Status Report on Bonding at Catania

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Pellet Dies: User Instructions Read these instructions carefully before beginning work. Read the risk assessment. If you have not used the die and hydraulic.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Delight QuickBooks Online Banking Internal Support Training QuickBooks Windows 2009/2010 Online Banking.
Programming. What is a Program ? Sets of instructions that get the computer to do something Instructions are translated, eventually, to machine language.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Database Management 9. course. Execution of queries.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Module 6 Securing Content. Module Overview Administering SharePoint Groups Implementing SharePoint Roles and Role Assignments Securing and Auditing SharePoint.
WINDOWS 8.1 WINDOWS 8.1 RT INTERNET EXPLORER 11 Is this the time for me?
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
DGAS Distributed Grid Accounting System INFN Workshop /05/1009, Palau Giuseppe Patania Andrea Guarise 6/18/20161.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
ATLAS pixel module assembly flow
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Bonding web site, renovated
Commissioning and Testing the LHC Beam Interlock System
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Executive summary from Bonding WG Meeting 21 Oct 2003
Module Production Status in Florence
CMS Perugia Modules Production Review
Module production in Italy
Bari production centre resp. M. de Palma
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
CMS Perugia Gantry Status Report
Module Testing at UCSB: Simulated Production 11-04
REST APIs Maxwell Furman Department of MIS Fox School of Business
TEC module quality overview
TOB Module Production Overview and Plan
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania

Machine Fix, Upgrade,Tune-up …Wire breaking problem… Help from colleague with extensive past experience with Hughes, Enrico Scarlini of Florence (thanks!) Adjusted bonding parameters [e.g. a much lower ”Z speed”: 10 vs. 100, default is 231, do not exceed 20] Replaced tool Mounted wire despooler Disabled upper wire clamp Lubricated head travel shafts (it would not reach full rest position or it would jam onto piece) Cleared axis initialization failures

Bonding Test # 2 (1) Pre-Bonding visual inspection under microscope showed same damaged pads (scratches across rows of pads) in PAs. [Piece was no longer sticking to ESD box when I opened the box]. Used Hughes loop mode “5”, a simple 1-parameter (loop height) arch. Set loop height=150 (mm or .1 mil ?) …measure ?… for all bonds (SEN-SEN and PA-SEN)

Test bonds on Test Areas… Bonding Test # 2 (2) Test bonds on Test Areas… (Destructive) Pull Tests with automatic Puller: 8-12 g break force mid-span break

Bonding Test # 2 (3) HPK - ST SEN bonds Used following bond parameters (for both ends): Force: 20 Time: 40 U/S: 55 No problems during bond program execution Post-Bonding visual inspection: All bonds OK

Bonding Test # 2 (4) PA - HPK SEN bonds Used same bond parameters as for HPK - ST SEN bonds Some problems during bond program execution: Wire would not hold onto scratched spots of pads manually bonded choosing a different spot on pad 3 funny loops pulled out and redone 1 wire almost touching neighbor gently pushed aside with pliers At last bond, PA seemed short of 1 pad: First one missing!

Bonding Test # 2 (5) PA - ST SEN bonds Using same bond parameters as for HPK - ST SEN or PA - HPK SEN bonds, wire would not stick to PA pads Increased some parameters: Time: from 40 to 50 U/S: from 55 to 65 At visual inspection first few SEN pads will show traces of pulled wires from SEN pad Except for this, all bonds should be OK.

Bonding Jig Being distribued by Filippo Bosi, Pisa Got “Type 1” jig for (single sided) TIB modules Should get “Type 2” jig for (double sided) TIB modules sometime He said he is currently designing jigs for stereo TIB and for TID modules

Bonding Tool From Saneco, n. 4284 Concave…

Test System We have identified a person in charge of this ARC has been installed and is going to be tested

Bonding Lab Upgrade Purchased (for a nominal price) a second (used) Hughes, being dismissed by CERN Will transport to Catania tomorrow Might be operational in September (after we move to new building)

Next Step Bonding a dummy module Bari has promised they will assemble a dummy module for us to bond ad soon as HPK sensors arrive

…break…

DataBase Interface Update Salvatore Costa University and INFN – Catania

Interface Releases (1) Version 0.1 was released on 13 March 2002 Non-working evaluation version: See interface look Stimulate communication of center-specific input data from Center DB responsibles to me. Version 0.2 to be released soon Working evaluation version: Exercise all functions Will include User’s Manual Includes people’s comments to v. 0.1 Center specific defaults and lists (where available) All data stored in Catania…will eventually be deleted!

Interface Releases (2) Version 1.0 will follow shortly Production version: Available for download from Web site in Catania Will include installation instructions Installation will create Center-specific version (same look, different default and list values) Initially for Unix only, will make version for Windows if requested Data will be stored locally to Center and will be broadcast to TrackerDB when “VALIDATED”

Center “DB Readiness” Center DB Responsible Input Data Aachen Wolfgang Braunschweig MISSING Bari Valeria Radicci OK Catania Salvatore Costa CERN Alan Honma FNAL Bill Kahl Florence Simone Paoletti Karlsruhe Hans-Jürgen Simonis Padova Maurizio Loreti TOO EARLY Pisa Andrey Starodoumov Santa Barbara Strasbourg Pierre Juillot Torino Ernesto Migliore Vienna Thomas Bergauer Zurigo Klaus Freudenreich

Data Recording In TrackerDB Do we all agree that, as it is currently foreseen in the Interface v. 0.1, PRE-BONDING, BONDING, POST-BONDING and BONDING REPAIR data are independently recorded in the central TrackerDB as soon as they are individually VALIDATED? Of course the Interface will have itself checks so that you cannot VALIDATE, say, POST-BONDING data until BONDING data have been.