WORK STUDY WORK MEASUREMENT.

Slides:



Advertisements
Similar presentations
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Advertisements

Chapter 3 Time Study.
Direct Time Study Sections: Direct Time Study Procedure
Time Study Procedure - Overview
WORK SAMPLING Lecturer: S.U.Seçkiner Source: Motion and Time Study Design and Measurement of Work.
INSY 3021 Time Study Auburn University Spring 2005.
Maintenance Work Measurement
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
1 EI441 Work Analysis and Design Text book: Motion and Time Study by R.M. Barnes, 7 th ed. (1980). Topics: 1.Introduction, Productivity, Definition and.
Productivity One of the most important responsibilities of an operations manager is to achieve productive use of organization’s resources. Productivity.
Work Measurement Time is important in work systems because of its economic significance. Most workers are paid for the time they are on the job. For any.
DIRECT TIME STUDY Dr. Ahmed Elyamany.
Chapter 11 Work System Design.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Operations and Supply Chain Management, 8th Edition
Chapter 4 Process Design.
Chap 20-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 20 Sampling: Additional Topics in Sampling Statistics for Business.
Lecture 12 Statistical Inference (Estimation) Point and Interval estimation By Aziza Munir.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Contingent pay- Incentives and rewards Individual Piece work: Uniform price per unit of production or pay is directly proportional to result Most piece.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
“Time study is the one element in scientific management beyond all others making possible the transfer of skill from management to men…..” – Frederick.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Work Measurement Vital inputs for: Standard Time
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
1 ISE Chapter 24: Determining Time/Job Uses for time/unit information  Cost allocation  Production and inventory control  Evaluation of alternatives.
CHAPTER III FACTORY OVERHEAD CONCEPT AND ALLOCATION OF FACTORY OVERHEAD.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
Job Design and Work Measurement
7 Design of Work Systems.
JOB EVALUATION MAGNETIC CONTACTORS 1/26/2018.
Activity-Based Costing
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Work Sampling Sections: How Work Sampling Works – part 1
Sampling.
METHOD STUDY Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and.
7 Design of Work Systems.
WORK STUDY WORK MEASUREMENT JOSEPH GEORGE KONNULLY.
Chapter 7 (b) – Point Estimation and Sampling Distributions
Operations Management Work Measurement Supplement 10
METHOD STUDY.
Chapter 25 Time Study Supplementary Material from:
WORK STUDY.
WORK MEASUREMENT.
Distribution of the Sample Means
JOB DESIGN Work Measurement.
Predetermined Motion Time Systems
Predetermined Motion Time Systems (PMTS) BY okolie jude…………
CHAPTER 5 WORK STUDY (12 MARKS).
Unit# 9: Computer Program Development
Predetermined Motion Time Systems (PMTS)
Arithmetic Mean This represents the most probable value of the measured variable. The more readings you take, the more accurate result you will get.
Introduction to Work Measurement
Virtual University of Pakistan
Time Studies Involves timing a sample of a worker’s performance and using it to set a standard Requires trained and experienced observers Cannot be set.
(Lecturer in Mech. Deptt.)
(Lecturer in Mech. Deptt.)
Quick Changeover Techniques
CH-5-Motion and Time Study
Work Measurements Lab # 5.
Production and Operations Management
Summer Training Industrial Engineering Department
Time and Motion Study Rebecca Johnston Operations Management
Presentation transcript:

WORK STUDY WORK MEASUREMENT

Definition of Work Measurement

Objectives and uses of WM OBJECTIVES AND USES OF WORK MEASUREMENT The main objectives of work measurement: 1. Manpower planning. 2. Production planning and scheduling. 3. Estimating productions costs. 4. Cost reduction and control. 5. Rational basis for incentives. 6. Performance appraisal. 7. Training of employees. 8. Comparing alternative methods. 9. Accepting new orders. 10. Fixing the selling cost.

Techniques/Methods/Types of WM

METHODS OF WORK MEASUREMENT 1. Historical data method Historical data method uses the past-performance data. Here, past performance is used as a guideline for setting work performance standards. The main advantage of this technique is that it is simple to understand, quicker to estimate and easier to implement. However, past performance is not the best basis for fixing performance standards. This is because there may be many changes in technology, employees’ behavior, abilities, etc. 2. Time study Time study with the help of a stop watch is the most commonly used work measurement method. This technique was developed by Frederick Winslow Taylor (1856-1915). Time study is best suited for short-cycle repetitive jobs. Most of the production jobs can be easily timed by a time-study. Time study procedure consists of the following steps: Select the job to be timed. Standardize the method of doing the job. Select the worker to be studied. Record the necessary details of the job and conditions of work. Divide the job into elements. Here, ’element’ is a part of the job. Find out the time taken to do every single element. Keep provisions for relaxation, etc. Fix the standard time for doing the job.

METHODS OF WORK MEASUREMENT 3. Work sampling Work sampling method was original developed by Leonard Henry Caleb Tippett (1902-1985) in Britain in 1934. In this technique, the workers are observed many times at random. It is done to find out for how much time the worker is actually on the job. It checks how long he is working and how much time he is not working (idle time). Work sampling method does not involve stop watch measurement. The purpose of work sampling technique is to estimate what proportion of a worker’s time is devoted to work-related activities. Work sampling method involves following three main steps: Deciding what activities are defined as ’working’. Non-working are those activities which are not defined as working. Observe the worker at selected intervals and record (write down) whether he is working or not. Calculate the portion of time (P), a worker is working. A portion of time (P) a worker is working equals to ’Number of observations during which working occurred’ divided by ’Total Number of observations.’ The above calculation is used as a performance standard. Advantages of Work Sampling The benefits or advantages of work sampling method are as follows: Work sampling gives an unbiased result since workmen are not under close observation. A work sampling study may be interrupted at any time without affecting the results. Work sampling can be conducted by anyone with limited training. There is no need to have experts. Team work can be studied by work sampling and not by the time-study. Work sampling is economical and less time-consuming than time study. This is because more than one worker can be studied at the same time. Secondly, observer needs not to be present himself for a long time. Disadvantages of Work Sampling The limitations or disadvantages of work sampling method are as follows: Work sampling is not economical for short cycle jobs. It is also uneconomical to study a single worker or even small group of workers. Unlike time study, it does not allow a small breakdown of activities and delays. Working men may change their normal method of working when they see an observer. Therefore, the results from the work study may not be accurate. In work sampling method, the observations are limited or insufficient. So, the results may not be accurate. This method normally does not record the workers' speed of working.

METHODS OF WORK MEASUREMENT 4. Synthesis method In synthesis method, the full job is first divided into elements (parts). Then the time taken to do each element of the job is found out and synthesized (totaled). This gives the total time taken for doing the full job. In this technique, the time taken to do each element of the job is found out from previous time studies. So, this technique gives importance to past-time studies of similar jobs. It also uses standard data. Standard-data is the normal time taken for doing routine jobs. Standard data is easily available for routine-jobs like fitting screws, drilling holes, etc. So there is no need of calculating these times repeatedly. Most companies use Standard-data. They do not waste time doing studies for all elements of the job. This is because standard time is already available for most elements of a job. For example, a job of publishing a book contains four elements viz; typing, editing, printing and binding. The time taken for doing each element is first found out. Suppose, typing takes 40 days, editing takes 30 days; printing takes 20 days and binding takes 10 days. Then the time taken to do all the elements are totaled. That is, it takes 40 + 30 + 20 + 10 = 100 days to publish a book. This information is taken from previous time studies of other printing jobs or from the standard data. Synthesis technique also considers the level of performance. Level of performance refers to the speed of performance, which is either, normal, fast, or very-fast. The benefits or advantages of synthesis method: It provides reliable information about standard time for doing different jobs. This is because it is based on many past time studies. It is economical because there is no need to conduct new time studies.

METHODS OF WORK MEASUREMENT 5. Predetermined motion time system In ’Predetermined Motion Time System’ method or simply PMTS technique, the normal times are fixed for basic human motions. These time values are used to fix the time required for doing a job. Normally, three times are fixed for one job. That is, one time is fixed for each level of performance. The level of performance may be normal, fast and very-fast. PTMS is better than motion studies because it gives the detailed analysis of the motion, and it fixes the standard time for doing that motion. PTMS technique is used mostly for jobs, which are planned for future. However, it can also be used for current jobs as an alternative to time study. The benefits or advantages of PMTS method: It is a very accurate method. It avoids subjective judgement or bias of rater. It is an effective and economical method for repetitive jobs of short duration. There is no interference in the normal work routine, and so it does not face any resistance from the employees. It helps to improve the work methods because it gives a detailed analysis of the motions. It is more economical and fast compared to normal time studies.

METHODS OF WORK MEASUREMENT 6. Analytical estimating Analytical estimating method or technique is used for fixing the standard time for jobs, which are very long and repetitive. The standard-time is fixed by using standard-data. However, if standard data is not available, then the standard time is fixed based on the experience of the work-study engineer. The benefits or advantages of analytical estimating technique: It helps in planning and scheduling the production activities. It provides a basis for fixing labor rate for non-repetitive jobs. It is economical because it uses standard data for fixing the standard time of each job. One disadvantage or limitation of analytical estimating method: When standard-data is not available for a job, then the standard time is fixed by the work-study engineer. He uses his experience and judgement for estimating the standard-time. This is not accurate compared to a scientific time study. So, these are different techniques of work measurement.

SUMMARY OF WORK MEASUREMENT METHODS AND ITS USES Techniques Applications Unit of measurement 1. Time study   2. Synthetic Data 3. Working sampling 4. MTM/PMTS 5. Analytical estimation Short cycle repetitive jobs Widely used for direct work. Short cycle repetitive jobs. Long cycle jobs/heterogeneous Manual Operations confined to one work centre Long-cycle non-repetitive job. Centiminute (0.01 min) Centiminute(0.01 min) Minutes TMU (1 TMU = 0.006 min)

Method of measuring time with a Stop Watch There are two methods of timing using a stop watch. They are 1.Fly back or Snap back method. 2.Continuous or Cumulative method. Fly back method Here the stop watch is started at the beginning of the first element. At the end of the element the reading is noted in the study sheet (in the WR column). At the same time, the stop watch hand is snapped back to zero. This is done by pressing down the knob, immediately the knob is released. The hand starts moving from zero for timing the next element. In this way the timing for each element is found out. This is called observed time (O.T.) . Continuous method Here the stop watch is started at the beginning of the first element. The watch runs continuously throughout the study. At the end of each element the watch readings are recorded on the study sheet. The time for each element is calculated by successive subtraction. The final reading of the stop watch gives the total time. This is the observed time (O.T.).

Steps in making Stop watch Time Study Stop watch time is the basic technique for determining accurate time standards. They are economical for repetitive type of work. Steps in taking the time study are: 1. Select the work to be studied. 2. Obtain and record all the information available about the job, the operator and the working conditions likely to affect the time study work. 3. Breakdown the operation into elements. An element is a instinct part of a specified activity composed of one or more fundamental motions selected for convenience of observation and timing. 4. Measure the time by means of a stop watch taken by the operator to perform each element of the operation. Either continuous method or snap back method of timing could be used. 5. At the same time, assess the operators effective speed of work relative to the observer’s concept of ‘normal’ speed. This is called performance rating. 6. Adjust the observed time by rating factor to obtain normal time for each element Normal Time = Observed time × Rating ÷ 100 7. Add the suitable allowances to compensate for fatigue, personal needs, contingencies. etc. to give standard time for each element. 8. Compute allowed time for the entire job by adding elemental standard times considering frequency of occurrence of each element. 9. Make a detailed job description describing the method for which the standard time is established. 10. Test and review standards wherever necessary.

Definitions of Standard time Standard time is the time allowed to an operator to carry out the specified task under specified conditions and defined level of performance. The various allowances are added to the normal time as applicable to get the standard time as shown in Fig. 7.6. Standard time may be defined as the, amount of time required to complete a unit of work: (a) under existing working conditions, (b) using the specified method and machinery, (c) by an operator, able to the work in a proper manner, and (d) at a standard pace. Thus basic constituents of standard time are: 1. Elemental (observed time). 2. Performance rating to compensate for difference in pace of working.(PRF) 3. Relaxation allowance. 4. Interference and contingency allowance. 5. Policy allowance.

Components of Standard Time OT – Observed Time PRF – Performance Rating Factor NT – Normal Time PA – Process Allowances RPA – Rest and Personal Allowances (Relaxation Allowance) SA – Special Allowances( Interference and Contingency Allowances) PoA – Policy Allowances PFD – Personal , Fatigue and Delay Allowances = (PA+RPA+SA) The Standard Time is the product of three factors: 1.Observed time: The time measured to complete the task. 2.Performance rating factor: The pace the person is working at. 90% is working slower than normal, 110% is working faster than normal, 100% is normal. This factor is calculated by an experienced worker who is trained to observe and determine the rating. 3.Personal, fatigue, and delay (PFD) allowance. The standard time can then be calculated by using the formula:

Computation of Standard Time Illustrations ILLUSTRATION 1: Assuming that the total observed time for an operation of assembling an electric switch is 1.00 min. If the rating is 120%, find normal time. If an allowance of 10% is allowed for the operation, determine the standard time. SOLUTION: Obsersved time (or) selected time = 1.00 min Rating = 120% Allowance = 10% As we know that, normal time = Observed time × Rating % ÷ 100 = 1.00 ×120 ÷10=1.20min Allowance @ 10% = 1.20 ×10 ÷ 100 = 0.12 min ∴ Standard time = Normal time + Allowances = 1.20 + 0.12 = 1.32 min. ILLUSTRATION 2: An operator manufactures 50 jobs in 6 hours and 30 minutes. If this time includes the time for setting his machine. Calculate the operator’s efficiency. Standard time allowed for the job was: Setting time = 35 min Allowed time per piece = 8 min As standard time = Set up time + Time per piece × No. of pieces produced ∴ Standard time for manufacturing 50 jobs = 35 + 8 × 50 = 435 min = 7 hours and 15 min. Efficiency of operator =Standard time × 100 ÷ Actual time = 435× 100 ÷ 390 = 111.5%.

Computation of Standard Time Illustrations ILLUSTRATION 3: Following datas were obtained by a work study. Man from a study conducted by hours. (i) Maintenance time (a) Get out and put away tools = 12.0 min/day (b) Cleaning of machine = 5.0 min/day (c) Oiling of machine = 5.0 min/day (d) Replenish coolant supply = 3.0 min/day (ii) Interruption (a) Interruption by foreman = 5.0 min/day (b) Interruption by porter etc. = 4.0 min/day (iii) Delay time due to power failure etc. = 6.0 min/day (iv) Personal time = 20.0 min/day Calculate total allowances, total available cycle time productive hours, considering a working day of 8 hours. SOLUTION: Total allowance (sometimes also known as station time) = Total maintenance time + Interruption time + Delay time + Personal time = (12.0 + 5 + 5 + 3.0) + (5.0 + 4.0) + 6.0 + 20.0 = 25.0 + 9.0 + 6.0 + 20.0 = 60.0 min per day ∴ Total available cycle time = Total work period – Total allowances = 480 – 60 = 420 min/day Productive hours =Time available Number of hours = 420 ÷60 = 7 hrs

Computation of Standard Time Illustrations ILLUSTRATION 4: Find out the standard time using the following data: Average time for machine elements = 6 min Average time for manual elements = 4 min Performance rating = 110% Allowances = 10% SOLUTION: Normal time = Machinery time + Manual time × Rating = 6 + 4 × 1.1 = 6 + 4.4 = 10.4 min ∴ Standard time = Normal time + Allowances = 10.4 + 10.4 ×10 ÷ 100 = 10.4 (1 + 0.1) = 11.44 min.