Regional Connectivity Scheme Ministry of Civil Aviation

Slides:



Advertisements
Similar presentations
Internet Governance: A Progress Report from WGIG Charles Shaban Member of the Working Group on Internet Governance Executive Director, AGIP Regional Office.
Advertisements

TIME LINE SCHEDULLE. TIME SCHEDULLE 2012 JanFebMarAprMayJunJulAugustSeptOct Prep. Meeting 1 ExCom Meeting Obtain Information TOR Drafting 1st Annouchment.
Route Planning and Evaluation
INDUSTRY WASTE MANAGEMENT PLANS PCWEA 26 FEBRUARY 2013.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Statistics Portugal Economic Statistics Department Domestic Trade, Tourism and Transport Statistics Unit « Belgrade, November 27, 2012 « TKEY CHALLENGES.
Avoiding Technical Corrections Qualified Allocation Plan Forum September 5, 2012.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
TEMPUS INFORMATION DAYS Tajikistan, 18 November 2011 Alba-Chiara Tiberi, Project Officer EACEA TEMPUS IV- FIFTH CALL FOR.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Sila National Park participates in the European project Bioeuparks that is taking place in the natural parks of five EU countries - the project aims to.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
T&SC Modification Proposal: Clarification of Outturn Availability
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
Work Related to Senate Bill 2202 (effective January 1, 2001)
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Greater Binghamton Airport March 2016 BGM. Sixel Consulting Group March 2016.
Signalling Programme External Stakeholder Meeting on September 17, 2009.
Supplier Briefing Session Wheelchair Accessible Vehicle Framework.
WELCOME S R AGRAWAL. SERVICE TAX VOLUNTARY COMPLIANCE ENCOURAGEMENT SCHEME 2013.
Draft Regional Connectivity Scheme (RCS)
Regional Connectivity Scheme Ministry of Civil Aviation
Dependent Eligibility Audit CEWW Health Insurance Consortium
KCC Home to School Transport – Bulk Route Contracts & DPS
Great Lakes Aviation, Ltd.
Webinar on the Exposure Draft of CAS Continuing Education Policy
Stakeholder Consultation
Fair Go Rates System Dr Ron Ben-David Chairperson
Content of Tender Dossier - Instructions to Tenderers - Tenders
Capacity Conversion – 616s
Integrated Plan for Carer Support Services
RO-HU-AT - a pilot project for incremental capacity
Distribution Workgroup 24/11/16
UDAAN : ADDITIONAL INCENTIVES IN ANDHRA PRADESH
UNR116 splitting Informal document GRSG
Establishment of Space Weather Information Service
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
2016 CRO recurrent course.
Webinar 3: Education Provisions in Prisons
Part C State Performance Plan/Annual Performance Report:
Universal Access Rules Public Consultation Workshop Bairiki, Tarawa
Review of Professional Standards A National Conversation
All Wales Safeguarding Procedures Review Project
600 MHz – Proposed TV Transition Objectives and Methodology
The Economic Regulation of Transport Bill, 2018
Sub-Regional Meeting for ASEAN Countries on the Marrakesh Treaty and the Production and Exchange of Accessible Books by the World Intellectual Property.
Employees’ Guide to Parental Leave
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Fair Go Rates System Dr Ron Ben-David Chairperson
Updates about Work Track 5 Geographic Names at the Top-Level
Civil Aviation Department, Government of Uttar Pradesh
Capacity Methodology Statements: Impact of Mod 452
UNC Modification – Non Effective Days
Passenger Mobility Statistics 21 May 2015
RO-HU-AT - a pilot project for incremental capacity
Exit Capacity Substitution and Revision
Fasset Briefing Session
Ministry of Civil Aviation
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
CUSC Amendment Panel Recommendation
A Global Consensus Process
Review of the 1958 Agreement
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Passenger Mobility Statistics 21 May 2015
New Special Education Teacher Webinar Series
MEDIA PROGRAMME SUPPORT MECHANISMS TO THE AUDIOVISUAL EUROPEAN INDUSTRY Education, Audiovisual & Culture Executive Agency.
Presentation transcript:

Regional Connectivity Scheme Ministry of Civil Aviation Ude Desh ka Aam Naagrik (UDAN) 2nd Round of Bidding Ministry of Civil Aviation Government of India May 24, 2017

Glimpse of 1st Bidding Round

Timelines of the 1st Bidding Round S.N. Activity / Milestone Timeline 1 Release of the draft Regional Connectivity Scheme / UDAN 1st July 2016 2 National Level Stakeholder’s Consultations 29th July 2016 3 Launch of Regional Connectivity Scheme / UDAN 21st October 2016 4 Start of 1st round of bidding 5 Pre-bid Meeting with prospective bidders / stakeholders 11th November 2016 6 Date for releasing of Corrigendum / Final Bidding Documents to start the e-bidding process 5th December 2016 7 Last date of declaration of stage length and flight duration 2nd January 2017 8 Last date and time for submission of bids (Initial Proposals) 16th January 2017 9 Invitation for submission of Counter Proposals (Bids) 18th January 2017 10 Last date and time for submission of Counter Proposals 1st February 2017 11 Date and time of opening of Technical bids (initial & counter proposals); 3rd February 2017 12 Date and time of opening of Financial bids (initial & counter proposals) – Phase 1 23rd February 2017 & 8th March 2017 13 Issuance of Letter of Award (LOA) 30th March 2017 3

Successful Completion of the 1st Bidding Round 45 number of proposals were received from more than 10 distinct applicants 27 number of proposals were awarded Awarded proposals involve 31 Unserved Airports, 12 Underserved Airports and 27 served airports 128 unserved / unconnected routes 5 airline operators 4

Scheme Aspects for Stakeholder Inputs

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 1/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders   Scheme Objectives and Guiding Principles 1.4 Definitions Clause 1.4.1.14 a) One of the existing requirements for a route to be classified as an RCS Route is a) At least one of the origin or destination points is either (a) an RCS Airport satisfying the definition of Underserved or Unserved Airport on the first day of each proposal window in which an application is made pursuant to this Scheme; or (b) an RCS Helipad Presently, the Scheme only allows a route to be classified as RCS Route if at least one of the origin and/or destination airport is Underserved or Unserved. In order to further encourage intra-regional connectivity, one of the possible options could be to consider a route between two airports both of which are neither Underserved nor Unserved as RCS Route, subject to the satisfaction of other conditions of classifying a route as an RCS Route as provided in the Scheme. Also, given that both the airports shall not be Underserved or Unserved, such an RCS Route may only be permitted concessions (without VGF and exclusivity), as provided by central / state government / airport operators, applicable under the Scheme for a year without any airfare cap. The stakeholders are requested to share their views on the above along with other suggestions, if any. 6

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 2/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 2.  Scheme Objectives and Guiding Principles   1.4 Definitions Clause 1.4.1.14 c) One of the existing requirements for a route to be classified as an RCS Route is c) the stage length (in km as per the flight path declared by AAI) between the origin and destination airports is not less than 150 Kms for operations through fixed wing aircraft Presently, the Scheme does not consider a route with stage length of less than 150 Kms for operations through fixed wing aircraft as RCS Route. Suggestions / comments are invited from the Stakeholders on relevant aspects related to this provision such as: Whether the routes below 150 km, for operations through fixed wing aircraft, be considered as RCS Route. If the answer to (a) above is yes, should such operations be permitted only for specific areas/regions within the country. Given lack of availability of data for cost of operations for such small stage lengths, should the VGF be linearly proportioned on the basis of stage length by considering the VGF Cap for 151-175 Km slab as the reference value. Should the Airfare Cap as applicable for 151-175 Km be applied on all stage lengths less than equal to 150 Kms., etc. 7

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 3/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 3.  Features of the Scheme   2.8 Exclusivity of operations Clause 2.8.2 The Selected Airline Operator shall be granted an exclusivity for operating air transport services / flights for a period of three (3) years from the commencement of operations on an RCS Route under the Scheme. The Scheme currently provides exclusivity to Selected Airline Operators for a period of three (3) years. The exclusivity under RCS can be considered to have two components: i) Exclusivity of operations on RCS Routes; and ii) Exclusivity of VGF support and other concessions. The Ministry has received varied feedback on the period of exclusivity from various stakeholders and therefore, the stakeholders are requested to share their views on following aspects regarding the period of exclusivity of operations: Whether the period of exclusivity be reduced from the existing 3 years and if so, to what period. 8

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 4/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 3.  Features of the Scheme   2.8 Exclusivity of operations Clause 2.8.2 The Selected Airline Operator shall be granted an exclusivity for operating air transport services / flights for a period of three (3) years from the commencement of operations on an RCS Route under the Scheme. b. Should there be different exclusivity period for operations and for concessions under the Scheme. For instance, the exclusivity for operations could be provided for 1 year and the VGF and other concessions could be exclusively available for 3 years to the Selected Airline Operator. This means that if any other airline intends to start operations on an RCS Route after a period of 1 year without any VGF or other concessions, it may be permitted to do the same. c. Should there be different exclusivity periods for different regions. For instance, operations in hilly regions or islands may require higher exclusivity period as compared to operations in plain regions. Therefore, one option could be to keep the exclusivity period as 3 years for operations in the hilly regions and islands and reduce it to 1 year in plains. The stakeholders are requested to share their views on the above along with justifications / rationale as well as share other suggestions, if any. 9

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 5/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 4.  Operating Mechanism of the Scheme   3.3 Minimum Performance Specifications for an RCS Flight Clause 3.3.1.1 Clause 3.3.2 For fixed wing aircraft, a Selected Airline Operator shall be required to provide fifty percent (50%) of RCS Flight Capacity as RCS Seats, subject to a minimum and maximum of 9 RCS Seats and 40 RCS Seats respectively per RCS Flight. The number of RCS Flights to be operated in a week with VGF shall be minimum of three (3) and a maximum of seven (7) departures per week from the RCS Airport. Presently, the Scheme specifies the minimum and maximum number of RCS Flights permitted in a week as part of Minimum Performance Specifications (MPS). The stakeholders are requested to share their views on: What should be the minimum number of RCS Seats mandated in a flight (For instance, currently it is 9 RCS Seats). If less than 9, then how will the requirement for providing both RCS and Non-RCS Seats in a flight be met. Should that continue to be a 50% minimum requirement? Should a requirement of minimum and maximum number of RCS Flights in a week be translated to the number of minimum and maximum number of RCS Seats in a week? If yes, please explain with adequate justifications? 10

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 6/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 4.  Operating Mechanism of the Scheme   3.3 Minimum Performance Specifications for an RCS Flight Clause 3.3.1.1 Clause 3.3.2 For fixed wing aircraft, a Selected Airline Operator shall be required to provide fifty percent (50%) of RCS Flight Capacity as RCS Seats, subject to a minimum and maximum of 9 RCS Seats and 40 RCS Seats respectively per RCS Flight. The number of RCS Flights to be operated in a week with VGF shall be minimum of three (3) and a maximum of seven (7) departures per week from the RCS Airport. Should translating the minimum requirements to RCS Seats be permitted only in specific regions like hilly regions and islands where the daily/weekly frequency required may be more Should seasonal flights be permitted under RCS? If so, for which category of places / cities, respective periods; and comments on the sustainability and integrity of routes. Also, if yes, will the airline operators be willing to agree for an Airfare Cap for busy seasons when the ability to make more profits through market determined fares could be higher. Also, how will the integrity of schedule be maintained and certainty of flight availability be provided to the passengers. Any other suggestion, justification for providing better operational flexibility to the Selected Airline Operators. 11

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 7/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 5.  Operating Mechanism of the Scheme   3.5 Network Proposal Clause 3.5.2 A Network Proposal shall have more than one (1) route and can be combination of RCS Routes and Non-RCS Routes. The Applicants shall be required to ensure that all routes in a Network Proposal, including the Non-RCS Routes, are connected using the same aircraft (type) through the same frequency (number of flights) per week. The stakeholders are requested to share their views on Whether Non-RCS Routes should continue to be included as part of Network Proposals under the Scheme. If the answer to (a) above is yes, should the compliance requirements for frequency, maintaining the integrity of the network etc. be limited to RCS Routes in a network. In case of above, how will the passengers get a certainty about schedule of the network, including for Non-RCS Routes. 12

Referred Scheme Section / Clause Considerations for the Stakeholders Specific Aspects for Stakeholder Inputs 8/8 S.N. Referred Scheme Section / Clause Considerations for the Stakeholders 6.  Annexures   Annexure – 3: VGF Caps under RCS VGF Caps for operations through Helicopters There was limited interest from helicopter operators as part of the First Round of Bidding process. Please share views / suggestions on how can the operations through helicopters be incentivized under the Scheme. For instance: Is the level of normative VGF Caps as currently provided for helicopter operations for various stage sufficient for operations? Additionally, should there be different VGF Caps for different helicopter categories (for instance, i) Light; ii) Medium and Heavy) as in the case of fixed wing aircraft. Any other suggestions. 13

Way Forward

Specific Aspects for Stakeholder Inputs 8/8 S.N. Activity / Milestone Timeline 1 Invitation of Stakeholder Inputs 24th May 2017 2 Stakeholder Consultation Workshop 7th June 2017 3 Last date for the submission of inputs 9th June 2017 4 Decisions by MoCA / AAI on the inputs received / Finalization of Scheme Document By 30th June 2017 5 States/ UT ‘ROUTES’ event 7th July 2017 15

Thank you