SOLEIL synchronization system

Slides:



Advertisements
Similar presentations
M.-A. Tordeux, ESLS XXII, November 2014, GrenobleFEMTO-SLICING project at SOLEIL 1 Femto-Slicing project at SOLEIL M.-A. Tordeux on behalf of the.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Beam Instrumentation for Orbit Stability I. Pinayev.
IPBSM status and plan ATF project meeting M.Oroku.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
M. Labat, SOLEIL Journées Accélérateurs, Roscoff, Octobre Femtoslicing at SOLEIL M. Labat, M.A. Tordeux, M.E. Couprie, A. Nadji,
ESRF interest & commitment to (ultra-) fast science with X-rays Kees Scheidt Diagnostics group, Machine division.
1 Fulvio TESSAROTTO CERN, 20/03/ GDD Meeting - Contribution from Trieste FIRST LOOK AT THGEM IN TRIESTE LAB. The set-up to measure currents THGEM.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Stéphanie Hustache-Ottini S LEIL SYNCHROTRON iWoRID 2011 – 140 – July 5 th Towards ps and fs diffraction with the XPAD detector S. Hustache-Ottini 1, J.-C.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Operations Machine Simulator.
Synchronization issues
Status of SPARC synchronization system and possible upgrades
LCLS_II High Rep Rate Operation and Femtosecond Timing
Experiments on Fast Ion Instability at PLS
LCABD WP 4.2 – Spectrometer and BPM Studies
M.J. Barnes : Canadian Involvement with LHC
Sara Thorin, MAX IV Laboratory
Status of Interlock BPM
SLS-2 – Ugrade of the Swiss Light Source
SLS Timing Master Timo Korhonen, PSI.
Simulations of collimation losses at RHIC
Status of the Beam Phase and Intensity Monitor for LHCb
Timing and synchronization at SPARC
RF Synchronisation Issues
Status of Synchronization System
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
WP02 PRR: Master Oscillator and RF Reference Distribution
Controls CBETA controls will extend existing EPICS control system
6D Characterization of Witness Beam before Injection in LWFA
QUARTIC TDC Development at Univ. of Alberta
MERIT beam intensities
The Storage Ring Control Network of NSLS-II
Machine Operation and Progresses in SSRF
ERL working modes Georg Hoffstaetter, Professor Cornell University / CLASSE / SRF group & ERL effort High Current mode High Coherence mode High Buch charge.
String-21 Flasher Analysis
FPGA Based Trigger System for the Klystron Department
Monday February 28th 8h00: Injection
Operation Progress and Upgrade in SSRF
Low Emittance Tuning David Rubin Cornell Laboratory for
Feed forward orbit corrections for the CLIC RTML
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Jim Clarke ASTeC Daresbury Laboratory March 2006
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Present Status of Orbit Stabilization at SPring-8
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Fast Orbit Feedback at the SLS
Breakout Session SC5 – Control Systems
A. Agui, T. Nakatani, A. Yoshigoe (JAERI/SPring-8),
Presentation transcript:

SOLEIL synchronization system upgrade for Beamlines

Two upgrades were added to SOLEIL’s synchronization system to fulfill Beamlines needs: Top-up gating Slicing synchronization

Top-up gating

Current in the storage ring Since March 2009, SOLEIL is working in top-up mode. The orbit perturbation is kept below 1/10 of the beam transverse size: 70 µm RMS amplitude in horizontal and 40 µm RMS in vertical. Top-up injection 431,7 mA 429,7 mA #2 - 5 mn Current in the storage ring

Top-up mode is used with all filling patterns:

This is done with very classical Master / Slave synchronization system. Some Beamlines wish to freeze their acquisition during the injection.  The TimEX3 board was developed for that purpose.

The Top-up gating allows them to stop the data acquisition during the injection or beam lost. Beam lost Pre top-up Pre top-up Pre top-up 2s 2s 2s OUT 0 t1 t2 t1 t2 t1 t2 OUT 1 t3 t4 OUT 2 t1 t2 t1 t2 t3 t4

Today, it is used on 3 Beamlines: SMIS (IR), AILES (IR), Nanoscopium. SMIS results: "… This has results in an increase of the S/N of the spectra by a factor between 12 and 15! …"

The TimEX3 board was developed as an open hardware project. All source files (CAD, EDA, Gerber, VHDL, etc.) are available on CERN’s Open Hardware Repository and may be used under the CERN’s open hardware licence. [http://www.ohwr.org/projects/timex3/wiki].

SLICING synchronization system upgrade

The aim of the Femto-Slicing project at SOLEIL is to generate 100 fs X-rays pulses on two beamlines, CRISTAL and TEMPO, for pump-probe experiments. CRISTAL, TEMPO DEIMOS, GALAXIES SEXTANTS 75 fs 140 fs 80 fs Wiggler CRISTAL (U20) TEMPO (HU44 + HU80) DEIMOS (HU52 + HU65) GALAXIES 300 fs Laser Beam 210 fs

The laser and the beam delay offset are adjusted by IQ modulator.

The laser and the beam delay offset are adjusted by IQ modulator. Claire Laulhé “Test of a laser synchronization system using an IQ modulator” : ”The main results are reported below: 1) Accuracy on relative delays: +/- 1.5 ps (after correction of systematic phase errors) 2) Precision on relative delays: +/- 2.5 ps 3) Timing drifts were evidenced, directly linked to temperature changes : 2.5 ps/°C. This is the reason why we talk about relative delays in points 1) and 2). 4) Jitter on the signal sent to the laser: 4 ps rms”

It works!! First laser / beam interaction observed on CRISTAL Beamline September 29, 2015.

But we can improve the current IQ synchronization system.

SOLEIL / MAX IV collaboration. Improvements: Reducing cables lengths. Improving the power supplies. Temperature stabilization. Better resolution. First prototype expected 2016.

Thank you for your attention