of the building Second floor of the building Building for filtering process 14 Building for drum washing process.
Water Treatment Management FOR Sustainable Industry
Construction Health and Safety Management By Dr Simon Smith – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike License.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works 1.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
September 2005Urban Planning Carleton University 1 Drainage Systems _____________________________.
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
Martin Clarke British Precast 11 February 2009 The Sustainability Advantages of Concrete Structures.
Sustainable Construction Methods
Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.
Bangladesh Poor sanitation in Bangladesh. Statistics Is one of the poorest countries Most densely populated country in the world 74% of people get water.
B UILDING D RAWINGS Location Plan Site Plan Floor Plan Symbols.
PMP1 Taija Puolitaival Unitec 2012 Presenters Tony Bosnich Glenn Edmonds 2014.
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
BEST PRACTISE Use of permeable paving As part of a new Railway Station in Bromsgrove a new car park was being installed. This permeable solution had to.
Camp Management and SPHERE Standards Module 4 Session 4.2 National Disaster Management Practitioners, Islamabad, Pakistan.
SITE VISIT AT BITOLA THERMAL POWER PLANT ROB IVA MAGDA DANIELA ZORAN NIKOLAY.
BET2492/BPS3413 CONSTRUCTION SAFETY
Environmental Pollution -any addition of undesirable substances to the soil and air, and both surface and groundwater by human activities -can spread far.
DOMESTIC DRAINAGE SYSTEM 2012BC25444
Brownfield Site Visits An Assessment of Safety and Health Hazards Johanna Hollingsworth, MPH HCI-ATL, LLC. Germantown, MD May 7, 2008.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Facility Environment 1.
THE ENVIRONMENTAL IMPACT OF CONSTRUCTION MATERIALS AND METHODS
Planning the Project Unit 1 – Lesson 12.
Legislation Carl James.
How to Protect the Local Environment
Temporary Works – P8 Project Practice.
Shyamaghat Rainwater Model Project
Water Services Trust Fund
Mining.
Low Energy Building Design
2007 National Food Science CDE
How do people affect the environment?
Environmental Protection “Our Earth is Our Home”.
Waste management trash, recyclables, hazardous waste, nuclear waste, e-waste, biological waste, . . .
Life Cycle Assessment of MSWI residues: Recycling in road construction and landfilling Harpa Birgisdóttir.
Essential for good health
Sources of water Rain Snow Water is needed for drinking Uses of water Water is needed for drinking.
Environmental Geotechnics
Chapter 6 Lesson 5 Pollution & Conservation
Environmental Protection “Our Earth is Our Home”.
Value of contract: Length of contract: Contract start date:
Title of Presentation dd.mm.yyyy 2-in-1 Product Solution Temporary & permanent application with one product DELTA BLOC - We develop.
UNIT I.
UNIT I.
Table 3. The needed requirements of the Concrete Sustainability
Table 1. The most important aspect applied in MIVES
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

Environmental Assessment OO1 - Environmental, Health and Other Provisions 1.1 Nuisance and Environmental Protection a. Recycling b. Noise c. Dust Control d. Tree Protection e. Acid Cleaning f. Removal of water g. Environmental Management Plan h. Construction Waste Management i. Mosquito j. Bonfires

1.2 Site Drainage a. Haul roads within the site b. Site drainage c. Slit pits or traps d. Wheel washing e. Hard Paved Construction 1.3 Curing rooms a. Curing rooms b. Curing tanks 1.4 Sanitary a. Toilet accommodation b. Temporary latrines

OO2 - Site Security, Access and Storage of Materials 2.1 Storage and Handling of Materials a. Steel fabricating yard b. Other metal work c. Timber works d. Components e. Batching plant f. Precast concrete yard / Precast elements