SeaPerch Structural System

Slides:



Advertisements
Similar presentations
Ship witch. Designing the ship in a computer program AUTO CAD.
Advertisements

Step-by-step assembly instructions
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
11/15/99Norm Herr (sample file) Making a Quadrant The quadrant is a device for measuring the altitude of an object (the angle of elevation of an object.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Group B01 Tarek Yakub – Fahad Aljenaei – Danish Qureshi
Pneumatic Arm Assembly Instructions
A 2 element 6 Meter Quad Made from PVC pipe and capable
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
How to Make a Marshmallow Shooter By Pierce H..
Can Challenge- How we made the can and materials we used
SeaPerch Design Challenge and Construction Overview.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
THE ROV CHALLENGE. What is an ROV? ROV = Remotely Operated Vehicle Unoccupied, remote controlled submersible vehicle Used in deep and shallow underwater.
Buoyancy What is buoyancy? The ability to float..
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
IOT POLY ENGINEERING SP-2 Lesson designed by Mick Scott, Baltimore Polytechnic Institute, References (for pictures, ideas,
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
Step-by-step assembly instructions
Jeopardy Grade 8 Science.
Left side Right side Note pad Roll block. The Plan.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
{ Catapult Project. We started with just a ¾ inch piece of pvc pipe and decided we needed it more rigid.
What’s in the Box?
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Free Body Diagrams. Weight Free Body Diagrams Net Force Present.
What is today’s topic? Instructions: Use this phone pad diagram as the key to unlocking the topic for today. Example 4 is either G , H , I “
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
Objectives -Together we will discuss the forces at work when an object is submerged -We will understand why things float and why they sink -We will apply.
The tuning mechanism: Left—variable capacitor with a 1.5:1 built-in vernier reduction drive; Middle—a 10:1 vernier reduction drive; right—a crank knob.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Assembly of steering.
Rear end assembly.
Place template on top as guide for cutting
SeaPerch Structural System
Teknologi Dan Rekayasa
Catapult.
Portable Vacuum Cleaner
Strings and Rings.
Mounting Servos and Black Gear Motors in Botball Robots
Introduction to the Lathe Machine
Step-by-step assembly instructions
Step-by-step assembly instructions
Induction Motor. Induction motor Main parts are Stator Rotor.
What’s in the Box?
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Energy Conversion and Transport George G. Karady & Keith Holbert
Assembly instructions for M-K all bolt together hoppercone kit.
SeaPerch Structural System
Step-by-step assembly instructions
Tool ID Week 7 Clamps and Vises.
Step-by-Step Assembly Instructions – Cube Version
Super Structures Making a geodesic dome Image is from OpenClipart.
SeaPerch Structural System
The blades.
Step-by-step assembly instructions
Clamping and Boring Tools
Step-by-step assembly instructions
BUILDING AN AUTONOMOUS QUADCOPTER.
Educational Power Point by D&T Within Schools
Turning Between Centres
Presentation transcript:

SeaPerch Structural System

Structural Technology Technology of putting mechanical parts and materials together to create supports, containers, shelters, connectors and functional shapes.

What makes a structure? Supports a load. Resists various forces. Holds elements in a relative position to other parts.

What happened?

Standard PVC Frame Parts. Measure, mark, and cut the pieces as identified in the diagram.

Modified Structural System If you developed a modified structure, you will need to determine the length of each piece of PVC pipe. The pipe fits into the connector ¾”. This means that you will need to add 1 ½” to the length of the pipe, if you have a connector on both ends.

Any Questions?

Create the drain holes. Secure the connector. Drill ¼” hole in each elbow.

Assemble the frame. Assemble the pipe pieces with the connectors. Do not glue the pieces together.

Assemble the floats. Use the H-bar to hold the 2 floats.

Mount the motors. Mount the motors to be able to move the ROV left, right, up, and down. The angle may be adjusted by rotating the pipe position, as the pipe is not glued.

Attach the netting. The netting will hold weights (ballast) to obtain neutral buoyancy.