Date of download: 10/15/2017 Copyright © ASME. All rights reserved.

Slides:



Advertisements
Similar presentations
Date of download: 5/30/2016 Copyright © ASME. All rights reserved. From: Introduction of the Element Interaction Technique for Welding Analysis and Simulation.
Advertisements

Date of download: 5/31/2016 Copyright © ASME. All rights reserved. From: Considerations in the Design and Analysis of an ASME Section VIII, Div. 2 Reactor.
Date of download: 6/3/2016 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based.
Date of download: 6/9/2016 Copyright © ASME. All rights reserved. From: Adjoint-Based Sensitivity Analysis and Error Correction Methods Applied to Solid.
Date of download: 6/21/2016 Copyright © ASME. All rights reserved. From: Design for Leakage in Flange Joints Under External Loads J. Pressure Vessel Technol.
Date of download: 6/27/2016 Copyright © ASME. All rights reserved. From: Optical Microscopy-Aided Indentation Tests J. Eng. Mater. Technol. 2008;130(1):
Date of download: 7/7/2016 Copyright © ASME. All rights reserved. Cost-Effective Reliability Analysis and Testing of Medical Devices 1 J. Med. Devices.
Date of download: 7/9/2016 Copyright © ASME. All rights reserved. From: Experimental Investigation of Boiler Pressure Behavior in Closed-Open-Closed System.
Date of download: 7/16/2016 Copyright © ASME. All rights reserved. From: Study on Hardness and Elastic Modulus of Surface Nanostructured 304 Stainless.
Date of download: 9/18/2016 Copyright © ASME. All rights reserved. From: Evaluation of Impact of Shading Devices on Energy Consumption of Buildings in.
Date of download: 9/18/2016 Copyright © ASME. All rights reserved. From: Effect of Impact Pressure on Reducing the Weld Residual Stress by Water Jet Peening.
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling.
Date of download: 11/12/2016 Copyright © ASME. All rights reserved.
Date of download: 9/26/2017 Copyright © ASME. All rights reserved.
Date of download: 9/30/2017 Copyright © ASME. All rights reserved.
From: Unified Approach for Notch Stress Strain Conversion Rules
Date of download: 10/6/2017 Copyright © ASME. All rights reserved.
From: Effects of Fan Speed on Rotating Stall Inception and Recovery
Date of download: 10/12/2017 Copyright © ASME. All rights reserved.
Date of download: 10/13/2017 Copyright © ASME. All rights reserved.
From: Boilers Optimal Control for Maximum Load Change Rate
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
Date of download: 10/16/2017 Copyright © ASME. All rights reserved.
Date of download: 10/19/2017 Copyright © ASME. All rights reserved.
Date of download: 10/21/2017 Copyright © ASME. All rights reserved.
Date of download: 10/21/2017 Copyright © ASME. All rights reserved.
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
From: Orifice Design of a Pilot-Operated Pressure Relief Valve
Date of download: 10/25/2017 Copyright © ASME. All rights reserved.
Date of download: 10/28/2017 Copyright © ASME. All rights reserved.
Date of download: 10/29/2017 Copyright © ASME. All rights reserved.
From: Optimal Design of Onshore Natural Gas Pipelines
Date of download: 10/31/2017 Copyright © ASME. All rights reserved.
Date of download: 11/1/2017 Copyright © ASME. All rights reserved.
Date of download: 11/2/2017 Copyright © ASME. All rights reserved.
Date of download: 11/3/2017 Copyright © ASME. All rights reserved.
Date of download: 11/4/2017 Copyright © ASME. All rights reserved.
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Date of download: 11/7/2017 Copyright © ASME. All rights reserved.
From: Design for Control of Wheeled Inverted Pendulum Platforms
From: Heat Transfer During Compression and Expansion of Gas
Date of download: 11/11/2017 Copyright © ASME. All rights reserved.
Date of download: 11/11/2017 Copyright © ASME. All rights reserved.
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
Date of download: 11/14/2017 Copyright © ASME. All rights reserved.
Date of download: 12/2/2017 Copyright © ASME. All rights reserved.
Date of download: 12/15/2017 Copyright © ASME. All rights reserved.
Energy Conservation Education: Major Considerations*
Date of download: 12/16/2017 Copyright © ASME. All rights reserved.
Date of download: 12/19/2017 Copyright © ASME. All rights reserved.
Date of download: 12/20/2017 Copyright © ASME. All rights reserved.
Date of download: 12/24/2017 Copyright © ASME. All rights reserved.
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
Date of download: 12/27/2017 Copyright © ASME. All rights reserved.
Date of download: 12/28/2017 Copyright © ASME. All rights reserved.
Date of download: 12/29/2017 Copyright © ASME. All rights reserved.
Date of download: 12/31/2017 Copyright © ASME. All rights reserved.
Date of download: 1/1/2018 Copyright © ASME. All rights reserved.
Date of download: 1/2/2018 Copyright © ASME. All rights reserved.
Date of download: 1/22/2018 Copyright © ASME. All rights reserved.
Design of a Wireless Biological Signal Conditioning System1
Presentation transcript:

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Contour plot of MTBF (yr) assuming a two-parameter Weibull distribution

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Hazard plot for η=1.5 yr when β = 0.8, 1, and 1.5

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: The impact of a single pass or fail proof test result on the current estimate of eta (η=20) for various weight factors: λ=0.1, 0.2, 0.3, and 0.4(β=1.5). Note that: (1) for passed inspection at 5 yr, η=20 yr (essentially no change); (2) for failed inspection at 5 yr, η=13 yr.

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Rp versus time-in-service (years) for the SRS used valve proof tests

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: The cumulative maintenance time distribution for time-in-service for used valves

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Box and whisker plots for time-in-service of failed and passed SRS used valve proof tests

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Contour plot of the likelihood function, L, using SRS proof test results

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Updating η based on SRS used valve proof tests

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Snapshot of a 56 K Monte Carlo series of η updating for simulated time to failure (β=2.3 and η=21 yr) using (a) the current valve maintenance plan. (b) the current valve maintenance plan extended by 1 yr. and (c) the current valve maintenance plan extended by 2 yr.

Date of download: 10/15/2017 Copyright © ASME. All rights reserved. From: Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique J. Pressure Vessel Technol. 2012;134(6):061601-061601-7. doi:10.1115/1.4005940 Figure Legend: Risk, inspection cost, and total cost of inspection for extending maintenance intervals