Test Beam Request for the Semi-Digital Hadronic Calorimeter

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
SDHCAL I.Laktineh TB strategy The PS TB was indented to validate the whole system (including the DAQ) and to select the right thresholds values.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Developing Imaging Calorimeters for a SiD-Flavor Lepton Collider Jacob Smith Linear Collider Physics School Ambleside,England 2009.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
1 Construction of technological semi-digital hadronic calorimeter using GRPC Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
The European DHCAL status
Felix Sefkow DESY LDC at Vienna November 17, 2005
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
A Digital Hadron Calorimeter Resistive Plate Chambers
SiD Calorimeter R&D Collaboration
The Simulation Status of SDHCAL
IHEP group Shashlyk activity towards TDR
Status of Ecal(s) for ILD
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
10/month is the present production rate 2 FTE + sporadic contributions
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Michele Faucci Giannelli
MICROMEGAS DHCAL Intro
Status of CEPC HCAL Optimization Study in Simulation LIU Bing On behalf the CEPC Calorimeter working group.
LC Calorimeter Testbeam Requirements
Presentation transcript:

Test Beam Request for the Semi-Digital Hadronic Calorimeter

The Technological prototype Goal : to build a prototype of very compact, ultra-granular HCAL using GRPC with semi-digital embedded readout electronics PFA The prototype should be as close as possible to SDHCAL concept proposed for ILD Barrel Module gas  Self-supporting mechanics  Minimized dead zone  Minimized thickness  One-side services  Power pulsed electronics Beam Beam The prototype will be made of 40(48) units. Each unit is made of : 1.5+.5 cm absorber + 0.6 cm sensitive medium 1 cm2 transversal granularity This is about 5(6) λI and 368640(442368) channels

Advantages of a semi-digital gaseous HCAL Gaseous detectors : Homogeneity, granularity, cost-effectiveness Power-pulsed semi-digital readout : A binary readout digital HCAL using GRPCs was already built and proved to be successful. However, at high energy the shower core is very dense simple binary readout will suffer saturation semi-digital readout (2-bit) can improve the energy resolution. GRPC Avalanches 1 cm2 pad

History: Small GRPC The SDHCAL group of the CALICE collaboration have conducted extensive TB to check: GRPCs performance : Both small, intermediate and large GRPCs were tested Readout Electronics : The essential part of the readout electronics chain was tested Successfully tested. (ASICs, DIF...)

Large GRPC and cassette construction : Many evolutions….. 144 ASICs= 9216 channels/1m2 1 pad= 1cm2 , interpad distance = .5 mm

Prototype Construction The construction of the prototype has started two months ago and is expected to Finish end of March. ASICs and DIFs : all tested and calibrated. PCBs are being produced and cabled GRPCs components are available. Assembling is ongoing (20 chambers are already built) DAQ hardware components are available. Software development is ongoing Mechanical structure construction is ongoing. Gas distribution system is ready. It was built according to CERN safety department recommendation

Assembling procedure Final thickness : 11 mm Clearance : 2 mm in Z 4 mm in X Insertion test Final thickness : 11 mm

Cassette validation 2 full cassettes were successfully tested at T9-PS May 2010 and H4-SPS in September 2010

Cassette to be inserted in the Mechanical structure Services racks The SDHCAL prototype scheme

Strategy : Test-Beam we need a special movable and rotating stage capable of supporting up to 10 tons. We need also to use a TB line which provides low energy pions. These two conditions limit our choice. Contact with ATLAS Test Beam coordinator was established to see if we can use the ATLAS stage on the H8 line. This line is one of two lines able to provide hadron beam as low in energy as 2 GeV.

Test-Beam program First period (July-August): Three kinds of particles beams will be requested 1- Muons: To control the detectors and estimate their efficiency in situ. To align precisely the detectors inside the HCAL 2- pions: To study energy resolution in the 2-100 GeV range. 3- Electrons : To study the HCAL response to a pure electromagnetic particles In addition to energy scan, there will be angle scan as well as a threshold scan. The latter allows to select the best values for a better energy resolution

Test-Beam program Second period (October-November) : The aim of this test is to have a deep understanding of the hadronic shower behavior once the detector response is well understood. We would like to have by that time 48 units (as for the modules proposed for ILD (56 λI)) . We intend also to have a combined test with the CALICE ECAL detector which represents an additional λI

Power-pulsing test In 2010 the power-pulsing scheme was tested for the first time with the 3-Tesla H2 magnet Trig_ext (Lemo1) Enable Acq Enable PP Vth2 Power On Power Off 50 µs Time to previos event (ms) PP is on during 2 ms every 10 ms rather than every 200 ms for ILC PP ∆t>100µs PP ∆t>1000µs No PP ∆t : Delay of data taking with respect to PP

Power-pulsing test In the parasitic mode very short time was dedicated to this test in low density conditions (< 100 Hz/cm2 to have efficient GRPC) So we need more statistics to confirm the nice results in all possible conditions (orientation with respect to magnet field, high voltage, thresholds....) The test will be also used to check the DC-DC module behaviour in a magnetic field of 3 teslas Two weeks seem necessary