Session 13 Feedback on the Strategic Direction of the Student Systems

Slides:



Advertisements
Similar presentations
Leverage MarkITS for agile solutions delivery that balances strategic thinking with tactical execution for “Business & Technology Convergence” MarkITS.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Speakers Vikram Yellampalli Prity Tewary
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
1 Australian Newspapers Digitisation Program Development of the Newspapers Content Management System Rose Holley – ANDP Manager ANPlan/ANDP Workshop, 28.
1 Presenters: Lucretia Parham Janice Zeigler Armstrong Atlantic State University May 14 10:15 a.m. - 11:15 a.m. Presenters: Lucretia Parham Janice Zeigler.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
South Dakota Library Network ALEPH v21 Staff User Upgrade Information Circulation and ILL South Dakota Library Network 1200 University, Unit 9672 Spearfish,
This information is confidential and proprietary to Lawson ® and cannot be reproduced without permission. Reducing Resolution Time with Advanced Electronic.
Software Project Documentation. Types of Project Documents  Project Charter  Requirements  Mockups and Prototypes  Test Cases  Architecture / Design.
Integrated National Education Information System (iNEIS TM ) User Role Mapping for MOE 08 April 2014.
1 Presenters: Lucretia Parham Sara Connor Armstrong Atlantic State University October 30, :45 – 12:35 Copyright Sara Connor and Lucretia Parham,
Mantid Stakeholder Review Nick Draper 01/11/2007.
ARCH-04 Before You Begin Your Transformation Project… Phillip Magnay Architect – Applied Technology.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Copyright © 2007, Oracle. All rights reserved. Using Change Management.
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
Strategic Direction, Roadmap and Enhancements
Session 33 Feedback on the Strategic Direction of the Finance Systems
iEnabler Salary Claims
Presenter: Raymond Schoonraad Date: 17 March 2015
ITIL: Service Transition
Partners – MaaS360 Portal Management
Sample Fit-Gap Kick-off
International Travel Request System
What’s New in ProMonitor 9
Feedback on the Strategic Direction of the General and Core Systems
Session 35 Finance System Enhancements (SD, CT, CB & BL)
Software Configuration Management
The Way Forward – ITS Integrator
Bulk SMS/Text Functionality
ITS Integrator User Group 2015
Business Intelligence for the Tertiary Sector
Presented by: Cheryl Whitmore Date: 16th March 2015
Session 34 Feedback on the Strategic Direction of the Finance Systems
<Partner Name> MMM DD, 2017
Integrator 3 Enhancements
Technology Strategy Update
"Meet the Expert" Mobile Apps implementation – Beta site experiences
Chapter 18 Maintaining Information Systems
Presenter: Hanlie Spangenberg Date: March 2013
Timetabling : CELCAT Interface
General Systems Enhancements
Internationalization: Possible Enhancements to the ITS System
Electronic Application for ITS Integrator User Access
The iEnabler Registration and the Academic Structure
FIZZ Database General presentation.
Session 43: HR and Payroll Systems - Integrator 3 Enhancements
ITS Integrator User Certification Program
Manual testing of Windows Metro style apps built using HTML
Session 45: ITS Integrator Roadmap for HR and Payroll Systems
ITS Integrator User Group 2015
Presenter: Neetham Dabideen Date: 11 March 2014
IDR – Internal Department Request
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
(Includes setup) FAQ ON DOCUMENTS (Includes setup)
Oracle Sales Cloud Sales campaign
SAD ::: Spring 2018 Sabbir Muhammad Saleh
BusinessObjects 4.2 SP3 What's new for System Administration in CMC
Gathering Systems Requirements
Using Use Case Diagrams
The InWEnt Blended-learning approach; GC21 as an e-learning and Blended-learning platform 22/02/2019 An introduction course on InWEnt Blended-learning.
Delivering great hardware solutions for Windows
Configuration management
Gathering Systems Requirements
Agile software development
Manage Sourcing - Supplier
WEB DESIGN Cross 11, Tapovan Enclave Nala pani Road, Dehradun : ,
Presentation transcript:

Session 13 Feedback on the Strategic Direction of the Student Systems Presenter: Phlip Pretorius Date: 17 March 2015

Positioned for success… Recap 2014 Strategic Direction Strategy Road Map Progress In this session I will Recap of 2014 FSDF – I will refreshing our memories on what we presented in this session at the previous UG Strategy - Then what is our strategic goals and how we intend to achieve these goals. Roadmap – Going into a more detail level what is on the roadmap for the student systems Progress – lastly the development progress that we have made.

Recap 2014 Strategic Direction Roadmap Inputs User Group Workshops Strategic Discussions Internal With Senior Management from clients Technical Strategy Marketing New Technology Road Map Client Partner Participation Recap 2014 Strategic Direction System Usage Statistics User Group Workshops Development Proposals Client Funded Development Industry Expert Workshops New Technology Three-tier structure Client – web browser Application – in the application server through the ADF framework. It is no longer Java Applets HTML page that gets rendered Database - Oracle Model–view–controller (MVC) Data model Business Rules User Interface Improve the usability of the system Future proof your investment in ITS Integrator Improve the scalability of the iEnabler products Enable the use of web-, cloud- and mobile devices Improve and enrich functionality

Future proof your investment in ITS Integrator Objective Future proof your investment in ITS Integrator Improve the scalability of the iEnabler products Enable the use of web-, cloud- and mobile devices Improve and enrich functionality Improve the usability of the system Scalability is ability of a system, network, or process to handle a growing amount of work in a capable manner or its ability to be enlarged to accommodate that growth. Usability is the ease of use and learnability of a human-made object 1. If you attend sessions 14 and 15 you will see how we achieved this objective.

Targeting High Usage Areas for Conversion Dedicated Development Team Strategy Technology Oracle 11g database & Weblogic Server 11c Mixture - Oracle ADF-Faces & Oracle Forms 11g Targeting High Usage Areas for Conversion Dedicated Development Team Utilise Industry Experts Retraining & Reskilling Staff Adopted the Agile Development Methodology Continuous User Feedback Reporting Strategy to be Decided Agile software development is a group of software development methods in which requirements and solutions evolve through collaboration between self-organizing, cross-functional teams. It promotes adaptive planning, evolutionary development, early delivery, continuous improvement, and encourages rapid and flexible response to change. Work broken down in sprint Planning meeting Back log refinement meetings Daily stand-up Sprint Review Sprint Retrospective Local software requests UG Specialist Working Groups User feedback

Short Term - ITS Integrator 3 Road Map Short Term - ITS Integrator 3 Client Funded Standard Development Statutory changes ITS Integrator 4 Post Integrator 4

Short Term: ITS Integrator 3 Several smaller items delivered that will be reported on in Sessions 14 and 15 e.g. Custom Header with Logo Duplicate ID overwrite Future date for Enrolment Cancellation Full Period Mark validity period added More – please attend the sessions Custom Header with Logo A new Stylesheet, TXT2PDLL.xsl Ground Rules Report must be designed to print on letter head. "*ccc.pc" and "prg.sql" programs only Header/footer dimensions: Height - 4 cm Width - 20.9 cm Some reports already have custom stylesheet to print header/footer. Duplicate ID overwrite System will not allow anymore Supervisor can now override Data restriction SDID Re-registration of failed subject: Controlled by SOD 'P1' Apply Re-Registration of Passed Subject Rules SOD 'P2' Result Code - Absence for Exam with Valid Reason SOD 'P3' Re-Registration of Failed Subject Allowed SOD 'P4' Re-Registration Exam Type Future date for Enrolment Cancellation Auto create Mark Type and Assessment Records SOD 'AF' / SR Change Mark Type criteria when Primary Lecturer code changes SOD 'AG' / SR Create Mark Type criteria when new Primary Lecturer created Action code ‘BW’ added on the Student iEnabler - Registration Restrictions Full Period Mark validity period added Number of months Specified on: Qualifiction Type Qualification Subject Hierarchy of testing Registration program in {SREGAR-1} changed to apply Full Period Mark validity rule Supervisor can overwrite Data Access restriction 'AFPO' in {SMNT-5} Bulk registration for additional exams in {SSTUR4-21} changed to apply Full Period Mark validity rule Send the iComms Letter with Attachment Loaded in the DSR In final testing phase Subject Summary Report {SSTUDRN-4} Added ID Number Specific Mark Type identified in SOD 'MT' / SR ISAT Mark Type Code Created a new stylesheet Can be set to Default in {USERS-1} Exam Admission Permits per Campus in {SEXAM6-2} Print per campus Class Attendance Print Attendance Register per student in {SSTURL-6} New report to print summary of attendance in {SSTUR2-11} New Cohort objects to identify attendance in {SSTUD9-1} New Cohort "Chain" relationship code in {SSTUD9-10} New report to print attendance "patterns" using the chain Cohort in {SSTUR2-12} New SOD 'MC' / SR to allow the calculation of marks for cancelled students. Management Information in iEnabler Changes to headcount - can count per block code. Assessment Results statistics Student iEnabler View Results Created an event Code = PQ {STWEBM-7} to differentiate between showing only Primary qualifications or all qualifications. Student will see links for every Block Code/Year enrolled for Choose a year will see all results for all block codes.

Short Term: ITS Integrator 3 In process An Appeals Functionality Promotion and Graduation Please attend session 17 Download and upload of assessment marks In final testing phase.

Letters, Lists and Labels will be discontinued Integrator 4 Letters, Lists and Labels will be discontinued Only Programs that generate documents Not set-up and log file Concrete and measurable Know the programs Know what to be done Can estimate

Concrete and measurable Integrator 4 Concrete and measurable Phase 1 Items New system cycle for of Full period marks Done Do not allow mixture of compulsory and non-compulsory for the same subject in same qualification Will be Done (by end of UG) PNAM Local Software for approval of marks Not started yet Re-do Lecturer iEnabler for marks capturing

Integrator 4 Vague and unknown Do not know which programs Do not know exactly what to be done Cannot estimate

Integrator 4 Vague and unknown Phase 1 Items Provide workflow functionality Provide more immediacy Upgrade the user experience in the iEnabler products Workflow functionality Please help us by providing a typical sequence of programs used in a Business Process Describe the process Link each step in the process to program What is the data manipulation that is done? More immediacy Warn when within 10% of quota at application Where else can this be added to the system?

Integrator 4 Vague and unknown Phase 1 Items Conversion of high volume usage programs to ADF System Cycle Academic Structure Converted Several programs in {SREGB} converted Most Code structures Busy with: Student Biographical Academic Applications About 380 programs converted

Integrator 4 Vague and unknown Phase 2 items Extend mobile technology to operational aspects e.g. registration Further refine "Interested in Studying here" Further develop mechanisms to include our clients in the Agile Philosophy.

Multi-level organizational structure Post Integrator 4 Multi-level organizational structure Extend Text customization in iEnabler New validation in exam paper definition for attend only Copy of Assessment Criteria Add a subminimum to Mark Type Enhance export capabilities Additional parameters for {STWEBM-3} Prevent illegal evaluation methods in Main-Modules Multi-level organizational structure: Currently only have Faculty and Department on Academic Structure Need to extend to the structure that can be created in e.g. {GCS-10} {STWEBM-3} Student Registration Validation Control.

Post Integrator 4 Change final commit of iEnabler registration program to use one standard package

Disclaimer The information, comments and material presented in this presentation are provided for information purposes only. The presentation is not addressing all possible technical or business aspects and does not claim to be complete or exhaustive. Adapt IT reserves the right to change its business or product development plans as circumstances dictate. This document may not be reproduced or distributed without the written permission of Adapt IT (Pty) Ltd.

Any Questions?

Thank you.