Status Report RAN WG6 to TSG-RAN #73

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications Evolution of TD-SCDMA China Communications Standards Association (CCSA) Chicago, May 29th to 2nd June,
Advertisements

3GPP TSG GERAN OUTCOME OF GERAN WG4#8 Radio Aspects 5-7, February Rome, Italy.
© NOKIAProduced as informative material for 3GPP RAN WG1 meeting No. 2 Downlink Shared Channel - DSCH DSCH associated with a dedicated channel (DCH) Downlink.
All you always wanted to know about 3GPP … but were too afraid to ask.
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
1 Progress made in specifying the GERAN Andrew Howell, Chairman (Motorola) Marc Grant, Vice-Chairman (Cingular Wireless)
1© Nokia Siemens NetworksSeminaariesitelmä / Jukka Valtanen / Transport Formats in UMTS Radio Network Controller’s Software Implementation Seminaariesitelmä.
Project Planning Committee (PPC): Session #70 WG Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
LTE Mobility. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text.
C xx2 Summary of Conference Call – Feb 8 Reviewed contribution C r3 to recap the status of evaluation criteria document Sections in.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Doc.: IEEE /1292r0 Submission November 2008 George Bumiller, Research In MotionSlide 1 3GPP use of the TGu Interworking with External Networks.
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation WG FM Correspondence Group on GSM-R ETSI & GERAN update on ER-GSM band.
1 Presentation Title 3GPP WORK ON 5G Presenter Erik Guttman Session
Korean Intellectual Property Office – ICU seminar Ha, Jeongseok March 7, 2007 School of Engineering, Information and Communications University Wideband-CDMA.
1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP
Doc.: IEEE /1060r1 Submission September 2013 S. Rayment, Ericsson & S. McCann, BlackBerrySlide 1 3GPP Liaison Report Date: Authors:
Power control Considerations and framework for MS-MS Communications
Month Year doc.: IEEE yy/xxxxr0 July 2017
Update on 3GPP RAN3 Multi-RAT joint coordination
CT WG6 status report to TSG CT #75
Draft WF on single Tx switched UL
WG2 - ARC TP#29 Status Report
PPC Closing Report for Session #88
Initial workplan on NR spectrum
Global Standards Collaboration (GSC) GSC-15
IEEE Presentation Submission Template (Rev. 9) Document Number:
Status Report RAN WG6 to TSG-RAN #73
WPM ad-hoc group report TP#25
WG2 - ARC TP#29 Status Report
Month Year doc.: IEEE yy/xxxxr0 November 2016
On AP Power Saving Usage Model
Power control Considerations and framework for MS-MS Communications
3GPP RAN1 #90 meeting summary on LAA Enhancements
LTE Mobility LTE Mobility.
Project Planning Committee Closing Report (Session #76)
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
SA WG6 status report to TSG SA#77
LTE-A Relays and Repeaters
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
Motivation for WI on "LTE-based V2X Services"
WF on LTE-NR DC with UL coexistence
Report from TSG GERAN2#21bis St Paul’s Bay, Malta, 4th – 8th October 2004 Diana Edwin, Siemens 3GPP TSG GERAN WG2 Chairman +44 (0) ,
TSG RAN WG4 meeting #74bis Rio de Janeiro, Brazil, April 20-24, 2015
TSG RAN WG4 meeting #74bis Rio de Janeiro, Brazil, April 20-24, 2015
Test strategy towards Massive MIMO Using LTE-Advanced Pro eFD-MIMO
3GPP Status.
.
Proposed response to 3GPP ED request
3GPP Liaison Report Date: Authors: September 2013
and LMAP liaison Document Number: IEEE R0
IEEE and related standards update
AANI SC Agenda Date: Authors: May 2019
3GPP Long Term Evolution (LTE) and System Architecture Evolution (SAE)
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Meeting Slides Date:
WiGig technologies IEEE ad/ay
Strawmodel ac Specification Framework
3GPP RAN1 status on NR-Unlicensed
ETSI–3GPP NGN ACTIVITIES
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
On AP Power Saving Usage Model
Status of NR-U - Wi-Fi coexistence
Summary of Conference Call – Feb 8
ETSI BRAN Update (IEEE Co-Existence Workshop)
Month Year doc.: IEEE yy/xxxxr0 August 2019
HARQ Feedback Joint Coding
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Closing Report Date:
Presentation transcript:

Status Report RAN WG6 to TSG-RAN #73 3GPP TSG RAN #73 RP-161353 New Orleans, USA, 19-22 September, 2016 Status Report RAN WG6 to TSG-RAN #73 RAN6 Convener: Juergen Hofmann (NOKIA) RAN6 Secretary (standing in): Joern Krause (ETSI MCC)

Meetings Meetings held since RAN#72 plenary RAN6 #1 22 – 26 August 2016 Gothenburg, Sweden EF3 RAN #73 19 – 22 September 2016 New Orleans, US NAF3

RAN6 #1 Statistics (1/3) Incoming: 55 Total: 137

RAN6 #1 Statistics (2/3) Rel-13: 31 Rel-14: 1 Total: 32

RAN6 #1 Statistics (3/3) Total number of participants checked-in: 43 (registered for the meeting: 53)

Executive Summary In total 32 CRs approved: PEO (6), EC-GSM-IoT (24), CSPS_COORD_GERAN (1), DÉCOR-GERAN (1) Rel-13: Essential correction agreed for PEO feature as collision of code point in channel access request was detected. Also one Stage 3 correction agreed. Rel-13: EC-GSM-IoT performance requirements finalized for MS and BTS and some miscellaneous corrections agreed to Stage 3 specs. WI completed. Rel-13: CS/PS Coordination for Shared GERAN Networks: correction CR agreed. Rel-14: Positioning Enhancements for GERAN, study on TA multilateration method with secure positioning related signaling positively concluded, related power consumption analysis provided and positioning accuracy performance investigated. Normative work to start at RAN6#2. WI completion 30%. Rel-14: Dedicated Core Network Support: Introduction in Stage 3 agreed. WI completed. Rel-14: Study item DL MIMO for GERAN, TR updated including several agreed pCRs. SI completed. Rel-14: New WID candidate on EC-GSM-IoT radio interface enhancements discussed and revised.

General Matters Meeting Organization No need for subgroups identified Submission Deadline will be on Friday of second week prior to meeting, 21.00 CET/CEST applies for all contributions for reservation and Tdoc submission Reflectors Need for TSG_RAN_WG6_DRAFTS reflector will be checked after few meetings. Specification Responsibility A formal decision is needed on changing the TSG in “GERAN specifications” (43, 44 and 45 series), e.g. change from Rel-14

Liaisons 2 incoming LS and 1 outgoing LS were dealt with. R6-160055 LS on CS/PS coordination in GERAN Shared Networks (RAN3 to SA2, cc RAN6) RAN3 confirmed that it will adopt the same solution as decided for GERAN. Noted by RAN6. R6-160064 LS on enhancing legacy GSM security (SA3 to RAN6, CT1, cc CT6) RAN6 was requested to review one CR on legacy GSM issues in the CS domain. RAN6 provided feedback as requested by SA3 in “Response LS on Legacy Security Issues”, sent in R6-160125 to SA3, CT1, cc CT6.

Contributions to Rel-13 and Earlier Features

eDRX_GSM (Rel-13) CR 44.018 Clarification of CCCH_GROUP Determination agreed in R6-160104 The usage of the Short Access Request procedure, previously removed from the GERAN specifications and reused for PEO (Rel-13) access, was detected in deployed networks (R6-160024, R6-160025). Thus the PEO One Phase Access Request required modification, and it will use TS 4 on RACH. The following set of CRs was agreed: CR 44.018 Clarification of PEO Code Point Usage in R6-160107 CR 44.060 Clarification of PEO Code Point Usage in R6-160108 CR 45.001 Clarification of PEO Code Point Usage in R6-160122 CR 45.002 Clarification of PEO Code Point Usage in R6-160106 Miscellaneous corrections to EC-GSM-IoT to 45.002 in in R6-160067

EC-GSM-IoT, Radio aspects (Rel-13) Set of CRs was agreed related to the correction of TS 4 usage on RACH (used for PEO) and EC-RACH (TS 4 not used), cell reselection, DL coverage class selection, coupling of multiple CCCH and multiple EC-CCCH, EC-AGCH mapping, framework for performance requirements and other miscellaneous corrections: Miscellaneous corrections to EC-GSM-IoT to 43.022 in R6-160065 Corrections to EC-GSM-IoT to 45.001 in R6-160116 Corrections to EC-GSM-IoT to 45.002 in R6-160130 Miscellaneous corrections to EC-GSM-IoT to 45.003 in in R6-160099 Miscellaneous corrections to EC-GSM-IoT to 45.008 in in R6-160110 Corrections to EC-GSM-IoT to 45.008 in R6-160114 Corrections to EC-GSM-IoT to 45.010 in R6-160118 Corrections to EC-GSM-IoT to 45.004 in R6-160117 Miscellaneous corrections to EC-GSM-IoT to 45.005 in R6-160134 Corrections to EC-GSM-IoT to 45.005 in R6-160135

EC-GSM-IoT, Protocol aspects (Rel-13) Set of CRs was agreed related to test of FUA with SS, concurrent TBF support, TS 4 usage on EC-RACH, EC-BCCH change mark reading, low priority access indication and other miscellaneous corrections: Misc EC-GSM IoT Changes agreed to 44.014 in R6-160056 Misc EC-GSM IoT Changes agreed to 44.018 in in R6-160100 Misc EC-GSM IoT Changes agreed to 44.060 in R6-160058 Misc EC-GSM IoT Changes agreed to 48.018 in R6-160059 Miscellaneous Corrections to 44.018 in R6-160119 Miscellaneous Corrections to 44.060 in R6-160121 Miscellaneous Corrections to 48.018 in R6-160132 CR to 44.018 to increase Transmission Opportunities for FUA in R6-160041 not agreed (not considered as a capacity issue)

EC-GSM-IoT, Perform. aspects (Rel-13) Set of CRs was agreed related to MS and BTS receiver performance, Tx coherency error requirement for MS and BTS (conformance testing) and IR requirement for EC-GSM-IoT capable MS: MS Rx performance requirements to 45.005 in R6-160082 BTS sensitivity performance to 45.005 in R6-160111 BTS interference performance to 45.005 in R6-160112 BTS sensitivity performance for OL-CDMA to 45.005 in R6-160136 Incremental redundancy requirement for EC-GSM-IoT to 45.005 in R6-160093 EC-GSM-IoT, Normalized Coherency Error Requirement for MS to 45.005 in R6-160094 Corrections to EC-GSM-IoT BTS conformance testing to 51.021 in R6-160098 Status Report to RAN#73: RP-161656

CS/PS Coordination for Shared GERAN Networks (Rel-13) One Correction CR to 48.018 agreed in R6-160007

Rel-12 and earlier features No contributions

Contributions to Rel-14 Features

Positioning Enhancements in GERAN - ePOS_GERAN (Rel-14) (1/3) Multilateration Signaling for GERAN (R6-160018, rev R6-160124) Signalling procedures for TA multilateration 4 WA’s agreed on usage of PS LCS capability, RRLP, RRLP TOM protocol and applicability to PS domain Energy consumption analysis presented in R6-160083, WA‘s on energy consumption agreed Assumptions for position accuracy simulation of TA multilateration in R6-160011 (rev R6-160087): all WA‘s agreed Simulation Results for position accuracy simulation of TA multilateration, R6-160012

Positioning Enhancements in GERAN - ePOS_GERAN (Rel-14) (2/3) Radio Interface Enhancements for TA based multilateration (R6-160034, rev R6-160085) Investigates improvements to shorten radio interface signalling for TA multilateration Proposal to use a code point in the EC-NumberOfBlocks to differentiate EC and PEO access attempt not agreed. Energy efficient hybrid TA/OTD multilateration for neighbour cells in extended coverage (R6-160035) Investigates power consumption improvement by combining OTD and TA multilateration. Up to 50% energy saving compared to TA multilateration is observed. Energy Consumption Analysis of Radio Interface Procedures for Positioning Enhancements (R6-160036, rev R6-160086) Energy consumption analysis for both above concepts evaluating 20-50% energy saving.

Positioning Enhancements in GERAN - ePOS_GERAN (Rel-14) (3/3) Positioning enhancements for GERAN - Workplan/Agreements (R6-160131) was agreed: Work plan for ePOS_GERAN until RAN#75 updated Agreements and working assumptions collected from other Tdocs Initial study phase conclusions are added: Continue standardization work for TA multilateration method. To consider RAN signaling optimizations and the use of OTD measurements to further improve the MS energy saving by up to 50%. Investigate tightening of current MS timing accuracy requirements and complexity impacts. Status Report to RAN#73: RP-161654

Support of Dedicated Core Networks - DÉCOR_GERAN (Rel-14) DÉCOR Way Forward (R6-160017, rev R6-160089) was agreed: Rerouting procedure in the PS domain with new DCN selection function at SGSN and Gb interface signalling to support DCN selection (SGSN) and MS redirection at GPRS Attach and RAU procedure based on new Information elements (UE Usage Type, SGSN Group Identity, Additional P-TMSI). Inclusion into GERAN Rel-14 specifications Accompanying CR 48.018 Introduction of Dedicated Core Networks in GERAN agreed in R6-160123. With the agreed change the feature is complete. Status Report to RAN#73: RP-161655

Small technical enhancements and improvements (TEI14) No contributions.

Study Item Downlink MIMO for GERAN (FS_DOMIMO_RAN6, Rel-14) One discussion paper and 4 pCRs were presented and agreed: pCR 45.871 Downlink MIMO – Mode and Link Adaptation, R6-160042 pCR 45.871 Downlink MIMO – Signalling, R6-160043 Compatibility Analysis of Downlink MIMO for GERAN, R6-160044 pCR 45.871 Downlink MIMO – Compatibility Analysis, R6-160045 pCR 45.871 Downlink MIMO – Conclusion, R6-160046 The agreed pCRs are included to TR 45.871 v1.1.0 in R6-160091, which is presented in v2.0.0 to RAN#73 for approval and SI completion. Status Report: RP-161729

Other Rel-14 related documents 3 contributions were submitted in regard to a Rel-14 candidate work item: Alternative mappings for EC-GSM-IoT higher coverage classes, R6-160031 Investigates the usage of alternative mappings for CC2 to CC4 with lesser PDCH resources than in Rel-13 EC-GSM-IoT New Channel Formats for Short Packets with NIDD CN, R6-160032 Investigates usage of shorter radio blocks to align with shorter payloads due to Non IP data delivery from CN. WID on Radio Interface Enhancements for EC-GSM-IoT (R6-160033, rev R6-160092) modified to focus on two enhancements: Introduction of alternative mappings for Coverage Classes 2 to 4 MCL improvement on uplink for devices with 23 dBm output power. Further offline discussion was seen needed.

Work Plan Presented in R6-160137 and agreed. Work / Study Item Objective Rel (Core Feature) Completion WI CIoT_EC_GSM-Perf EC-GSM-IoT, Radio Performance Requirements Rel-13 100 % WI ePOS_GERAN-Core Enhanced Positioning in GERAN (Stage2+Stage3) Rel-14 30% WI ePOS_GERAN-Perf Enhanced Positioning in GERAN, Radio Performance Requirements 0% WI DÉCOR-GERAN Dedicated Core Network Support in GERAN SI FS_DOMIMO_RAN6 Study on Downlink MIMO for GERAN

RAN WG6 Schedule 2016 / 2017 Meeting Date Location Host RAN6#1 22 – 26 August 2016 Gothenburg, Sweden EF3 RAN#73 19 – 22 September 2016 US, New Orleans NAF3 RAN6#2 14 – 18 November 2016 US, Reno RAN#74 5 – 8 December 2016 Vienna, Austria RAN6#3 13 – 17 February 2017 Athens, Greece RAN#75 5 – 8 March 2017 Dubrovnik, Croatia RAN6#4 15 – 19 May 2017 China (TBD) RAN#76 5 – 8 June 2017 US (TBD) RAN6#5 21 – 25 August 2017 Berlin, Germany RAN#77 11 – 14 September 2017 Japan (TBD) RAN6#6 27 November – 1 December 2017 RAN#78 18 – 21 December 2017 Lisbon, Portugal

Concluding Remarks RAN6 Chairmen Elections will be held during RAN6#2 (14-18 November 2016). A special thanks to Joern Krause (ETSI MCC) for his efficient secretary support. Thanks to all delegates for their hard work and EF3 for hosting the meeting.