Monitoring & Evaluation Processes A A walkthrough of the whole process
M&C versus M&E Processes Goal or Need Project Lifecycle Phase 1 Phase 2 Phase 3 Phase 4 (Useful Life of the Project) Monitor and Control “Doing things right” Prepare Feasibility Study and Project Plan Design and Monitoring Framework Alternatives Analysis Objectives Analysis Problem Analysis Stakeholder Analysis
M&C versus M&E Processes Project Lifecycle Phase 1 Phase 2 Phase 3 Phase 4 (Useful Life of the Project) Monitor and Control “Doing things right” Design and Monitoring Framework Monitoring and Evaluation Phases “Doing the right thing” Mid-project Evaluation End-of-project Evaluation Outcome Evaluation Impact Evaluation
Monitoring & Evaluation Processes Project Start Mid-term Evaluation Completion Evaluation Outcome Evaluation Impact Evaluation Design and Monitoring Framework Design Summary Indicators & Targets Data Gathering Analyze Data Recommendation or Conclusion Prepare Report Monitoring Mechanism Survey or Observation Assumptions & Risks
The End