CHANGE CONTROL.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Transition from Q1- 8th to Q1- 9th edition
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Standard Operating Procedure What is an SOP? Who should Write? Format and Content of SOPs How to Implement Managing Change Control Who is Responsible?
Contractor Safety Management
Fundamentals of GMP Maintenance Ensuring a GMP Compliant Maintenance Program PQuality Preventive Maintenance Procedures are a requirement to properly qualify.
Define ● Deliver ● Sustain Sundar Chellamani Technical Director SysComm Project Management Ltd.
CUMC IRB Investigator Meeting Human Subjects Research Non-Compliance September 15, 2005.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
FIELD COMPLIANCE UPDATE CDR Thomas R. Berry, RPh FDA, Investigator RAL-RP / ATL-DO.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
Management of Change Control. Overview Changes – Good or bad? Forced or voluntary? The Importance of Change Control Major Changes to both legacy company.
Personnel Basic Principles of GMP Workshop on
Validation Chapter 4 1. Validation Exemplifies Process Understanding 2.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
ASEAN GMP TRAINING MODULE PERSONNEL
1 Supplements and Other Changes to an Approved Application By: Richard J. Stec Jr., Ph.D. February 7, 2007.
PRODUCT TRANSFER.
Important informations
Prime Responsibility for Radiation Safety
© Mahindra Satyam 2009 QMS Training Conducting Contract Review.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
QUALITY MANAGEMENT STATEMENT
Dispensary and Administration Site Information Presentation.
Comparability Protocols Lore Fields MT(ASCP)SBB Consumer Safety Officer DBA/OBRR/CBER September 16, 2009.
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
1 City of Shelby Environmental Management System -QUALITY ALWAYS- IT’S ABOUT THE PEOPLE Presented by: Cynthia I.Walters Presented by: Cynthia I.Walters.
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
1 Auditing Your Fusion Center Privacy Policy. 22 Recommendations to the program resulting in improvements Updates to privacy documentation Informal discussions.
Responsibilities of Sponsor, Investigator and Monitor
Personnel.
Risk Assessment Beginning an Analysis Date by Jim Bowman.
DOCUMENT AND DATA CONTROL
POST APPROVAL CHANGE MANAGEMENT PROTOCOLS IN THE EUROPEAN UNION
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
Software Quality Control and Quality Assurance: Introduction
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Responsibilities of Sponsor, Investigator and Monitor
Regional Skills Forum 2016:
IRB reporting updates.
WP 3 How to assess implementation of ALARA
Readiness Review Course
Quality Assurance and Quality Control in Generics
PREPARATION FOR GMP INSPECTION
Flooding Walkdown Guidance
U.S.D.A. FOREST SERVICE REGION 6
Introduction to Internal Audits
GMP Inspection Process
Management of Change Report Errors to Management.
CLINICAL INFORMATION SYSTEM
Registration Process for new messages
Fast Track Maintenance Process (for existing messages)
11/30/2018 Approved Evaluator Training Provider on the Colorado State Model Evaluation System Application Process November 2016.
Yearly Maintenance Process (for existing messages)
Standard Operating Procedures and Termination Procedures
Program Design Addendum Process
How to conduct Effective Stage-1 Audit
QA Reviews Lecture # 6.
PREREQUISITE PROGRAMS
Pharmacovigilance inspections: what HPRA expects
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

CHANGE CONTROL

Definition Change control is a formal system by which a qualified representative of appropriate disciplines review proposed and actual changes that might affect the validated status. The intent is to determine the need for action that would ensure that the system is maintained in a validated state.

Types of Change control 1 – Minor change is a change that has minimal potential to have an adverse effect on identity, strength, quality, purity, or potency of the product as they may relate to the safety or effectiveness of the product. 2 – Major change is a change that has a moderate potential to have an adverse effect on the identity, strength, quality, purity, or potency of the product as they may relate to the safety or effectiveness of the product. 3- Critical change is a change that has a substantial potential to have an adverse effect on the identity, strength, quality, purity, or potency of a product as they may relate to the safety or effectiveness of the product.

Levels of approval of Change control “Level -1 signifies level of approval required to approve a change” Initiator department and the quality assurance department only e.g. SOPs related to single department like operating procedure of equipment’s, cleaning procedure of equipments, etc.

Levels of approval of Change control “Level -2 signifies level of approval required to approve a change” Initiator department and all other interlinked departments within the plant e.g. Change in SOPs which are being followed at different departments at plant level.

Levels of approval of Change control “Level -3 signifies level of approval required to approve a change” Initiator department and all other relevant departments (within plant or outside the plant) including marketing, RA and Quality and Compliance, etc. e.g. Change Controls which include change in specifications /STPs / GTPs / Artworks / License related issues / BMR / process change / Vendor change, etc These type of changes may require company’s R.A. department to ask for approval of regulatory agency(ies) that have impact on regulatory dossiers submissions.

Procedure of Change Control Fill the from Initiator department, date, Name & Designation and proposed changes along with proper justification and assess the need of training Head of initiator department shall assess the type of change and changes required in the interlinked documents and finally countersign on the proposal. Any personnel can propose a change through “CHANGE CONTROL FORM” Once the form has been signed by the initiator’s department head / designee, the same shall be forwarded to QA. QA personnel shall evaluate the basic requirements of the change control and assess whether change control requires comments / approval from Level 1/2/3. QA personnel allocates a unique number to the change control and log the same number in the “Record of Change Control”

Procedure of Change Control Comments on the change control can be asked from out-stationed departments through email/fax All the Concern Department Heads/Designee shall evaluate the change control at their respective ends and give their comments and submit back to QA for further action plan. After that QA personnel shall circulate the change control for approval to different department Heads or designee. Head QA or Designee shall approve or reject the change controls based on the sound scientific assessment. After approval Head QA / designee, QA personnel shall send the change intimation to all concerned department heads / designee for planning the implementation of the change control through electronic means of communications. After approval of change control, QA Personnel shall evaluate the implementation of same and shall close the change control only after all documents or any activity mentioned in the change control is closed.

Steps of change control Documenting the change request Formal assessment of the change Proper Planning and timeline Final Impact assessment of the change Implementation of change Final assessment after Implementation

Steps of change control Documenting the change request: When any change is proposed, the request form is filled and change is categorized in minor, major, critical and recorded, along with informal assessments of the importance of that change and the difficulty of implementing it.

Steps of change control Formal assessment of the change The justification for the change and risks and benefits of making/not making the change are evaluated. If the change request is accepted, a change control review team will be assigned. If the change request is rejected, that fact is documented and communicated to the Initiator.

Steps of change control Proper Planning and timeline The review team responsible for the change reviews approval or rejection, implementation and plans properly for its implementation within timeline.

Steps of change control Final Impact assessment of the change The review team does correct impact assessment of the change with respect to GMP. If the change is found to have no impact on GMP and it is improving for the system, then the review team requests approval and gives the timeline for implementation.

Steps of change control Implementation of change The review team also verifies the implementation status of the change after approval and the timeline of the change implementation.

Steps of change control Final assessment after implementation If the initiator, review team and QA are satisfied that the change was implemented satisfactorily, the change request is closed.

REMEMBER! If a Change Control is pending for approval for more than 30 working days from the date of login, it is the discretion of Head QA or designee to approve or reject the change control. QA personnel shall take the re-evaluation of the change controls after every three months or need based.