RF Layout 3pi/2 for Discussion

Slides:



Advertisements
Similar presentations
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Click on this image to open the full PDF document.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Word Problems: Finding a Side of a Right Triangle (given a side and an angle) Note to Instructor: These word problems do not require Law of Sines or Law.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Cavity support scheme options Thomas Jones 25/06/15 1.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Standalone Commissioning Plan in MICE Hall K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review 9th Sept 2016.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
LCLS-II High Power RF L1-L3 Spaces Review Andy Haase Feb
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
MICE CM28 Engineering Session Summary (On behalf of Wing)
ProtoDUNE – DSS Installation, Alignment and QA
Status of the MICE Construction Project
Schedule CM SPS G.Vandoni.
SBN Far Detector Installation & Integration
Experimental hall design in Japanese site
A frequency choice for the SPL machine: Impact on hardware
Second SPL Collaboration Meeting, Vancouver May 2009
Chamber Design and Integration RE3/1 and RE4/1
Racks Coordination 09 September 2011 E. Negodin
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Step IV - Engineering Jason Tarrant – Integration Engineering
Detector hall in mountain regions
Presentation transcript:

RF Layout 3pi/2 for Discussion

Already have the 6” coax to go over the wall Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South RF couplers Already have the 6” coax to go over the wall No advantage in going through the wall 4616 Pre Amplifier 500kw Dummy Load Hybrid Splitter Directional Coupler in each line Flexible coax Directional Coupler 6 inch Line Trimmers TH116 Amplifier RF Distribution CM41 11/2/15 2

RF Distribution – Neglecting Vacuum Support Platform MTA advised not to use ‘T’ splitters, suggested hybrid splitter was a far better solution as it isolated the cavity couplers from each other. Propose to have 1off dummy load on the hybrid splitter to each RF cavity. Crane hook height fully retracted does not clash with the coax over the wall. RF Distribution CM41 11/2/15 3

2nd TH116 amplifier moved to 3rd position behind wall to use the space and ease installation in congested area Sufficient space on wall for additional identical water services panel……John Govans would like to modify existing panel. RF Distribution CM41 11/2/15 4

Platform scaffolding rqd to gain access to equipment and services running on top of the cooling channel RF Distribution CM41 11/2/15 5

RF Distribution – With Vacuum Support Platform Coax over the wall raised to avoid clash with vacuum support platform Crane hook height fully retracted may cause a potential clash with the coax……need to check Option for crane operation maybe to skate equipment under high level coax line Services to dummy loads not yet been considered……need to speak to Jason RF Distribution CM41 11/2/15 6

RF Distribution CM41 11/2/15 7

RF components routed over SS vacuum support platform “Dog Kennel” “Dog Kennel” can provide shielding for RF components Raised the height of the coax line over the wall from 242mm to 410mm…….will have to check crane height (potential clash) Hybrids splitters can move upstream & downstream & lowered to avoid any potential clashes, achieved by setting correct rotation angles on coax lines Suggest mounting coax supports off PRY steel work & “Dog Kennel”…….need to liaise with Jason & Steve Plate RF Distribution CM41 11/2/15 8

RF Distribution – Hybrids Behind North Wall Pros Hybrids and elbows no longer above cooling channel reducing stray field effects…….if stray field is a problem!!! Coax can run lower once over the wall Services to dummy loads might be easier Cons More coax required to match lengths to each side of the cavity More elbows required……need same number of elbows to each side of the cavity to equalise the loses to both sides Generally more loses due to increased lengths of runs Larger SF6 volume required RF Distribution CM41 11/2/15 9

RF Distribution – Hybrids Behind North Wall RF Distribution CM41 11/2/15 10

Comments Output line from amplifier is lower than the PRY, so needs to go high to clear PRY to couple to South RF couplers. True for all options. No advantage of going through the wall. Crane hook height fully retracted may clash with the coax. Original height of coax above wall was 242mm, increases to 410mm for vac services platform option. May need to skate loads under high level coax lines to avoid venting and refilling with SF6. Directional couplers included in layout 3 in total (1 off 6 inch, 2off 4 inch)…..these have been delivered 4” flexible coax 1m long shown in vertical lines…..these have been delivered Line trimmers to take up any length corrections…..these have been delivered Hybrid shown with existing 500KW loads (2off) …..these have been delivered Moved the second amplifier to position 3 behind wall to allow more space Run coax in 6inch as far as possible to the flexible coax line Will require additional and/or modified 6inch coax line lengths Current scheme is 4” coax under floor, be very difficult to run 6” coax under the floor RF Distribution CM41 11/2/15