SUBSEA ENGINEERING . DIVING . ROBOTICS

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

COMPANY MAINTENANCE MANUAL
AIR OPERATOR CERTIFICATION
Arts in Science Ltd. 51 Emekuku St., Dline, PO Box 4539, Port Harcourt, Nigeria
National ReUse Conference 2009 Atlanta, GA Presented by Chris Brand President/CEO Friends of Disabled Adults and Children, Too!
Pre-stressed Concrete Initiative By Ken Logan. Pre-stressed Concrete Initiative Background Examination of standards within the industry Production of.
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
Pre-quiz: Test Your Knowledge
Wheelchair and Passenger Restraints Your Logo Here A straightforward presentation to be viewed at your leisure, but not to be ignored. Working with equipment.
Water for Industry Children Challenging Industry.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS ACCIDENT INVESTIGATION Prepared by: Miss Hairul Nazirah Abdul Halim.
Background DIVER-S INTERNATIONAL Co W.L.L. is a modern specialized enterprise. For more than 20 years our company has been carrying out a wide range of.
Abbreviations COP Code of Practise FOP
Safety and Health Programs
Safety and Health Programs
WHS Management Plans.
Permit to Work Procedure Document Number: KOC.SA.004
RECORD KEEPING. AIMS OF THE TRAINING GUIDE This training guide explains:- Why we keep records Our responsibilities What records do we need to keep Penalties.
Occupational Health, Safety & Environment Training Incident Reporting & Investigation.
Gulf of Mexico Simultaneous Operations Safe Work Practice
Identify the Causes 2009 MORT Management Oversight and Risk Tree
Safety & Health Programs.
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
Ministry of the Environment Certificates of Approval for an Anaerobic Digestion Facility Post Construction DIGGING INTO BIOGAS DETAILS WORKSHOP April 5,
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
Health & Safety Policy. HSWA Section 2(3) 5 or more employees (written!) Statement of general policy Organisation Arrangements for implementation Revise.
Unit 1001 Safe working practices in construction © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 2 Know the accident, first.
Division of Risk Management State of Florida Loss Prevention Program.
SAFE/EFFECTIVE USE OF EQUIPMENT AND SUPPLIES PURPOSE To provide guidelines for the instruction of patients and family/caregivers regarding the safe,
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
Safety Management System
ASPEC August 2015 Incidents –0 incidents, 0 near misses Hours 01/08/15-28/08/15 14% Site, 0.6% Travel, 85% Office.
ASPEC December 2015 Incidents –0 incidents, 0 near misses Hours 28/11/15-25/12/15 12% Site, 0.5% Travel, 78% Office.
Cost effective while providing customer focused solutions.
Offshore and Onshore Calibration Why Choose IKM Measurement Services Australia Pty Ltd.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Dive Planning and Management
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
ASPEC July 2015 Incidents –1 incidents, 0 near misses Hours 27/06/15-31/07/15 12% Site, 0.5% Travel, 87% Office ASPEC QSHR July 2015 Minutes.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
The Briggs Group.
Health and Safety Self Assurance Toolkit 2017
Careers in health care facility management
Hazard Identification and Control
Radiopharmaceutical Production
Monitoring, Review and Audit of OHS&E
Senior Vice President, Projects Group
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Construction (Design and Management) Regulations (CDM) 2015
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Reporting Incidents and Hazards Accident Prevention
Risk Management and Mitigation
Most Frequently Cited Serious Violations
Safety & Health Programs
Safety & Health Programs
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Safety & Health Programs
Haynes Bros. Ltd. Environment, Health & Safety
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

SUBSEA ENGINEERING . DIVING . ROBOTICS ATLANTIC MARINE & OILFIELD SERVICES LTD SUBSEA ENGINEERING . DIVING . ROBOTICS 1

2

SUBSEA ENGINEERING SERVICES DIVING, ROBOTICS SURFACE & SUBSEA INSPECTION SUBSEA ENGINEERING NON DESTRUCTIVE TESTING REMEDIATION & REPAIR SERVICES CONSTRUCTION AIR DIVE, INSPECTION (CLASS, UWILD, STRUCTURAL) MAINTENANCE, REPAIR, CONSTRUCTION DIVING, ROBOTICS 2

4

DIVING, SAFETY AND DOCUMENTATION The following documents will usually be provided after any offshore site visit and agreed detailed scope. Risk Assessment - JSA, HAZIDS Safety Plan according to IMCA and HSE UK – DIVING AT WORK REGULATIONS No 2776 Diving project plan Safety and Diving Manual Quality Management and Safety Management System Insurance policies Management of change procedure Equipment certification and Manual Plant and equipment maintenance Emergency and contingency plans

6

DIVE, SAFETY AND DOCUMENTATION contd. Crew and personnel certification list (dive team, project supervisor) to IMCA standard Supervisor and dive team briefing/awareness on project Near-miss and incidents/accidents reporting forms, investigation and follow-up First aid and medical treatment of personnel Clear reporting and responsibility structure Regulations/standards compliance (IMCA)

8

IN-WATER SURVEY CLASS WORK STANDARDS: ABS DNV HSE Health & Safety (Diving at Work Regulations 1997) OGP Guidelines IMCA standards

10

11

DIVERS CLEANING TECHNOLOGY USED HP HYDRO JET BLASTING LP WATER JETTING GRIT ENTRAINMENT MOTORIZED BRUSHING CAVITATION

WATER JETTING BY DIVER

DIVERS HAND BRUSH CLEANING AND GVI/CVI

MOTORIZED BRUSHING AS-T15 TWIN HEAD UNIT DIVER OPERATED OPERATES WITH 2no 15” DIAMETER BRUSHES AND AT PRESSURES UP TO 2,000psi CLEANS FOULING UP TO 2” THICK 30” LATERAL SWATH OPERATING DEPTH: 110ft (33m)

GRIT ENTRAINED CLEANING

CHAIN CLEANING WITH DIVER OPERATED CAVIBLAST UNIT

23

25