Project Management at CERN

Slides:



Advertisements
Similar presentations
Research Integration Changing Knowledge and Disciplinary Boundaries through: Integrative Research Methods in the Social Sciences and Humanities Funded.
Advertisements

Experiences of private sector participants in Marie Curie Actions - Partnering in ITN project Marie Sklodowska Curie Actions Bridging Business and Research.
Research and Innovation Summary of MS questions on the Commission's proposal for DG Research & Innovation Research and Innovation Rules for Participation.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 11 Augmented Reality Platform for Advanced Maintenance in Scientific Facilities Héctor.
The view from Europe Paola Gargiulo – CASPUR (and Valentina Comba University of Bologna – Italy) Fiesole Collection Development Retreats Fiesole 2004 March.
Strengthening the IST Research Capacity of Sofia University SISTER project – WP2A tasks Sylvia Ilieva Department Software Engineering FMI, Sofia University.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Organisation Européenne pour la Recherche Nucléaire European Organization for Nuclear Research Laboratoire Européen pour la Physique des Particules European.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut.
Start date: September 2010 Duration: 36 months Website: Funding Scheme: FP7 Research for the Benefit of SME-AGs The research.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
EXperimental Infrastructures for the Future Internet Process for Joining Infrastructure Owners Training - Basic.
The Iterative Process of Project Planning 13 Structure the project
Collaborative planning and scheduling: towards an application of the ALARA principle in the intervention planning and scheduling phase. Mathieu Baudin,
Project Management at CERN Pierre Bonnal Engineering Department RIGI CERN.
Overview of WP1 at a Glance Pierre Bonnal Engineering Department Scientist-in-Charge for CERN.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Towards an Enhanced Quality Management Framework for the A&T Sector Pierre Bonnal EN-MEF.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
ICT Work Programme Objective 4.2 Technology Enhanced Learning European Commission, DG Information Society and Media Unit E3 – Cultural Heritage.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 9 Study of a logistic concept for Super-FRS RH components Faraz Amjad Helmut Weick.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland Puresafe contributions to telerobotics WP2 and WP3 results Manuel Ferre Universidad Politécnica.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TRAFOON project is funded by the European Community's Seventh Framework Programme (FP7/ ) under grant agreement no Mrs. PATRICIA MORA GESTIONA.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
1 Final Conference, 19 th – 23 rd January 2015 Cern, Switzerland PURESAFE Preventing hUman intervention for IncREased SAfety inFrastructures Emitting ionizing.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
Human Society and its Environment K-6 (HSIE) Using the syllabus for consistency of assessment © 2006 Curriculum K-12 Directorate, NSW Department of Education.
The impact on practice, costs and outcomes of New Roles for health professionals in Europe (MUNROS) Antoinette de Bont Erasmus University Rotterdam European.
Project Management and Quality Assurance Support Pierre Bonnal on the behalf of the members of the newly created EN-MEF-QOP section.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
TRAFOON project is funded by the European Community's Seventh Framework Programme (FP7/ ) under grant agreement no Strategic Research and.
Policy on the Management of Intellectual Property in Technology Transfer Activities at CERN CERN/FC/5434/RA Technology Transfer Network Meeting – 10 th.
Neutron Chopper Technologies Work Package
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
NCP INFODAY, Brussels, 23 June 2010 NCP INFODAY, Brussels, 23 June 2010 Objective ICT EU-Brazil Research and Development cooperation Augusto.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
BrightnESS is funded by the European Union's Framework Programme for Research and Innovation Horizon 2020, under grant agreement Building a Research.
Quality Management at CERN Pierre Bonnal Engineering Department.
ESS Innovation Procurement Workshop
Frameworks for Sensitive Data in the Research Lifecycle
European-Comparative Effectiveness Research on online Depression Treatment E-COMPARED is funded by the European Community’s Seventh Framework.
Prototyping with industry WP5: Round Table Discussion
The European Centre for Modern Languages of the Council of Europe
BESTF Webinar Wednesday, 12th December, 2012 Merlin Goldman, High Value Manufacturing team Graham Mobbs, International team Ewa Bloch, National Contact.
TIARA WP5 Survey Results
Beam Dump outline work plan (UK perspective)
Low temperature chiller Market Survey
Software Engineering D7032E
EWF - European Federation for Welding, Joining and Cutting
20 years of EU and other inter-national (solar) energy projects
Dependability management in automated border control
ESSnet on Linked Open Statistics
 Vice Presidency for Research EPFL Presentation - Public | 2017.
September 2015 – September 2017 Contractual obligations fulfilled & project on schedule and budget GA approval for both years 1st periodic report ‘approved’
Perspective of an International Research Center
Welcome to the 3rd Stammtisch for female physicists at KIT
Executive Project Kickoff
Socio-Economic Impact of ESS
Presentation transcript:

Project Management at CERN Pierre Bonnal Engineering Department

Pierre Bonnal - Design Society @ CERN = 15 early-stage researchers GSI FAIR (Germany) CERN (Switzerland) TUT (Finland) UPM (Spain) KIT (Germany) Sensetrix (Finland) bgator (Finland) Oxford Technology (UK) The research leading to this framework has received funding from the European Commission under the FP7 ITN project PURESAFE, grant agreement no. 264336. ESS (Sweden) ECP (France) LASS (France) A&M ParisTech (France) U. de Savoie (France) 2015-03-06 Pierre Bonnal - Design Society @ CERN

The need: A systems engineering (SE) framework suited to scientific facilities and systems that are subject to ionizing radiations The preferred solution: Participative-based every project/systems engineer contributes actively to managerial tasks Lean thinking-based enhance outcome value while limiting waste Open source-based creative common license 2015-03-06

Pierre Bonnal - Design Society @ CERN Editorial Content Guidelines, Standards, Specifications, SW, etc. Improvement of the editorial content 2015-03-06 Pierre Bonnal - Design Society @ CERN

cern.ch/openSE Not yet openSE.org

Pierre Bonnal - Design Society @ CERN Lifecycle A common understanding of a facility or system lifecycle 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN Processes A common understanding of key processes Systems Engineering processes: gathering needs and defining requirements, systems architecting and modelling, verifying & validating, managing product risks, managing configuration & quality Project Management processes: scoping, planning and scheduling, costing, managing project risks, supplying components Design and Engineering processes: DfS, DfE, DfMA, DfP, DfC, DfO, DfR, DfA, DfM, DfT/DfRH* * Design for Telerobotics / Design for Remote Handling 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN Roles A common understanding of roles and responsibilities 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN Results A common understanding of the expected results The systems or the facility indeed The means for “ORAMS’ing” them Information, documentation 2015-03-06 Pierre Bonnal - Design Society @ CERN

Will Project Planning & Scheduling 2.0 (PDM 2.0) be next? 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN Planning & Scheduling 2.0 Mathieu Baudin’s PhD thesis (A&M ParisTech) Algorithms developed and prototype working Algorithms tested at GSI FAIR Darmstadt Will they be embedded in IMPACT? Will they be embedded in commercial packages? 2015-03-06 Pierre Bonnal - Design Society @ CERN

Pierre Bonnal - Design Society @ CERN CERN has always been on the cutting edge in matter of particle physics CERN has always been on the cutting edge in matter of technologies CERN has also always been on the cutting edge in matter of project management 2015-03-06 Pierre Bonnal - Design Society @ CERN

Thanks.