ADELANTE SPANISH IMMERSION SCHOOL

Slides:



Advertisements
Similar presentations
2010 MEASURE C FACILITIES IMPROVEMENT PROGRAM Proposed Implementation Plan September 14, 2010.
Advertisements

Bud Jacksons Sportsmans Bar & Grill 2209 Adams Avenue As purchased in 2003 Built circa 1920 Legacy restaurant and bar facility Existing service area: 3,446.
East Hampton High School July 2013 – July 2014 Design Phases.
Tam Valley School Modernization - Phase 1 Summer 2011.
Brigham Young University. Deseret Towers 1800 bed-spaces Seven seven-story board and room style halls Built in 1960s and early 1970s Demolition in two.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
ACACIA COUNTRY & GOLF CLUB REVISED MASTER PLAN GATE HOUSE ACACIA COUNTRY & GOLF CLUB.
Home Buying Process Housing Selection. Objectives •Identify Factors to Consider When Selecting a House •Determine How To Locate Houses on the Market •Consider.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
University of Houston-Downtown Welcome Center/Girard 3/Garage Update
Punch! Pro Platinum Home Design Adding Closets. Bedroom Closet Click on the Floor Tab, and then click on the Interior Wall icon. Count up three feet from.
Los Alamos NATIONAL LABORATORY 6/25/02, Sheet 1 UniFormat, OmniClass, MasterFormat UNIFORMAT II -- an org system for building “Elements” Elements: foundation;
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
THE COMMUNITY OF GOLD HAVEN LAKE Golden Grove Lakeside Living.
SHARON CITY SCHOOL DISTRICT Page 1 of 18. SHARON CITY SCHOOL DISTRICT Page 2 of 18 OPTION 1C – New Building on Case Avenue Site  Building Grades: K-6.
Phase Difference = Phase Difference = 0.05.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
Building Affordable Housing & Strong Futures Since 1975.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
Managing your living space TLW practice ways to organize and design living space.
AF SHCR Smoky Lake, Alberta PROPOSED SITE PLAN Office Entrance Formal Entrance Primary Entrance Youth & Wheelchair Entrance.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
WEB PROGRAMMING – ASP.NET Presented By – Kiran Kumar Gunna.
Ridgefield School District Capital Facilities Plan March 9, 2010.
Space Planning Chapter 7 and 16.
LESSON 11 PHYSICAL SECURITY Prepared by: Camo, Christian Leo O. BS Criminology LEA 2.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Floor Plan Sketch on 17” x 22” Graph Paper  Rough Scale Drawing  Room dimensions  Room Names  Basic House Characteristics AutoCAD floor plan including:
Work Progress Photos From 1 ST To 15 TH NOV 2015.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
July 15,  Objective  Recommendations  Scope of Work  Savings  Funding  Alternatives / Risks  Next Steps 2.
Fair Oaks, Garfield, Hoover, Orion, Taft
Senior Cottage Exterior Rendering 11/5/16
Capital Improvements Presentation
All Saints Church proposal
ACCOMMODATION SOLUTIONS
PROJECT PLANNING MEETING
BOND PROGRAM- Door Lock & Building Access
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Working Group Question A1, A2, A3, A4, A5, A6
Wood Frame Construction
Dyar-Kiesling House 526 E 12th Avenue
Your Neighbourhood Consultation on changes to local services
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Charter Oak Unified School District
Certificate of Appropriateness 528 E 14th Avenue Folsom House
Capital Outlay Workshop
Capital Project Update
251 South Street Existing Town Hall
Golditwins and the Three Bears
ORION ALTERNATIVE SCHOOL
Count on 2 (Over the bridge)
Keystone Library Deliverables
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
Royal Leamington Spa Neighbourhood Development Plan 2029
250 Catalonia Building Remarks:
safety…security…pride
Presentation transcript:

ADELANTE SPANISH IMMERSION SCHOOL NEIGHBORHOOD MEETING (MAY 1, 2017)

ADELANTE SPANISH IMMERSION SCHOOL EXISTING CONDITIONS

ADELANTE SPANISH IMMERSION SCHOOL LPA MASTER PLAN

ADELANTE SPANISH IMMERSION SCHOOL PHASE 1 SCOPE “Blue Line”

ADELANTE SPANISH IMMERSION SCHOOL PHASE 1 SCOPE “Blue Line”

ADELANTE SPANISH IMMERSION SCHOOL MEASURE T REVISED PROGRAM SCOPE

ADELANTE SPANISH IMMERSION SCHOOL PRIORITIZED COST

ADELANTE SPANISH IMMERSION SCHOOL EXISTING LUNCH TABLE ARRANGEMENT

ADELANTE SPANISH IMMERSION SCHOOL PROPOSED SITE-BUILT LUNCH SHELTER

ADELANTE SPANISH IMMERSION SCHOOL CHALLENGES AND CONSIDERATIONS Educational space count is short 3 compared to existing educational spaces. Exterior rated Walk-in Freezer/Refrigerator will impact a couple of existing Kitchen parking spaces. Lunch Shelter location is within Phase 2 site work which is not part of this bond, but part of total FMP. Site wants security door locks in phase I. Challenging low voltage system integration due to future demolition of Buildings “A” & “B” during Phase 2. No money allotted for exterior or interior painting. No money allotted for flooring except for spaces to be reconfigured.

ADELANTE SPANISH IMMERSION SCHOOL QUESTION ANSWER SESSION Questions?