Planning and Organising Two Introduction to Construction Methodology

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Advertisements

Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Planning & Organising two Introduction to WBS Work Breakdown Structure Presenter Tony Bosnich Adapted from Taija Puolitaival Oct 2014 © Unitec New Zealand.
Risk Assessment – An Essential Standard
Click to edit Master title style  Click to edit Master text styles  Second level  Third level  Fourth level  Fifth level  Click to edit Master text.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
1 Macmillan Academy - ICT Department Unit 2 – ICT In Organisations UNIT 2 – ICT IN ORGANISATIONS.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.
Planning and Organising Two Plant and Equipment - Cranes- ConstructioConstru cc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich Glenn Edmonds.
Microsoft Project How to format nodes in network diagrams Presenter TONY BOSNICH Updated 2016 © Unitec New Zealand DEPARTMENT OF CONSTRUCTION.
CDM Construction Design and Management
Future City Orientation Laura Lorenzo, PMP President ; PMI-SVC.
LDC Module Creation: Part 1—The Template Task Jeanette Barreiro June 11, 2014.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
A Brief intro to Project Management What can it do for you
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Remove this slide before submitting.
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Desk Based Preconstruction – Planning
Safety Inductions CPNZ Basic Training
Creating Oracle Business Intelligence Interactive Dashboards
Introduction to Project Management
Maintaining Safety Standards
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Health and Safety Policy
Particular Conditions of Contract & Appendix to Tender
Workplace Communication
Maintaining Safety Standards
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Human Resources - Recruitment
January 2009 Update Site Waste Management Plans
Lecturer, Unitec Institute of Technology, Auckland, New Zealand.
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
Design Risk Management Spotlight on CDM 2015
Presentation Title: View > Header & Footer
Quality Management Systems – Requirements
A NEW look at PowerPoint
TEMPLATESPARAPOWERPOINT.COM INSERT THE TITLE OF YOUR PRESENTATION HERE.
Communication and Consultation with Interested Parties by the RB
Roadmap to COR.
Presenter Tony Bosnich 2015
Presenter Tony Bosnich Oct 2015
PowerPoint Template FLHSA 2015
TEMPLATEPARAPOWERPOINT.COM INSERT THE TITLE OF YOUR PRESENTATION HERE.
Level 1 HSE M S Audit Insert Title here Closing Presentation
Planning and organising Two Risk Management Introduction
Presenter Department Affiliation Date of Presentation
Introduction to Engineering Design II (IE 202)
Competency: Create site plan drawings
Remove this slide before submitting.
Risk Assessment – Space Only Stands
Planning and Organising Two Development of the P&O process
P&O 2 Construction Planning Summary
University Template Sample Slides June 2017.
Generic Service Delivery Toolkit
P&O 2 Construction Planning Summary
Planning and Organising Two Introduction to Construction Methodology
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Presenter Tony Bosnich 2014
RTW Self Assessment using the 5 Steps
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Construction Management Services April 16, 2018
TECHNICAL REPORTS WRITING
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Add Your Company Slogan
Presentation transcript:

Planning and Organising Two Introduction to Construction Methodology Use title slide layout Presenter Tony Bosnich Oct 2014 © Unitec New Zealand

Learning outcomes Understand difference between method statements and construction methodology and prepare a methodology for a medium complex building To achieve a new layout – insert a new slide, then in the slide thumbnail left side view, Right Click, choose layout – and pick a content style to use >>DEPARTMENT OF CONTRUCTION

What are Method Statements? A method statement is a written document that essentially details a safe system of work and identifies the conceivable hazards that may arise during the work that is undertaken. In NZ Method statements are usually provided to the principal contractor by the sub- contractor(s). The Method statement should explain in detail the work that is to be undertaken by the sub contractor and the necessary remedial measures that need to be in place in order to protect the site workforce and in some cases members of the pubic who may be affected by work actions. >>DEPARTMENT OF CONTRUCTION

What Should a Methodology Statement Include? There are many definitions of “ PROJECT but one of the common words used is UNIQUE Because all projects are unique, it is impossible to have a Universal Template that will fit situations. All methodology statements must therefore be job or site specific. Unique job = Unique method statement >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

However it should include the following segments as a minimum: 1.Basic Job Information 2. Trade Details 3. Detailed Method of Work 4. Risk and H&S Assessments 5. Plant/Equipment required 6. Operative Competence required 7. Drawings/Sketches which are required for clarification 8. Provision for Monitoring and Review >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Activity Using House plan provided Do construction methodology statement Using list on previous slide >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Sections 1,2,4 to 8 require filling the job details and general items and confirmation of requirements. Section 3 needs filling in a lot of descriptive detail EXPLAIN to the client how you intend to build their project. Communicate your intended PLAN so they understand the sequence, zoning , phasing and are confident you can complete project according to their requirements. >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

Methodology for Construction A construction methodology is a detailed description of the systems to be employed by the main contractor to complete the project in the most effective way in accordance with the unique site constraints of the project: This narrative is concerned with sequence and co ordination not TIME Use Sketch or drawings- include appropriate drawings ,site layouts >>DEPARTMENT OF CONTRUCTION

How is this different from Method statements. Sub Contractor to Main contractor Methodology Statement Main contractor to Client >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER

References Wikipedia Safety Services Direct References Wikipedia Safety Services Direct .com Use balance of time to work on construction methodology assignments in groups. >>DEPARTMENT OF CONTRUCTION