HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.

Slides:



Advertisements
Similar presentations
The STAR Heavy Flavor Tracker Flemming Videbæk For the STAR collaboration Brookhaven National Lab 1.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
HFT Safety --PXL detector September 26, Dana Beavis.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
Project Overview Flemming Videbaek Brookhaven National Laboratory.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
SSD Tasks and Costs Howard Matis October 14,
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HFT face-2-face F.Videbaek Brookhaven National Lab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
HFT project Overview and Status May 11, 2010 F.Videbaek BNL 5/11/20101.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Resource Loaded Schedule and Budget Profile
Children Services Committee Project 4 Update
Jim Fast Pacific Northwest National Laboratory
HFT project Overview and Status March 10, 2010
Update on the SVD construction
Face to Face Meeting – March 2012 Sarah Morgan
Oversight Board Meeting October 3, 2017 Rob Michnoff
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
Radiation Laboratory Meeting
X-ray Pump-Probe Instrument
Status of CO2 Cooling tests at CERN for Pixel phase 1
Stan Whitcomb LSC meeting Livingston 21 March 2005
April May April May June July July June August Sept August
TSF Upgrade Project Overview Resources Plans and Timetable
Update on ATLAS insertable B-layer
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL

Overview Selected Highlights (likely to be shown in other talks) RHIC news Schedules Financial Status OPA review & Other meetings Issues 3/14/12 F2F LBNL

PXL RDO board designed , produced. Insertion rail moving ahead 3/14/12 F2F LBNL

SSD Nantes Engineers working on Ladder board design changes RDO board design and layout well underway. Software in slow control making good progress 3/14/12 F2F LBNL

IST Prototype ladders populated with chips and APV Testing going well. Cosmic ray observed. 3/14/12 F2F LBNL

Software Significant work of detailed Geant Geometry, and the BigFatChain (BFC.C). CCM and database efforts gearing up FGT PIXEL PST PIT 3/14/12 F2F LBNL

RHIC News Running Schedule DOE FY13, 14 guidance BNL response Combine 13/14 into 20 week run BNL response Plan of 15 week run-13. Vigdor still want to keep the Dec 1 cool down day Upcoming BNL management changes important to RHIC and HFT. ALD, Physics Dept Chair. 3/14/12 F2F LBNL

High level consequence Assume a run 13/14 would have to start in Sept, STAR roll-in must start ~ July 10. Neither IST not SSD can be installed. Even the PXL schedule would get close. Until this becomes de facto plans I will resist spending much effort from everyone on looking at alternatives (take efforts away from actual work) If time we can talk about this at end of day. 3/14/12 F2F LBNL

Summer Schedule June 10 Review of status of readiness for installation, ahead of decision to roll-out (from HFT point of view)  June 18 roll out effort begins ..The  July 16 Rollout complete  July 17-20 disassemble IDS July-21- Aug 4 load test Reassemble IDS Load Test may not be needed. Aug 6- August 19 Assembly of IDS including WSC with FGT with PST and Be-beam pipe The current assembly plan worked out by Eric requires this to be done on floor. For PXL only installation cleanness requirements are modest  2 weeks of schedule contingency. Sept. 4 IDS lifted/rigger to platform This requires lifting assembled IDS to SVT platform. Critical lift. WC is still pushing assembly on SVT platform.   Sept 7 STAR roll in starts Following roll-in (Oct 15?) Platform installation Beam pipe connections, Bake out Taken from our document 3/14/12 F2F LBNL

Financial Status Details by Sarah High level as per last month We have spend k$ 3,178 ( k$385 redirect) We have used k$150 of contingency (efficiency on PXL, increase on integration and IST) Remaining contingency k$ 3,514 This is a healthy 35% of cost to complete. 3/14/12 F2F LBNL

Issues Preparations for summer/fall installation. Collaborator integration into IST efforts (UIC) (positive issues) Sub-contracts awards. Continue to be diligent. MIT 2. installment in place (5 weeks after receiving) Indiana (IST/SSD) has taken longer but is in process.. Work on all awards for rest of year Continue to properly signoff on design and preproduction reviews (internal) 3/14/12 F2F LBNL

Open Action Items Ladder Assembly Plan; IST (CD) Grounding plan completion; SSD IST (CD) Initial Safety reviews; IST,SSD IST cooling liquid Beam pipe structure Assembly planning comments 3/14/12 F2F LBNL

OPA review Scheduled for July 17-18 Schedule a dry run for June (Date is not easy to identify. PAC 7-8, RHIC users meeting 12-15,STAR upgrade. Possible date: June5/6 or June 18/19 Final rehearsal and polish of talk 1-2 days ahead of the meeting. More from Lloyd following talk. Need a schedule overhaul as the one we just completed done so it is appropriately up to date for the dry run and documentation. (Early June absolute deadline) 3/14/12 F2F LBNL

Other upcoming meetings Mid-April ½ day EVO meeting May F2f at BNL UIC people should be available Heavy Flavor Meeting UIC June 17-18 http://www2.uic.edu/~kkaude2/hfworkshop2012/ 3/14/12 F2F LBNL

Summary There is much progress, and technically it is very promising. Schedules are tight as has always been known. Once the assembly schedule for IST is revisited, and the SSD production we will get a much better handle ahead of the OPA review. 3/14/12 F2F LBNL