Gantt Chart.
Advertisements

Activity Produce a project plan – George Bailey has bought a plot of land on which he wants to build a house. The house will be two storeys high and will.
Project Scheduling: Gantt/Pert Charts
Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.
CONSTRUCTION SCHEDULING. steps to effective time management Examine the Contract List Major Contractual Obligations Divide Project into Major Work Areas.
Planning & Scheduling Systems: From Design to Fabrication.
Project Management UO Lab 477 February What is a Project? Clear beginning and end Requires a budget Requires significant time Requires resources.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Business Studies Grade 11.
Quality Function Deployment Quality Function Deployment QFD Vivian Cherie KJ.
BAR CHART Develop by Henry Gantt. Definitions Activity
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
Chart Basics Paul Morris CIS144. Gantt Charts Gantt charts are essentially bar graphs that help plan and monitor project development, resource allocation,
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
CS 160: Software Engineering October 20 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
BAR CHART Develop by Henry Gantt. Definitions Activity
10/24/11 - Workflow ManagementCopyright Joanne DeGroat, ECE, OSU1 Project Workflow Management.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Lecture 11A.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Manipulating data. Manipulating data means: Putting it into a structure (e.g., tables in a database) Putting it into a computer model.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Management “Project Planning & Scheduling”
Framing the House. Platform Framing Platform framing.
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Competency: Draw exterior elevations
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Discussion. Where were some of the earliest two story homes built? (159) 1.
Project Scheduling Class 7.
Project Management Planning Techniques
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Managing the Information Systems Project Cont’d
Foundations of Technology Construction
Introduction to Project Management
Project Scheduling
Principles of Architecture & Construction
Multifamily and Single-family Homes
Fall 06 ECE 361 Project Schedule
Think: Why should we believe we have rights?
Drawing & Building Names
Progress Charts.
Gantt Charts.
Tools for project scheduling.
Planning and Scheduling a SIMPLIFIED Construction Project
System analysis and design
UML Activity Diagrams.
Competency: Draw exterior elevations
Framing the House                                                                                                                   
Assignment #3 Group 3.
PROJECT MANAGEMENT Bill Biddle.
Project Name – ID # 7/1/2009 Current Project Status Project Issues
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Workflow applications
THE HIERARCHY OF SCHEDULES
Gantt Chart.
Forging new generations of engineers
Foundations of Technology Construction
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
LINEAR BALANCE METHOD & MATRIX SCHEDULE
CMPE/SE 131 Software Engineering March 23 Class Meeting
Principles of Management Learning Session # 21 Dr. A. Rashid Kausar.
Project Timeline using Microsoft Project
Time Scheduling and Project management
Scheduling.
Presentation transcript:

Gantt Chart Presentation Name Course Name Unit # – Lesson #.# – Lesson Name Gantt Chart Introduction to Engineering Design © 2012 Project Lead The Way, Inc.

History of the Gantt Chart Henry L Gantt, an American engineer in 1917, developed a horizontal bar chart used as a production control tool. The Gantt chart provides a graphical illustration of activities to be completed according to a specific time schedule. On the left side of the chart is a list of activities. Along the top is the time frame during which each activity is to be completed.

Sequential and Parallel Tasks Presentation Name Course Name Unit # – Lesson #.# – Lesson Name Sequential and Parallel Tasks Project planning organizes tasks Task types: Sequential or linear Task dependent on completion of another task Nondependent or parallel Task not dependent on completion of any other tasks Tasks may be done at any time before or after a particular stage is reached An essential concept behind project planning is that some tasks are dependent on other tasks being completed first. It is not a good idea to start building a house before you have designed it! These dependent tasks need to be completed in sequence, with each stage being completed before the next tasks can begin. We can call dependent tasks sequential or linear. Other tasks are not dependent on completion of any other tasks. These may be done at any time before or after a particular stage is reached. These are nondependent or parallel tasks.

Gantt Chart: Virtual Design Activity

Gantt Chart Example What tasks are needed to build a house? In what order do the tasks need to be performed? Can any tasks be performed at the same time as another task?

Gantt Chart: House Construction Ground

Gantt Chart: House Construction Foundation work starts as site is cleared Foundation Ground

Gantt Chart: House Construction Floors can start after Foundation is completed Floor Foundation Ground

Gantt Chart: House Construction Walls Landscape Floor Foundation Ground

Gantt Chart: House Construction Roof Roof is partially constructed as walls are being built Walls Floor Foundation Ground

Gantt Chart: House Construction Roof Siding started once walls are complete and while roof is being built Siding Walls Floor Foundation Ground

Gantt Chart: House Construction Roof All tasks are complete Siding Walls Landscape Floor Foundation Ground