Dropped Panel Fatal Incident

Slides:



Advertisements
Similar presentations
Module N° 7 – SSP training programme
Advertisements

Module N° 4 – ICAO SSP framework
1 Welcome Safety Regulatory Function Handbook April 2006.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Accident and Incident Investigation
A Joint Code of Practice Objectives and Summary Presentation
Quality Management Training Quality circles Bench Mark Kaizen.
WHS Considerations for 2014 and Beyond Christian Frost Head of Workplace Health and Safety John Makris Partner – K&L Gates.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
SIEP HSE Management System
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Accident Investigation State of Florida Loss Prevention Program.
Energy Supporting Energy 1 1 DROPS Forum 12 th April 2011 Ron Martin Corporate HSE Advisor.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
ISO 9000 Certification ISO 9001 and ISO
M. Scharfenstein - ES&H Coordinator 8 June 2009
Occupational Health, Safety & Environment Training Incident Reporting & Investigation.
Control environment and control activities. Day II Session III and IV.
Survey results of learners from Bulgaria. Disability Employment is a national priority calling special political and public attention and requiring the.
Dominant underlying factors of work related accidents
Worker Focused Safety Program Violence in the Workplace Worker Training Module 5.
MNM Fatal Fall of Person Accident Fall of Person Accident April 14, 2009 (Missouri) April 14, 2009 (Missouri) Cement Operation Cement Operation.
Elements of Effective Behavior Based Safety Programs
Hazards Identification and Risk Assessment
Grader and Pick up Incident June 30 th, Incident Overview 2  On September 20 th,2011 at approximately 2:30am Dan had just finished filling 3 of.
MNM Fatal Fall of Person Accident Fall of Person Accident September 23, 2011 (New York) September 23, 2011 (New York) Sand & Gravel Operation Sand.
Construction Safety at the UW Ron Fouty, Safety Director Capital Projects Office University of Washington.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
Helping Families update Scrutiny Select Committee Meeting March 2013 Nick Page.
Territory Insurance Conference, resilient future Angela Pilcher, Manager Vocational Management Services PREHAB: Management strategies for the prevention.
Nearmiss Presentation
Job Safety Analysis.
Project Management Starting out. What makes projects different to BAU (Business as Usual)?  Change - Projects are the means by which we introduce change.
Organisational structure. Internal organisation of firms In small firms: Each worker may undertake a range of roles The structure may be informal and.
OHSAS Occupational health and safety management system.
Cross Industry E-Reps Forum Increasing Environmental Awareness and the role of the E-Rep 21 November 2012.
W LTI Final report Shipyard Mokpo Korea / 2013 Steel Plate Dropped Incident Investigation.
COSCAP-SA1 AERODROME CERTIFICATION COURSE AERODROME CERTIFICATION COURSE Safety Management System An introduction to the principles and concepts associated.
ORGANISATIONAL BEHAVIOUR & ITS RELATION TO MANAGEMENT.
Training Needs Analysis WMG 23. Performance Gap (s) / Triggering Event  Farm E-Z  PG = EP – AP  How to probe systematically  The performance framework.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.

Measuring and Reviewing Performance
Maintaining Safety Standards
Maintaining Safety Standards
Implementing the NHS KSF Action Planning and Surgery Session
PDO Second Alert Date: Incident : LTI What happened?
Quarry Operator and Contractor Code of Conduct
Competence Can Do or Have Done!. Competence Can Do or Have Done!
Temporary Works Co-ordination
Unsafe Condition/ Near Miss – Electrical Safety (1)
PIONEER CEMENT PROJECT BEHAVIOR BASED SAFETY !!!.
Director, Quality and Accreditation
Works and Services Supervisor
Regulatory Oversight of HOF in Finland
Safety Management System Implementation
Breakout Session Summary Construction
IPLOCA SAFETY WORKSHOP GENEVA, SWITZERLAND July 1st 2015
Desert Line Project Fatal Incident
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
Effective communication prevents incidents
Always verify isolation before starting any electrical job!
Your safety should always be built on SOLID ground
CEng progression through the IOM3
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

Dropped Panel Fatal Incident - Information provided subject to the 'Conditions for Sharing Materials and Advice' - Dropped Panel Fatal Incident

Terms of Reference To investigate issues associated with and leading up to the fatality that occurred during works being carried out on substation 2901. The investigation is to be as wide ranging as possible but limited within the management influences of CTJV, QG2 project and the 3LNG Management teams.

What Happened? A large, heavy, transom blanking panel, from an installed steel blast door assembly, fell from height during an unplanned task.

Urgent panel removal required to allow access for switch gear Immediate Cause 1. Urgent panel removal required to allow access for switch gear

Loss of control of heavy blast proof door transom panel Immediate Cause 2. Loss of control of heavy blast proof door transom panel

Four men standing on trestle Immediate Cause 3. Four men standing on trestle

Underlying Causes 1 Concerning Urgent Requirement Request from electrical group to bring forward installation. Resulted in a perceived operational pressure on civil group. Driven by requirement to advance a milestone for group morale reasons. No consideration of implications on other groups. Design, installation & acceptance process resulted in a pre-ordained requirement to dismantle a heavy assembly, subject of an un-answered TQ and with no JSA.

Underlying Causes 1 Early installation of door driven by perceived manufacturer’s requirement. Building design and possible financial implications apparent. Departmental liaison issues.

Underlying Causes 2 Concerning Loss of Control of Panel Job was not planned. Construction Manager was unaware. Weight of panel was unknown. Assertive Charge-hand assumed lighter weight and ignored protests, including Safety Officer! Junior Engineer did not exercise direct supervision. Usual Foreman absent on leave.

Underlying Causes 2 Issues of dominant cultures. Resulting issues of operating above competence levels. Poor manpower management & coordination. Indications of poor Change Management.

Underlying Causes 3 Concerning Men on Platform Because of chosen method. Driven by perceived pressure. No JSA in place in spite of clear TQ on drawing. Poor coordination and feedback/audit within management structure.

ROOT CAUSES Poor Interface Management within Joint Venture. Management Commitment not focussed.

RECOMMENDATION 1 Verify that all influencing organisations have the correct level of resource, organisation and structure in place to support the current phase of the project.

RECOMMENDATION 2 Establish through audit the Terms and Conditions that will attract the highest calibre management and supervisory personnel including HSE to manage the verified structure; and allocate necessary resource.

RECOMMENDATION 3 Establish a programme to ensure a project wide climate that truly empowers any worker to stop work for safety reasons without negative response.

RECOMMENDATION 4 Create & Implement an Interface document which confirms responsibilities & accountabilities, processes & procedures used to manage the project.

RECOMMENDATION 5 Validate or create a process that links different group, safety critical work procedures, to prevent conflicting targets

RECOMMENDATION 6 Establish a labour allocation process to align workforce to prevent dominant behaviour through cultural differences.

RECOMMENDATION 7 To establish a competent, integrated project HSE management audit and review programme.