Asbestos – Getting the Data Right

Slides:



Advertisements
Similar presentations
Quality and Outcomes Framework Assessor Training Skills in note-making, summarising and report writing Module S5.
Advertisements

Swansea and West Wales Occupational Safety Group Peter Harris Micad.
Educational Champion Training MODULE 3: Communication with Child and School © National Center for Youth Law, April This document does not constitute.
Vice President of Facilities
Acme Corp Case Management Proposal Randi Craig 03 August 2013 Case Management Financial Services HR ServicesData Compensation Services.
Presumed Asbestos Product Overview Understanding the Functionality and Benefits of Presumed Asbestos™
Contractor Safety Management
Office of Inspector General (OIG) Internal Audit
Allied health student training Pre-placement training requirements Welcome to the video-conference. This video-conference will be recorded. Your participation.
Using employee feedback as a means to improve employee management.
10/20/ The ISMS Compliance in 2009 GRC-ISMS Module for ISO Certification.
Digital Dictation Pilot within CMHT Anton Faulconbridge Rantmedia.
Preparing for, planning and implementing change Practical tips for managing projects Christian Fielder 17 November 2014.
Slide 1 Subpart O What’s Working & What’s Not Deepwater Operations Conference and Exhibition November 10-12, 2009.
Internal Auditing ISO 9001:2015
14 May 2014 Information Security, Information Governance and the Law – Confidence in Compliance © Contact Leonardo for reuse
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
UNLIMITED 24 HOUR CONSULTING SERVICES GURU (4878)
Sleep Baby Safe Introducing the Newborn Nest. Objectives Upon completion of training, you will confidently: Understand the “why” behind alternative sleep.
Campus Networking Best Practices This Presentation and related materials will be available at: nsrc.org/tutorials/2008/sanog12 Help Desk Services.
What is a Functional Spec?  Defines what the functionality will be NOT how it will be implemented  Describes features of the software product product's.
Janet Harrison and Samuel Nikoi
Governing Body QAPI 2013 Update for ASC
IS YOUR ORGANISATION’S INFORMATION SECURE?
Introduction This presentation is being provided for staff who may be starting a veteran parent program to support FICare The narrative on the slide notes.
We always have time to work safely
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Areas Separate Approaches Parallel Approaches Joint Approaches
Utilising Software to Manage Compliance
Estates Management | Open, Safe & Compliant theory into practice
“Any fool can know. The point is to understand
Incident handling and transparency Duty of candour
VP, Institutional Services
Taking an Iteration Down to Code
Rail Safety Worker Engineering and Design Competency
Contractor Management Update
Your Organisations Memory
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
Looking at your program data
Scarborough and Ryedale – Staff Engagement Events April 2018
Avon & Wiltshire Mental Health Partnership NHS Trust: Suicide data: open and transparent? Welcome.
INTERVENTION Goal Zero. No Harm. No Leaks..
Week 9.
SCC Supplier Performance Management (SPM) Training
Driver Safety Management System
Workplace Health and Safety
CQC Compliance Outcome 11
Higher and Degree Apprenticeships Guidance on Identifying 20% off the job learning (v1.1, April 2018) Sam Moorwood BLE PGCLTHE HEA MRICS Head of.
12/9/2018 3:38 PM Quality Improvement Plans (QIPs): Aligning the Content to the QIP Guidelines.
Deloitte Consulting LLP SCOOPS Session
Comp. II.
Questions you may get from your EU customers, and
Workforce Engagement Survey
Dr. Rob Hasker SE 3800 Note 9 Reviews.
M253 Team working in distributed environments
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
Utility arborist assoc. Safety Summit 2017 Safety Commitments
New employee induction for new staff and managers
Risk Assessment – Space Only Stands
Learning Management System (LMS) Alignment Meeting April 02, 2019
Start Commenting Trulia Voices Linkedin Answers Answers.yahoo.com
Sales Managed Environment®
Sample Assessment & Governance Results
Implementation Business Case
Measuring the Mountain
Nonconformity Writing
RISK MANAGEMENT CENTER
Engaging Management in Digital Accessibility action
Presentation transcript:

Asbestos – Getting the Data Right Peter Harris – Mile End Hospital – Case study

Mile End Hospital Case Study - Background Largely a late Victorian site Huge history of project and refurbishments Asbestos had been introduced over decades in the 1900s A long established user of the IPR and asbestos Has historically managed asbestos Proactive passionate onsite estates manager Hadn't succeeded with the asbestos module

The phone call from Steve Royce… April 2015 The phone call from Steve Royce…

The call Content… Opening line: Peter, your asbestos software is rubbish! I know I am manging the risk but I can’t evidence it I can’t use the system It’s a nightmare My contractors can’t use it My colleagues cant use it Its so bad even Floody cant use it!

My response Steve, the client is always right but in this case and with total respect you are wrong! Let me come and see you A week later I went to see Steve and despite Steve being someone who has a good track record on asbestos management, this is what I found…

The Bird’s eye view

The data issue Like many clients data was in the system but with holes preventing data compliance

Typical example

The Most Common Data Issue Spaces without an assessment being undertaken No re-inspection event data set No access assigned but with no assessment undertaken Consultants not referencing their samples correctly Lack of photographic evidence Documents including , survey reports, 4 stage clearance tests, method statement etc not being published to the system

How we solved the problem Steve listened and took time to learn the system capabilities A training session was undertaken He engaged his consultants He specified exactly what he wanted and how he wanted the system to demonstrate his success He pushed hard and started getting results quickly A few buildings were piloted to ensure through new surveys and re-inspections that the data was housed correctly in the Micad system Once the benchmark was set the rest of buildings were completed The journey and results..

Within 6 month – Total data Compliance

Management console

Proof of success Steve now uses the system to benchmark the consultants performance Now the data is correct, keeping it compliant is so much easier Absolute clarity exists as to what needs responding to in terms of managing risk and re-inspections This case study is now being used as a template for the other large hospital sites across the Barts NHS Trust This accurate data can now be fed to contractors and staff via the Asbestos Portal My phone calls with Steve are now much easier!

Key points to remember Remember it’s a duty to manage not survey Who is responsible – you need a driver with ownership – Steve in this case study Make sure the is client in control of the data not the consultant Specify what you want your supplier to do Use Micad to benchmark their performance and show your data compliance – don’t pay them otherwise if you have written into your contract specification Use CAD or Space data Integration Set out to… Demonstrate complete compliance visibility with CAR2012 Reduced long term asbestos management costs (ROI) Reduce liability arising from exposure, claims and failure to meet statutory requirements Improved business practice - ‘Doing the right thing to become best in class’ Keep your staff and contractors safe