Status of pre-production at TESLA

Slides:



Advertisements
Similar presentations
Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001.
Advertisements

CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
, April 9, 2006Václav Vrba, Institute of Physics, Prague 1. Phenix NCC Silicon Pad Sensors produced in ON Semiconductor Lukas Tomasek, Michal Tomasek,
ECFA-DESY meeting, Krakow, 16 th September 2001Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics AS CR, Prague Silicon pad sensors.
Test of Pixel Sensors for the CMS experiment Amitava Roy Purdue University.
SINTEF Wafers We studied two wafers. Wafer #24 and one oxygenated wafer.
Status and outlook of the Medipix3 TSV project
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
St Malo, 13 th April 2002Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon pad sensors for W-Si ECal.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Measurements on Single and Poly Crystal CVD Diamond Sensors
Atlas OW, Praha, September 16, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague Pixel Detector Status.
January, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm =
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
Measurements of the first ON Semiconductor production wafers at Udine Prepared by Diego Cauz on behalf of the group of Udine April 2004 Udine.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
IFR Praha 2004, 16 th April 2004Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon sensors status.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
10 October 2003, FCM, Krakow Michal Tomášek, Institute of Physics AS CR 1 Michal Tomášek, Václav Vrba Institute of Physics, AS CR, Prague Measurements.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
11/05/2011Sensor Meeting, Doris Eckstein Status of Diode Measurements Measurements by:
SINTEF Wafers We studied two wafers. Wafer #9 and wafer #24. Most of the measurements were done on wafer #9. Road map of the wafer would be helpful. We.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
ACCU meeting - D.Chromek-Burckhart Users’ Office EP
JRA3 Institute of Physics ASCR Prague
Thinning and Plans for SuperBelle
Available detectors in Liverpool
Scintillators and sensors
CALICE Silicon ECal Sensors Status and prospects
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Improving the Defect Life Cycle Management Process
STS Work Meeting on CBM and JINR VB-LHEP, May 2017
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
SciFi option for neutrino target tracker
Sensor Wafer: Final Layout
ELENA electron cooler and SEM grids status
Renovation of the 45-year old PS magnets
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Report on Working Group # 2 The MU2E detector
Production of 3D silicon pixel sensors at FBK for the ATLAS IBL
Welcome! (Dec 11 and 12) Please have out: Plan Today Lab books
Current Status of the T2K Experiment
Quality Management Systems – Requirements
Improvement in Project Delivery
Amit Krig & Nimrod Gindi Mellanox Technologies May 2007
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
CALICE: News Since May Paul Dauncey Three main items: Beam test status
Status of SOI Pixel Development
RPC Readiness for installation
Scintillators and sensors
(Lab Investigation - Come Fly With Me!)
Tuesday August 21, 2018 (Lab Safety).
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
PANDA Cryostat and Yoke
Changes to our Annual General Meeting date
SAME 15 existing quadrupoles (QFS, QDS, QFL)
Presentation transcript:

Status of pre-production at TESLA Václav Vrba Institute of Physics AS CR, Prague Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Till the end of June Tesla shell provide 20 2-Tile and 20 3-Tile wafers; More of 50% of this production was ready at the end of May, but but it appeared that for important part of wafers the “high”P-spray dose was missing (done just “low” dose have been done); The clarification of the P-spray problem caused the delay in the preliminary announced delivery; About 25% of the planned delivery was sent out on 5th June to the Sensor Labs  some organizational problems with the redistribution of wafers via CERN; Because the wafers did not reach the Sensors Labs in time, I asked Tesla provide me their measurements to be presented on the Pixel week; Due to several accumulated obstacles as: significant bigger lead time for wafers, the regular maintenance of double side aligner, etc. Tesla will probably ask for delay of end of June term. . Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Conclusions TESLA finished 25% of second pre-production. The sensors conform with QA criteria on measurements performed by vendor. Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

New aligner Handling spots Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Basic characteristics Ufd  80 V Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Basic characteristics (cont) Iox @ 50 V  100 pA Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Basic characteristics (cont) Significant improvement of leakage current ! 3-Tiles - New delivery Good Tiles - Old delivery Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Basic characteristics (cont) Diode with Guard ring P-spray doses Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Delivery According contract: 11 3-tile wafers 2 2-tile wafers 1 2-tile wafer (Prague, replacement of nonconform.) 1 2-tile wafer (NM, broken) Additionally available: 2 3-tile wafers 9 2-tile wafers Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR

Pixel week, Marseille, June 2002 Václav Vrba, Institute of Physics, AS CR