Shatskaya M, Abramov A. , Fedorov N. , Kostenko V. , Likhachev S

Slides:



Advertisements
Similar presentations
Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
Advertisements

Connecting Academic Networks The ORIENT, TEIN and GÉANT Projects: International Research Networks John Chevers, DANTE International eVLBI Workshop Shanghai,
Cloud computing in spatial data processing for the Integrated Geographically Distributed Information System of Earth Remote Sensing (IGDIS ERS) Open Joint-Stock.
EMS ROMC Environment monitoring system for ROMC..
RC & M Remote Control and Management System System of remote control and monitoring of telecommunication network sites RC & M Remote Control and Management.
A new Network Concept for transporting and storing digital video…………
Enhancing protection for the most valuable assets of the Knowledge Economy.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Planning for the Virtual Observatory Tara Murphy … with input from other Aus-VO members …
APTA, Kevin Hassett, September 24, APTA Passenger Information Systems.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
Marcin Okoń Pozna ń Supercomputing and Networking Center, Supercomputing Department e-Science 2006, Amsterdam, Dec Virtual Laboratory as a Remote.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Date donald smits center for information technology Centre of Information Technology RUG Robert Janz Centre of Information Technology University.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
Physical Infrastructure Issues In A Large Centre July 8 th 2003 CERN.ch.
Research Networks and Astronomy Richard Schilizzi Joint Institute for VLBI in Europe
The International Space Environment Service (ISES) Joe Kunches Secretary for Space Weather, ISES Space Weather Week 2005 April 6,2005.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
The LHC Computing Grid – February 2008 The Challenges of LHC Computing Dr Ian Bird LCG Project Leader 6 th October 2009 Telecom 2009 Youth Forum.
RadioAstron space VLBI mission: early results. XXVIII GA IAU, Beijing, August RadioAstron space VLBI mission: early results. XXVIII GA IAU, Beijing,
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Datacenter Energy Efficiency Research: An Update Lawrence Berkeley National Laboratory Bill Tschudi July 29, 2004.
Power and Cooling at Texas Advanced Computing Center Tommy Minyard, Ph.D. Director of Advanced Computing Systems 42 nd HPC User Forum September 8, 2011.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
Shatskaya M, Abramov A., Fedorov N., Kostenko V., Likhachev S., Seliverstov S., Sichev D. Astro Space Center, P. Lebedev Physical Institute, RAS, Moscow,
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Presentation Title Presentation subtitle Your name Your title, organisation.
Metal Working Group Metals: conservation and Research - Brussels, October 2003 The ICOM-CC Metal Working Group as a promoter of research in metal.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
SA1: overview, first results
Video Security Design Workshop:
RFI Protection Activities in IAA RAS
WP18, High-speed data recording Krzysztof Wrona, European XFEL
RFI Protection Activities in IAA RAS
Building the Square Kilometer Array – a truly global project
e-VLBI: Creating a Global Radio Telescope via High-Speed Networks
DIRECT IMMERSION COOLED IMMERS HPC CLUSTERS BUILDING EXPERIENCE
The Institute of Applied Astronomy of the Russian Academy of Sciences Operating experience of Data Transmission and Buffer System. Research of.
CERN Data Centre ‘Building 513 on the Meyrin Site’
Data Center Service Brian Messenger 11/15/2016.
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
eInfrastructures: Usage Policy
The Most Visited Countries
DIRECT IMMERSION COOLED IMMERS HPC CLUSTERS BUILDING EXPERIENCE
Grid Computing.
EGEE NA4 Lofar Lofar Information System Design OmegaCEN
Visit:-
Cloud Computing Data Centers
Astro Space Center of Lebedev Physical Institute, Moscow
Moxa Embedded Solution on IEC 61850
Cloud Computing Data Centers
Renewable energies in Russia
User interaction and workflow management in Grid enabled e-VLBI experiments Dominik Stokłosa Poznań Supercomputing and Networking Center, Supercomputing.
Figure 6 Schematic diagram of the CAT system
Airborne Internet.
Comparison: Ginna 480 MW Installed PV Power as of the end of 2005
Computer Networks Protocols
Presentation transcript:

DEVELOPMENT OF IT TECHNOLOGIES FOR SCIENTIFIC EXPERIMENTS WITH RUSSIAN SPACE TELESCOPES Shatskaya M, Abramov A., Fedorov N., Kostenko V., Likhachev S., Seliverstov S., Sichev D. AstroSpace Center, P. Lebedev Physical Institute, RAS, Moscow, Russia P.N.Lebedev Institute Astrospace Center

Data processing center for space VLBI project Radioastron. July 2011 Now working project. Data processing center for space VLBI project Millimetron. Future project. P.N.Lebedev Institute Astrospace Center

The aims of Data Processing Center Radioastron project The aims of Data Processing Center Organization of service information exchange. Collection and storage of all scientific information of observations. Processing of scientific observation data. P.N.Lebedev Institute Astrospace Center

Data Transferring Service information Scientific Data Radioastron project Service information Scientific Data Coordination of schedule, cyclogramas, observations reports, telemetric data, orbit data and others Data of observation from telescopes on-line and prompt delivery of data delivery with delay from a day to 0.5 year Uninterruptible service of the all systems: communication channels, the server high availability and efficiency, High quality of channels (UDP) Redundancy of delivery (telemetric data is delivered via 2 channels by UDP and via Internet by TCP) but small volume of data (less than 3 TB on 6 years period). Low capacity of communication channels (2 Mb/c), Large volume of data High capacity of communication channels and servers but High demands on the efficiency and uninterrupted operation are not imposed

More Than 40 Ground Telescopes Radioastron project GBT USA Medicina Italy Tidbinbilla Australia Urumqi China Noto Italy Arecibo Puerto Rico Usuda Japan Westerbork the Netherlands ATCA Australia Effelsberg Germany Hart Africa Svetloe Russia Robledo Spain Yebes Spain Badary Russia Zelenchuk Russia Onsala Sweden Jodrell Bank UK Parks Australia Torun Poland Shanghai China et al.

Features of DPC of Radioastron project Standard VLBI Radioastron Processing Center Equipment MARK5, disc packs Computers, servers Network, channels GEANT, high speed dedicated channels, delivery on disc packs Public Internet 600 Mb/s Sometime delivery on discs Protocol JIVE5ab Tsunami, ftp Deleting of raw data yes no

Structure of Data Processing Center Radioastron project Total amount of data in Processing Center 2700 TB

Data Processing Center Radioastron project P.N.Lebedev Institute Astrospace Center

Expected July 2011 Nowadays 2017 Radioastron project Expected July 2011 Nowadays 2017 Ground Telescopes 5 40 Worked Simultaneously 2-3 Up to 30 Tracking stations Pushchino Pushchino + Green Bank Number of observations per month 20 120 Storage 100 TB 1 PB on line 6 PB off line DAS Direct Attached Storage NAS Network Attached Storage Dividing of processes of data collecting and archiving and processing Deleting raw data Yes No

Radioastron project Spontaneous growing of storages and amount of computer technique, reprocessing of data overflow of: heating weight of equipment space of server room.

New server room Weight of equipment 6000 kg 8 server racks Radioastron project Weight of equipment 6000 kg 8 server racks Input electric power 80 kW with redundancy Fire-extinguishing system Scalable cooling system

Deformational Model Radioastron project We carried out investigation and calculation of safe load carrying ability of the floor.

Distribution of Weight Radioastron project We laid special cover of the floor and metal frame for distribution of weight.

Data Processing Center of Millimetron Project Space telescope Control stations Tracking station Ground telescopes Data processing center Center of experiment planning Ballistic center Tracking headquarters Scientific centers and users

Amount of Expected Information Millimetron project Total amount from tracking stations and 3 ground telescopes: 150 PB per year According to 2014 Technological Workshop in Groningen 80 PB per 5 years

Data Center for Millimetron Project Appropriate room or special building with protection from leaking and fire-extinguishing system Redundant power supply Independent power supply (diesel generator) Uninterruptible power supply Air-conditioning on N + 1 systems Video surveillance and monitoring of all systems Room for operators Communication channels Expected parameters: Data 150 PB per year Electric power about 1.3 MW 60 racks 500 - 600 m2 40 Gb/s 100 Gb/s Millimetron project

Conclusions Operation of Data Processing Center for Radioastron project is not standard for VLBI, nevertheless DPC fully adequate to requirements of the Mission. DPC is dynamic and growing system. Nowadays we are working on planning and calculation of parameters of DPC for Millimetron project. Our experience of Radioastron will be useful for our next project "Millimetron“.

THANK YOU!