SuperB Detector Status-Elba-2010

Slides:



Advertisements
Similar presentations
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Advertisements

WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
G. Finocchiaro – INFN LNF XI SuperB General Meeting DCH-I parallel session LNF, 1 December 2009.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
Update on & SVT readout chip requirements
The Detector Status White paper and budget status Subsystem status
SuperB Detector Status-Frascati-09
IFR Detector R&D status
IFR Detector R&D status
SVT – SuperB Workshop – Annecy March 2010
Roberto Calabrese Ferrara University and INFN
Overview of SuperB Particle identification, and work towards the TDR
Update: EMC R&D David Hitlin SuperB R&D Meeting September 25, 2008.
SVT subchapters & editors
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Technical Design for the Mu3e Detector
Electronics Trigger and DAQ CERN meeting summary.
ETD summary D. Breton, S.Luitz, U.Marconi
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
ETD/Online Report D. Breton, U. Marconi, S. Luitz
CERN meeting report, and more … D. Breton
Claudia Cecchi University of Perugia and INFN
Proposal for Experiments
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
IFR Status Summary W. Baldini on behalf of the IFR Group
SuperB Detector Status-Cal Tech-Dec. 2010
ETD meeting Electronic design for the barrel : Front end chip and TDC
ETD/Online Report D. Breton, U. Marconi, S. Luitz
Electronics, Trigger and DAQ for SuperB
The Beam Test at Fermilab:
superB Detector Workshop I University of Perugia and INFN
Workshop Goals for the Detector Groups
Prototype activities update
Trigger, DAQ, & Online: Perspectives on Electronics
Summary/Conclusions of the SuperB PID Sessions.
SuperB EMC Computing Foreseen activities and software/computing needs
IFR detector mechanics
The SuperB Silicon Vertex Tracker
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Jin Huang Los Alamos National Lab
Integration and IR Hall
The Detector Status Overall progress Subsystem status
RPC and LST at High Luminosity
SVT detector electronics
SVT detector electronics
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
DC trigger Present DC design Lab tests and implementation.
General Introduction to IFR
ETD parallel session March 18th 2010
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Electronics for the PID
Electronics, Trigger and DAQ for SuperB: summary of the workshop.
Perugia SuperB Workshop June 16-19, 2009
U. Marconi, D. Breton, S. Luitz
LC Muon Detector Development Overview
Presentation transcript:

SuperB Detector Status-Elba-2010 White Paper/DPR Status System by System Updates Workshop Goals and Structure. Blair Ratcliff SLAC

White Paper Status

Detector Progress Report-White Paper Significant update since CDR Some new designs and/or revised system designs in some cases. Grounds-up budget re-evaluation and/or updates Some growth in totals since CDR for both Manpower and M&S. Text complete and content edited (~ 90 page report) Final discussions this week-Plan to Freeze ~ week’s end. Need to finalize/freeze budget & schedule (currency conversion update) Final Consistency Editing Pass within ~ 2 weeks 3

First Page of Table of Contents

Second Page of Table of Contents Third Page 5

Detector Progress Report-Authors Presently taken from contributing section editor’s lists Please suggest updates before the end of this meeting. 6

Detector Evolution

SuperB Detector (with options)

Outstanding Geometry Issues 6 Layer SVT LO Striplets @ 1.6cm if background is acceptable as default. MAPS Option . Retain 5 Layer outer detector. SVT – DCH transition radius ~> than 20 cm determined by beam element cryostats to allow easy installation Backward EMC Inexpensive Veto device bringing 8-10% sensitivity improvements for Bt n. Low momentum PID via TOF? Technical Issues? Forward PID Physics gains about 5% in BK(*)nn. Somewhat larger gains for higher multiplicities Open technical options/interactions with EMC Absorber in IFR Optimized layout. Plan to reuse yoke. Still need to resolve engineering questions.

Approx. Projected Progress Report Budget (Final Transport Costs and Currency Rates Being Revisited) WBS Item EDIA Labor M&S Rep. Val. mm mm KEuro KEuro 1 SuperB detector 3924 2361 ~51000 48922 CDR Budget

Detector Proto-Tech Board/Parallel Session Conveners Detector Coordinators – B.Ratcliff, F. Forti Technical Coordinator – W.Wisniewski SVT – G. Rizzo DCH – G. Finocchiaro, M.Roney PID – N.Arnaud, J.Vavra EMC – F.Porter, C.Cecchi IFR – R.Calabrese Magnet – W.Wisniewski Electronics, Trigger, DAQ – D. Breton, U. Marconi Online/DAQ – S.Luitz Offline SW Simulation coordinator – D.Brown Fast simulation – M. Rama Full Simulation – F. Bianchi Background simulation – M.Boscolo, E.Paoloni Rad monitor – Lumi monitor – Machine Detector Interface – +DGWG – A. Stocchi, M. Rama Stable!

Detector Systems Status Reports Progress on Detector Subsystems System Parallel Sessions Yesterday.  An advertisement for remaining parallel sessions and looking back at yesterday’s slides Lots More Joint Parallels Remaining Progress on Simulation/DGWG Too Much Material Here. Will be brief!

Background Simulation/MDI-Eugenio Paoloni

Many studies by many people since Annecy Geant4 Model Backward EMC DIRC (New Read out) ForwardTOF DCH R/O electronic material IFR (New segmentation) FWD EMC new segmentation

MDI group (detector side) organization Regular weekly meetings organized as 30’ reports from 2 / 3 sub-system. Last three meetings: EMC (fast sim. vs full sim) tracking (SVT + DCH) PID (IFR + DIRC + fTOF) very fruitful participation of the sub system contact persons and the sub system experts.

Lots of Bkg. Activities since Annecy SVT: thin striplets and the pixel L0 option studied ( Riccardo Cenci ) Minimal L0 radius 19 mm striplets ( 13 mm pixel option ) DCH: progresses in occupancies evaluation ( Dana Lindemann, R. C. ) Optimization of the tugsten shield shape and material in progress (Dana) fTOF: evaluation of doses and rates in progress ( Leonid Burmistrov ) EMC: full vs fast on rad.Bhabha bkg. simulation ( Stefano Germani, Chih-hsiang Cheng, Andrea di Simone ) IFR: neutron flux moderation and absorption by a paraffin layer on the outer side of the solenoid, simulation precision cross checks. Work in progress ( Mauro Munerato, Gigi Cibinetto ) Touschek bkg: simulation of the latest & greatest (even if smaller) lattice ( Manuela Boscolo ) Software: Bruno packaging ( Andrea di Simone )

SVT-Convener Rizzo

Vertex Detector (SVT) 40 cm 30 cm 20 cm Layer0

Large difference for thin pixels (50 um) and striplets (200 um). SVT Activities Definition of Layer0 configuration & performance for the different technologies (striplets-baseline, thin pixel - upgrade) Update on background: Hit rate vs Layer0 radius from pairs production depends strongly on sensor thickness: large cluster width for low momentum tracks with large crossing angle Large difference for thin pixels (50 um) and striplets (200 um). Sustainable background hit rate (radius) depends on technology: striplets vs pixel area and readout chip. Development of pixel chip readout architecture continue: data push and triggered with target 100MHz/cm2 (safety x5 included) with timestamp 100 ns.  radius ~1.3cm Evaluate efficiency of FSSR2 readout chip (striplets) vs rate (goal still 100 MHz/cm2): Verilog simulation results not very encouraging! Significant drop in efficiency ~ 20 MHz/cm2 Need to interact with Fermilab designers to understand if this is a real issue and in case if modification to digital part is possible. Started to investigate alternative option for striplets readout chip.

R&D on pixel options Better definition of the pixel module electronics Hybrid pixel: Prototype Front-end chip for hybrid pixel (32x128, 50 um pitch) tested Results in fair agreement with simulation Pixel sensor matrix produced and tested: good quality FE chip + sensor matrix bump-bonding in June and test in lab in September CMOS MAPS: Pixel readout architecture for next matrix (3D MAPS with 2 CMOS layers interconnected, ~Dec 2010) could work in data push and triggered mode triggered readout reduces pixel module complexity (lower speed for links & less material for pixel bus) Better definition of the pixel module electronics Progress on mechanical beam pipe design & integration of Layer0 modules on cooled flanges

DCH-Conveners Finnocchiaro & Roney

DCH Baseline Design DCH R&D Issues including: R&D has been started. Provides precision momentum Provides particle ID via dE/dx for all low momentum tracks, even those that miss the PID system. A new DCH (similar to now aged BaBar DCH, which must be replaced) Similar gas & cell shape (small improvements may be possible) Carbon Fiber end plates (to reduce material before endcaps) New electronics with location optimized. R&D Issues including: Electronics location and/or mass to reduce effect on backward EMC, Low Mass Endplates Can we do better on dE/dx (counting clusters)? Conical/stepped endplates or other ways to reduce sensitivity close to the beam. Background simulation/shielding optimization. R&D has been started. Need to test all solutions on prototype, DCH

Activity @ LNF “Prototype 1” is collecting cosmic ray data 6 x 4 BABAR–like hex cells, tracks extrapolated with ~80μm accuracy from drift-tube telescope Campaign with various He + iC4H10/CH4 mixtures and HV / threshold settings Space-time relations Spatial resolutions dE/dx 80%He-20%iC4H10 1960V 35%He-65%CH4 2760V

Activity @ LNF (cont.) ELECTRONICS Waveform acquisition of four proto1 channels integrated with DAQ Moderate-bandwidth preamps for now 97%He-3%iC4H10 1500V ELECTRONICS Proceeding with design of “standard” readout architecture VFB on endplates ROIB near new SOB Detailed study of electronics for cluster counting still to be done First simulations with 0.13mm IBM technology

Activity in Canada Preparations for the full-length prototype for cluster counting studies are continuing. Plan for beam in fall. 44 square cells, 15 mm square, 3 field wires per sense wire, plus surrounding cells for field shaping. Wire, feedthroughs, connectors, copper-clad mylar (outer cylinder), glues all on-hand. Three of four crimpers revived and ready to go. Montreal to do preamps and service boards

Activity in Canada (cont..)

Activity in Canada (cont..) Service Boards Drawing contains service board concepts, needed to plan mounting and ground points on endplate. Final design by Montreal group. readout at one end; HV and termination at other.

DCH sessions Mon. Mon. Tues.

PID-Conveners Vavra & Arnaud

Barrel PID DPR Design

Barrel PID  FBLOCK [SLAC]  Still waiting for bids from Corning to order raw material for the first FDIRC prototype  Secured partial funding. Additional requests in play  Worked on order some Shin Etsu RTV (SES 403) to start prototyping tests on how to make large glue joints between bar box, New Wedge and FBLOCK  Geant4 simulation [Maryland]  Ring images as a function of momentum, angle, wedge/no wedge, etc.  we need to decide if we want to have a micro-wedge  Mechanics [SLAC + Padova]  Ongoing work on the mechanical design  MaPMTs [SLAC + Maryland]  Modified PC board for MaPMT amplifiers  This amplifier is needed for the new MaPMT and the Maryland scanning setup  Electronics [LAL-Orsay + LPNHE-Paris]  FE board studies started – several designs being investigated currently  Joint mechanics/electronics discussion needed  FEE location, power, cooling, access, etc.

Forward PID E.g., GEANT4 Model FOR FTOF Device under study  Goal: to choose a design by the end of Summer  Review of different designs in parallel session  FARICH [Novosibirsk]  Updated design (Mg2F radiator), standalone MC studies  Beam test foreseen for the end of 2010  Quotes for Photonis MCP-PMTs requested  FTOF [LAL-Orsay + SLAC]  Improved design (more photons / track); progress on mechanical integration  First reconstruction studies using standalone MC  FastSim simulation tuning based on results achieved so far  Proposal for experiments in the SLAC Cosmic Ray Telescope (CRT)  Ongoing tests in the CRT on (a) start time resolution for the FDIRC prototype’s chromatic correction analysis, and (b) pixilated TOF counter candidates (G-APD, mesh-PMT) [SLAC]  Background [Nsk + LAL-Orsay + SLAC]  Estimations based on the FullSim outputs, propagated then to the detector models  Electronics  Ongoing work with WaveCatcher boards in the CRT  NIM paper on waveform digitizing electronics (Target chip & WaveCatcher board) E.g., GEANT4 Model FOR FTOF Device under study

EMC-Conveners (Cecchi & Porter)

St. Gobain: 12 crystals received for the Beam Test CRYSTAL STUDY St. Gobain: 12 crystals received for the Beam Test Metrology to check dimension is ongoing (5 measured within specs +- 100 μm) Light Yield measurement is ongoing (first results as expected) Uniformity testing just started SIPAT: new production to be tested (just started) schedule is to be ready for October Test Beam LY(1.17MeV)=1003 p-e/MeV LY(1.33MeV)=962 p-e/MeV MECHANICS Prototype structure for BT ready Development is ongoing for the whole structure Production method working Precision within tolerances Electrical conductivity achieved (common ground) What remains: Cost estimate in view of the 180 modules of a full endcap schedule for production to be completed in one year optical performance (to be studied with single cells) structural behavior (module elastic characterization, FEA of the support shell….)

APD’s strong temperature dependence READOUT, VFE, DAQ Final choice between PiN diodes (as in the Barrel) and APD’s has not yet been done: PiN would require intermediate step with PMT during uniformity measurements APD’s strong temperature dependence New: neutron induced signal in APD’s worse by a factor of 10 in PiN than in APD’s. 5 channels of the new electronics are under production and will be tested third week of June: test OK assembly up to 25 channels for October TB VFE to be modified recover and use 5 channels + 20 channels with APD’s and CMS DAQ

Detector Elements-IFR-Convener Calabrese

Advancements since last meeting(I): Prototype Preparation IFR Iron structure and detector small parts (PCB, fiber-SiPM coupling, module box, etc…) have been delivered: now focusing on scintillator modules preparation. All the fibers have been polished Fiber gluing techniques under study SiPM characterization and QC procedure established, setup in preparation. Working with some SiPM prototype, the final production will be delivered by June. WLS fibers PCB SiPM

IFR Advancements since last meeting (II): Simulations Fast Simulation PID tables for muons and pions, based on optimization results, are in preparation and will replace the BaBar tables in the next event production Detector Optimization Added and tested a 9-layers configuration Started with KL study. Background studies Neutron background analysis continues with the study of possible shielding and remediation: added polyethylene shielding, investigating the possibility to move the SiPM of the inner layers in a outer gap.

done done in progress Toward the TDR IFR Updated schedule Fall 09 finalize prototype design (mechanics and electronics) place orders for prototype construction (needed simulation results first) prototype assembly prototype test with cosmics test beam @ FNAL analyze/review test results and write the TDR done December 09 in progress January 2010 Fall 2010 December 2010 Spring 2011

Electronics, Trigger and DAQ- Conveners,Breton, Luitz, & Marconi

Base Design from DPR

L1 Trigger Baseline: Possible additions Challenge Other considerations re-implement BaBar L1 trigger with some improvements Shorter latency (~4us instead of 12us) Higher sampling frequencies (DCH and EMC) 2-d map for calorimeter Possible additions SVT trigger Bhabha Veto Challenge To keep the event loss due to dead time below 1% a maximum of ~70ns “per-event dead time” is allowed in trigger and FCTS Other considerations What goes in L1, what in L3, what’s the optimum? See trigger session (ETD 2) First meeting of “Trigger Interest Group” Interested new institutions (Roma and INFN) Events lost [%] 150kHz Exponential Inter-arrival time pdf. Per-Event Dead Time [ns] (scale: 0-60us) Events lost [%] Per-Event Dead Time [ns] (scale: 0-250ns)

ETD/Online: Main Themes for the Workshop Session 1: ETD / front-end Status talks of subdetector designs requesting a focus on their capacity and method to deal with 150kHz of trigger rate and a potential minimal distance of 70ns between triggers. Session 2: ETD / trigger Brief status of the first level trigger system including the building of the primitives from DCH and EMC, followed by discussions about architecture, synchronous links, processors, frequency, latency, Session 3: ETD / Online / common items Status of R&D on link, FCTS, ROM, Online Reminder of the rules for radiation mitigation (which will be a focus for the next workshop) Session 4: ETD / common items This session will be devoted to open discussion about a safe clock distribution, link coding and overhead, effects of trigger rate and inter-trigger distance, radiation mitigation, power supplies We will also plan the future ETD/Online dedicated workshops

Detector Geometry Working Group Activities since the Annecy workshop Rama/Stocchi

Detector geometry working group Several DGWG studies are completed (see mailman.fe.infn.it/superbwiki/index.php/Detector_Geometry_Working_Group_portal ) From the DGWG summary talk in Annecy: goal: final results at the LNF meeting in September (lower priority) (lower priority)

Goals and agenda Tuesday: Wednesday: Main goals of this meeting other B Recoil analyses will take advantage of this study Main goals of this meeting Identify subsets of generic BB background for Btn and BK(*)nn to speed up the Summer production Make better estimates of the impact of material in front of the fwd EMC, update the optimization of the IFR Tuesday: Wednesday:

Agenda

Detector Related Workshop Sessions 48

Focus of Workshop Review Progress and next steips for Overall Systems and Integration Issues Geometry Working Group Computing & Simulation ETD MDI/Background Integration Report system status progress and refine understanding needed towards final subsystem and general system design Complete Design R&D (Beam Tests & Milestones) Organization Build Manpower, Add Institutions Deeper WBS and associated engineering Define Specific Resources (Manpower and Budget Needs) Specific TDR Production Plans Documents and Planning Now  Finalize Progress Report Very Soon! Detailed Resource Planning & Requirements for TDR phase.  TDR (~ 1year). Progress in all areas, but more active people needed. Please engage your friends and colleagues! 49